ML20112F780
| ML20112F780 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/30/1996 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9606100113 | |
| Download: ML20112F780 (1) | |
Text
_
St: tion Support Department
.v PECO NUCLEAR e= c-vc - v Nuclear Group Headquarters A UNir or PECO ENERGY 965 Chesterbrook Boulevard Wayne, PA 19087-5691 May 30,1996 Docket Nos. 50-352 50-353 Ucense Nos. NPF49 NPF-85 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Umerick Generating Station, Units 1 and 2 Technical Specifications Change Requests Implementation Dates Gentlemen:
The purpose of this letter is to notify the NRC of implementation dates associated with recently issued Technical Specifications Change Requests (TSCRs) for Umerick Generating Station.
TSCR #
BRIEF DESCRIPTION IMPLEMENTATION DATE 95-12-0 Alternate actions to al low March 22,1996 continuation of core alterations in the event certain refueling interlocks are Inoperable Increase containment purge March 29,1996 j
95 18-0 operating limits to 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> each 365 days i
Change concentration of May 30,1996 94-02-0 calibration gas required for calibrating hydrogen and oxygen analyzers
)
If you have any questions, please do not hesitate to contact us.
9606100113 960530 I
Very truly yours, PDR ADOCK 05000352 l
P PDR dAvmh.
1000.?4 I
. A. Hunger, Jk Director - Ucensing i
i c0\\
i cc:
T. T. Martin, Administrator, Region 1, USNRC
)
N. S. Perry, USNRC Senior Resident inspector, LGS
}
Tk R. R. Janati, PA Bureau of Radiological Protection l
j