Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112D039 + (06:03:53, 13 December 2024)
- ML20112D038 + (06:03:54, 13 December 2024)
- ML20112D035 + (06:03:55, 13 December 2024)
- ML20112D023 + (06:03:56, 13 December 2024)
- ML20112D020 + (06:03:56, 13 December 2024)
- 05000321/LER-1996-008, :on 960430,reactor Pressure Increase Resulted in Automatic Reactor Shutdown.Caused by Inadequate Procedure.Procedures Revised + (06:03:58, 13 December 2024)
- 05000333/LER-1996-005-01, :on 960506,error in Safety Limit Minimum Critical Power Ratio (MCPR) Calculation Occurred.Caused by Error in Calculation of Methodology.Administrative Controls Re Operating MCPR Instituted + (06:04:01, 13 December 2024)
- 05000446/LER-1996-005-01, :on 960505,both Main Feedwater Pumps Tripped While Resetting Control Sys.Caused by Personnel Error.Util Will Enhance Applicable Procedures to Provide Guidance & Caution + (06:04:03, 13 December 2024)
- 05000352/LER-1996-011, :on 960425,manual Operation of CREFAS Sys Resulted from Initiation of Toxic Chemical Detection Sys. Caused by Insufficient Guidance in Planning Process.Work Packages for Cleaning & Sealing Reviewed + (06:04:05, 13 December 2024)
- ML20112D010 + (06:04:06, 13 December 2024)
- ML20112D009 + (06:04:09, 13 December 2024)
- ML20112C994 + (06:04:13, 13 December 2024)
- ML20112C992 + (06:04:15, 13 December 2024)
- ML20112C986 + (06:04:15, 13 December 2024)
- ML20112C982 + (06:04:16, 13 December 2024)
- ML20112C980 + (06:04:17, 13 December 2024)
- ML20112C976 + (06:04:18, 13 December 2024)
- ML20112C975 + (06:04:18, 13 December 2024)
- ML20112C972 + (06:04:19, 13 December 2024)
- ML20112C970 + (06:04:20, 13 December 2024)
- ML20112C969 + (06:04:21, 13 December 2024)
- 05000416/LER-1985-008-01, :on 850213,instrument Air Compressor Tripped Due to Low Cooling Water Pressure.Caused by Air Usage Pulling Header Pressure Down Low Enough to Isolate Precoat Filters.Design Enhancements Planned + (06:04:23, 13 December 2024)
- ML20112C965 + (06:04:25, 13 December 2024)
- 05000416/LER-1984-055, :on 841130,discrepancies Identified Between Design & Commitments to Reg Guide 1.63 Involving Overcurrent Protection of Containment Penetrations + (06:04:26, 13 December 2024)
- ML20112C962 + (06:04:30, 13 December 2024)
- ML20112C955 + (06:04:32, 13 December 2024)
- ML20112C953 + (06:04:33, 13 December 2024)
- 05000341/LER-1996-006, :on 960324,missed ASME Section 11 Required Surveillance Insp.Caused by Inadequate Review of Change in Inservice Testing Program.Check Valve Inspected & Relief Request VR-48 Revised + (06:04:35, 13 December 2024)
- U-602589, Forwards Proposed Change to QA Program Description Re Licensed Operator Requalification Training Program + (06:04:36, 13 December 2024)
- ML20112C932 + (06:04:37, 13 December 2024)
- 05000336/LER-1996-022-01, :on 960423,determined That Single Failure of Hydrogen Purge Valves Would de-energize Heaters for Both Trains of Enclosure Bldg Filtration Sys.Caused by Error in Original Design.Implemented Design Change + (06:04:43, 13 December 2024)
- ML20112C921 + (06:04:44, 13 December 2024)
- ML20112C917 + (06:04:45, 13 December 2024)
- ML20112C912 + (06:04:46, 13 December 2024)
- TXX-9636, Forwards Response to Violations Noted in Insp Repts 50-445/96-04 & 50-446/96-04.Corrective Actions:Rhr Pump 2-01 Started & Flow Restored to Normal + (06:04:47, 13 December 2024)
- ML20112C911 + (06:04:47, 13 December 2024)
- ML20112C908 + (06:04:48, 13 December 2024)
- ML20112C899 + (06:04:53, 13 December 2024)
- NRC-96-0052, Submits Special Rept Describing Changes to or Errors in Acceptable Evaluation Model Used for Calculating ECCS Performance,In Accordance w/10CFR50.46 + (06:04:53, 13 December 2024)
- ML20112C891 + (06:04:54, 13 December 2024)
- ML20112C889 + (06:04:55, 13 December 2024)
- ML20112C884 + (06:04:56, 13 December 2024)
- ML20112C881 + (06:05:03, 13 December 2024)
- ML20112C879 + (06:05:04, 13 December 2024)
- ML20112C875 + (06:05:05, 13 December 2024)
- ML20112C874 + (06:05:05, 13 December 2024)
- ML20112C869 + (06:05:06, 13 December 2024)
- ML20112C864 + (06:05:07, 13 December 2024)
- 05000352/LER-1985-024, :on 850208,spurious half-scram Signal on Reactor Protection Sys Channel B Occurred.Caused by Voltage Fluctuations from Voltage Regulator board.Half-scram Signal Reset + (06:05:09, 13 December 2024)
- 05000322/LER-1985-007, :on 850204,hourly Fire Watches Not Completed within Hourly Basis.Control Room Personnel Assigned to Perform Fire Watches Concurrent W/Other Duties.Watches Reassigned to Personnel W/No Other Duties + (06:05:14, 13 December 2024)
- ML20112C853 + (06:05:15, 13 December 2024)