Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-0222, Discusses Review of Reg Guides in FSAR Table 1.8-1 Re Preoperational Testing,Operations,Operational QA, Surveillance & Maint,Per Util .Clarifications to Be Added to FSAR Table 1.8-1 in Future Amend Encl + (05:27:32, 13 December 2024)
- ML20113A272 + (05:27:33, 13 December 2024)
- ML20113A285 + (05:27:33, 13 December 2024)
- ML20113A262 + (05:27:34, 13 December 2024)
- ML20113A237 + (05:27:35, 13 December 2024)
- NLS8500058, Forwards Endorsement 66 to Nelia Policy NF-200 + (05:27:35, 13 December 2024)
- ML20113A234 + (05:27:36, 13 December 2024)
- ML20113A233 + (05:27:39, 13 December 2024)
- RBG-20621, Forwards Suppl to Rev 4 to Physical Security Plan.Suppl Withheld (Ref 10CFR2.790).Affidavit Encl + (05:27:40, 13 December 2024)
- ML20113A209 + (05:27:41, 13 December 2024)
- 05000458/LER-1996-011, :on 960516,personnel Error Resulted in Missed Surveillance & Dry Floor Drain Sump Leakage Detection Monitoring Instrumentation Exceeded TS Allowed Outage Times. Appropriate Disciplinary Actions Taken + (05:27:43, 13 December 2024)
- ML20113A180 + (05:27:44, 13 December 2024)
- ML20113A173 + (05:27:45, 13 December 2024)
- ML20113A177 + (05:27:45, 13 December 2024)
- 05000282/LER-1996-010, :on 960520,determined That AFW Pumps Not Protected Against Runout for All Accident Conditions.Caused by Original Design of Afws Not Including Runout Protection for AFW Pumps.Procedures Revised + (05:27:47, 13 December 2024)
- ML20113A167 + (05:27:49, 13 December 2024)
- ML20113A161 + (05:27:50, 13 December 2024)
- ML20113A164 + (05:27:50, 13 December 2024)
- RBG-43019, Forwards Response to Exercise Weaknesses Noted Insp Rept 50-458/96-07 on 960415-19.Corrective Actions:Results of Exercise Reviewed W/Emergency Response Organization Members & Being Reviewed W/Operations Crews + (05:27:52, 13 December 2024)
- ML20113A160 + (05:27:52, 13 December 2024)
- ML20113A157 + (05:27:53, 13 December 2024)
- ML20113A152 + (05:27:54, 13 December 2024)
- ML20113A149 + (05:27:55, 13 December 2024)
- ML20113A146 + (05:27:56, 13 December 2024)
- BSEP-82-1754, Semiannual Environ & Effluent Release Rept,Jan-June 1982 + (05:27:58, 13 December 2024)
- ML20113A137 + (05:27:59, 13 December 2024)
- ML20113A131 + (05:28:00, 13 December 2024)
- ML20113A135 + (05:28:00, 13 December 2024)
- ML20113A128 + (05:28:01, 13 December 2024)
- 05000373/LER-1985-024-01, :on 850303,reactor Scram Occurred,Resulting from Turbine Control Valve Fast Closure.Caused by Offsite Fault on 345-kv Transmission Line 0101.Lines 0101 & 0104 Inspected + (05:28:03, 13 December 2024)
- ML20113A121 + (05:28:05, 13 December 2024)
- ML20113A115 + (05:28:08, 13 December 2024)
- ML20113A112 + (05:28:10, 13 December 2024)
- DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo + (05:28:11, 13 December 2024)
- ML20113A102 + (05:28:12, 13 December 2024)
- ML20113A095 + (05:28:12, 13 December 2024)
- ML20113A092 + (05:28:13, 13 December 2024)
- ML20113A089 + (05:28:14, 13 December 2024)
- ML20113A086 + (05:28:16, 13 December 2024)
- ML20113A084 + (05:28:17, 13 December 2024)
- ML20113A080 + (05:28:18, 13 December 2024)
- ML20113A078 + (05:28:19, 13 December 2024)
- ML20113A074 + (05:28:20, 13 December 2024)
- ML20113A071 + (05:28:20, 13 December 2024)
- 05000424/LER-1996-006-01, :on 960525,reactor Trip Occurred Due to Blown Fuse in Isolation Valve.Fuse Replaced & Unit Restarted & Returned to Power.Analysis of Failed Fuse Expected to Be Completed by 960628 + (05:28:22, 13 December 2024)
- 05000425/LER-1996-002-02, :on 960528,rod Positions Not Verified for Inoperable Rod Position Deviation Monitor.Caused by Misleading Procedure.Procedure 17010-2 Clarified + (05:28:24, 13 December 2024)
- ML20113A022 + (05:28:26, 13 December 2024)
- TXX-4445, Interim Significant Deficiency Rept SDAR-171 Re Reliance Control Board That Differs from Equipment Qualification Rept.Initially Reported on 850226.Investigation Continuing & Evaluation Completed by 850419 + (05:28:27, 13 December 2024)
- ML20113A020 + (05:28:28, 13 December 2024)
- RBG-20486, Final Deficiency Rept DR-272 Re spring-can Hanger Pins Not Removed During Recirculation Sys Hot Flow Test.Startup & Test Procedure ST-101, Balance-of-Plant Pipe Expansion, Revised + (05:28:28, 13 December 2024)
- ML20113A011 + (05:28:29, 13 December 2024)
- ML20113A001 + (05:28:30, 13 December 2024)