Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4300, Forwards Response to NRC 840828 Request for Addl Info Re Max Interpass Temp Control & Nonelevated Preheat Control Based on Violations Noted in Insp Repts.Procedures for Welding on Notch Toughness Matls Will Be Revised + (05:48:23, 13 December 2024)
- ML20112F967 + (05:48:23, 13 December 2024)
- ML20112F945 + (05:48:25, 13 December 2024)
- ML20112F937 + (05:48:26, 13 December 2024)
- ML20112F920 + (05:48:27, 13 December 2024)
- ML20112F930 + (05:48:27, 13 December 2024)
- ML20112F906 + (05:48:28, 13 December 2024)
- ML20112F889 + (05:48:29, 13 December 2024)
- ML20112F882 + (05:48:30, 13 December 2024)
- 05000366/LER-1996-001-03, :on 960508,safety Limit Min Critical Power Ratio for Unit 2 Cycle 13 Found Not Conservative.Caused by GE Methodology Used to Calculate Generic SLMCPR Did Not Yield Conservative Value.Olmcpr Increased + (05:48:32, 13 December 2024)
- ML20112F857 + (05:48:34, 13 December 2024)
- ML20112F838 + (05:48:35, 13 December 2024)
- ML20112F845 + (05:48:35, 13 December 2024)
- 05000261/LER-1985-009-01, :on 850227,main Transformer Lightning Arrestor C Failed,Resulting in Turbine & Reactor Trip.Cause Not Determined.Lightning Arrester Replaced + (05:48:37, 13 December 2024)
- NSD-NRC-96-4739, Forwards Draft Mark Up of Chapter 54 of AP600 Probabilistic Risk Assessment (PRA) Covering Low Power & Shutdown PRA Assessment.Pra Section Revised to Incorporate Commitments Westinghouse Made in Response to RAIs + (05:48:41, 13 December 2024)
- ML20112F824 + (05:48:42, 13 December 2024)
- ML20112F823 + (05:48:43, 13 December 2024)
- 05000324/LER-1985-002-02, :on 850215,HPCI Sys Declared Inoperable Following Testing Which Revealed HPCI Pump Discharge.Valve E41-F006 Would Not Open.Caused by Pump Valve Not Functioning within Calibr Tolerances + (05:48:45, 13 December 2024)
- NSD-NRC-96-4738, Forwards Info Required for Status of Dser Open Items in Chapter 2 + (05:48:46, 13 December 2024)
- ML20112F812 + (05:48:48, 13 December 2024)
- 05000368/LER-1985-003, :on 850201,Tech Specs 4.6.1.3.c Surveillance Requirement Not Met.Caused by Inadequate Guidance & Review of Tech Specs During Procedure Writing & Rev Process.Test Procedure Revised + (05:48:50, 13 December 2024)
- ML20112F802 + (05:48:51, 13 December 2024)
- ML20112F801 + (05:48:52, 13 December 2024)
- ML20112F800 + (05:48:53, 13 December 2024)
- ML20112F795 + (05:48:55, 13 December 2024)
- ML20112F792 + (05:48:56, 13 December 2024)
- 05000336/LER-1996-026-01, :on 960503,certain Valves Not Included in Surveillance.Caused by Historical Interpretation of Tech Spec.Informed Operators That Entering N/A for Certain Valves on Valve Lineups Is Unacceptable + (05:48:58, 13 December 2024)
- ML20112F787 + (05:49:00, 13 December 2024)
- ML20112F783 + (05:49:02, 13 December 2024)
- ML20112F780 + (05:49:03, 13 December 2024)
- ML20112F779 + (05:49:04, 13 December 2024)
- ML20112F778 + (05:49:05, 13 December 2024)
- B15702, Submits Addl Info Re Proposed Rev to Tech Specs for Reactor Protective & ESF Actuation Sys Instrumentation + (05:49:06, 13 December 2024)
- ML20112F776 + (05:49:06, 13 December 2024)
- ML20112F774 + (05:49:07, 13 December 2024)
- ML20112F772 + (05:49:08, 13 December 2024)
- ML20112F769 + (05:49:10, 13 December 2024)
- ML20112F768 + (05:49:11, 13 December 2024)
- 05000454/LER-1996-003-09, :on 960507,safety Injection Pump Exceeded Max Flow.Caused by Defective Procedure.Developed Correlation Between Pump Suction Parameters & Flow + (05:49:13, 13 December 2024)
- ML20112F760 + (05:49:15, 13 December 2024)
- SNRC-1124, Informs of Intent to Proceed W/Drilling of Three Wells to Satisfy Requirements of Groundwater Monitoring Program of Environ Protection Plan.Program Will Determine Effect of Fresh Water Consumption on Groundwater Levels & Quality + (05:49:15, 13 December 2024)
- HL-5181, Requests That NRC Grant Encl Requests RR-15 & RR-16,per 10CFR50.55a(g)(6)(i).Requests for Relief Will Be Added to ISI Program Document W/Next Rev + (05:49:17, 13 December 2024)
- 1CAN038507, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (05:49:17, 13 December 2024)
- ML20112F747 + (05:49:18, 13 December 2024)
- ML20112F743 + (05:49:19, 13 December 2024)
- 05000395/LER-1996-005, :on 960517,ESFs Steam Line Isolation Signal Inadvertently Generated.Caused by Cognitive Personnel Error. Technician Verbally Counseled + (05:49:21, 13 December 2024)
- ML20112F731 + (05:49:23, 13 December 2024)
- ML20112F734 + (05:49:23, 13 December 2024)
- ML20112F729 + (05:49:25, 13 December 2024)
- ML20112F728 + (05:49:26, 13 December 2024)
- ML20112F725 + (05:49:27, 13 December 2024)