Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20111B465 + (06:17:02, 13 December 2024)
- ML20111B461 + (06:17:03, 13 December 2024)
- 05000352/LER-1985-020, :on 850130,reactor Encl HVAC Sys Isolated Upon Receiving Low Differential Pressure Signal.Caused by Temporary Circuit Alteration.Personnel Cautioned Not to Determinate Wires W/O Approval + (06:17:05, 13 December 2024)
- ML20111B454 + (06:17:06, 13 December 2024)
- ML20111B448 + (06:17:07, 13 December 2024)
- ML20111B436 + (06:17:09, 13 December 2024)
- ML20111B424 + (06:17:11, 13 December 2024)
- ML20111B420 + (06:17:12, 13 December 2024)
- ML20111B419 + (06:17:12, 13 December 2024)
- 05000413/LER-1985-009, :on 850131,during Loss of Control Room Functional Test,Safety Injection Occurred.Caused by Component Malfunction.Safety Injection Reset,Closing Cold Leg Safety Injection Valve + (06:17:14, 13 December 2024)
- ML20111B413 + (06:17:15, 13 December 2024)
- ML20111B412 + (06:17:16, 13 December 2024)
- ML20111B407 + (06:17:17, 13 December 2024)
- 05000352/LER-1984-022, :on 841129,two Reactor Encl Fire Penetrations Discovered Not Sealed.Caused by Failing to Reinstall Seal After Const Activities & Failure of Personnel to Recognize Use of Spare Conduit Would Result in Violation + (06:17:18, 13 December 2024)
- ML20111B401 + (06:17:21, 13 December 2024)
- ML20111B398 + (06:17:21, 13 December 2024)
- ML20111B392 + (06:17:22, 13 December 2024)
- ML20111B388 + (06:17:26, 13 December 2024)
- ML20111B371 + (06:17:26, 13 December 2024)
- 05000278/LER-1985-005-01, :on 850129,total Combined Leakage of Types B & C Tests Exceeded Allowable Leak Rate Limit.Valves W/Unacceptable Leak Rates Repaired & Retested + (06:17:28, 13 December 2024)
- 05000361/LER-1984-073, :on 841130,control Room Isolation Sys Train B Spuriously Actuated by Radiation Monitor 2/3 RI-7825.Caused by Electrical Noise Spike of Unknown Origin.Cause Being Investigated.Sys Reset & Secured + (06:17:31, 13 December 2024)
- ML20111B362 + (06:17:32, 13 December 2024)
- ML20111B357 + (06:17:33, 13 December 2024)
- 05000251/LER-1984-026-01, :on 841124,automatic Initiation of Auxiliary Feedwater Sys Occurred.Caused by Personnel Oversight by Not Maintaining Adequate Level in Steam Generator B.Auxiliary Feedwater Pumps Stopped & Secured + (06:17:35, 13 December 2024)
- HL-5160, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent,Over Fuel in Reactor Core or Over Safety- Related Equipment + (06:17:36, 13 December 2024)
- 05000261/LER-1984-011, :on 841129,leak Path Opened from Outside Containment to Outside Containment,Violating Containment Integrity.Caused by Opened Vent Valve Allowing Svc Water Line to Drain for Welding Repairs + (06:17:37, 13 December 2024)
- HL-5172, Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 1 Cycle 17 Colr. Rev Reflects Analysis & Associated Min Critical Power Ratio Penalties,Would Be Imposed for Operation W/Inoperable Main Turbine Bypass Valves + (06:17:39, 13 December 2024)
- ML20111B342 + (06:17:39, 13 December 2024)
- 05000346/LER-1984-017, :on 840821,Tech Spec Late Date for Surveillance Requirement 4.7.9.3a Re Visual Insp of Fire Hose Stations Exceeded.Caused by Personnel Error.Test Sys Converted + (06:17:41, 13 December 2024)
- ML20111B321 + (06:17:42, 13 December 2024)
- 05000219/LER-1984-032, :on 841126,monthly Channel Test of Main Steam Line Safety & Relief Valve Acoustic Monitors Not Performed within Required Tech Spec Time Period.Caused by Personnel Error.Personnel Counseled + (06:17:44, 13 December 2024)
- ML20111B311 + (06:17:45, 13 December 2024)
- 05000324/LER-1984-018, :on 841127,automatic Reactor Scram Occurred Due to Main Turbine Trip & Stop Valve Closure.Caused by Crud Accumulation in Instrument Internals of Level Switch 2-MD-LSH-MS-2.Instrument Internals Cleaned + (06:17:46, 13 December 2024)
- RBG-19637, Interim Deficiency Rept DR-265 Re TDI-supplied Shielded Cables in Excitation Cabinets of Standby Diesel Generators. Initially Reported on 841113.Wiring Changed.Next Rept Will Be Submitted by 850214 + (06:17:47, 13 December 2024)
- ML20111B295 + (06:17:48, 13 December 2024)
- 05000370/LER-1984-031, :on 841124,trip Occurred Due to Failure of Loop Power Supply Card in Process Control Sys Causing Downward Spike in Channel of Overtemp Differential Temp Setpoint Circuit.Caused by Poor Cable Connection + (06:17:50, 13 December 2024)
- RBG-19735, Final Deficiency Rept DR-230 Re Air Start Valve of Cylinder 8 of Tdi Standby Diesel Generator 1EGS*EG1A.Initially Reported on 841119.Entire Air Start Assembly Replaced in Accordance W/Manufacturer Instructions + (06:17:51, 13 December 2024)
- ML20111B290 + (06:17:52, 13 December 2024)
- ML20111B289 + (06:17:52, 13 December 2024)
- ML20111B283 + (06:17:53, 13 December 2024)
- ML20111B270 + (06:17:54, 13 December 2024)
- ML20111B280 + (06:17:54, 13 December 2024)
- AECM-85-0045, Final Part 21 & Deficiency Rept Re Possible Failure of Polycarbonate Bowls on Air Filters for Tdi Engine Control Panels.Initially Reported on 850213.Polycarbonate Bowls Replaced W/Metal Bowls + (06:17:55, 13 December 2024)
- ML20111B267 + (06:17:55, 13 December 2024)
- ML20111B264 + (06:17:57, 13 December 2024)
- ML20111B263 + (06:17:57, 13 December 2024)
- U-602586, Monthly Operating Rept for Apr 1996 for Clinton Power Station Unit 1 + (06:17:58, 13 December 2024)
- ML20111B246 + (06:17:59, 13 December 2024)
- RC-96-0134, Monthly Operating Rept for Apr 1996 for VC Summer Nuclear Station + (06:17:59, 13 December 2024)
- ML20111B244 + (06:18:00, 13 December 2024)
- RBG-19711, Corrected Interim Deficiency Rept DR-236 Re Piston Wrist Pins in TDI-supplied Standby Diesel Generator.Next Rept Will Be Provided by 850117 + (06:18:00, 13 December 2024)
- ML20111B238 + (06:18:01, 13 December 2024)