Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113A776 + (05:25:52, 13 December 2024)
- RC-96-0158, Follow-up to Request for Addl Info Re GL 92-08 for Ampacity Derating Issue + (05:25:53, 13 December 2024)
- 05000528/LER-1985-014, :on 850302,cross Trips of Train B balance-of-plant ESF Actuation Sys Occurred.Caused by Dc Backup Power Supply in Train a Being Out of Svc.Procedure Change Notice Developed + (05:25:55, 13 December 2024)
- AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown + (05:25:57, 13 December 2024)
- NSD-NRC-96-4749, Forwards Draft SSAR Section 18.5 AP600 Task Analysis Activities.Section Revised to Provide Resolution to Dser Open Items 18.5.3-1 & 18.5.3-2 + (05:25:58, 13 December 2024)
- NSD-NRC-96-4752, Forwards Westinghouse Responses to Open Items on AP600. Responses to Oits Items 2310 Through 2319 & Oits Items Through Oits 2330 Included Also + (05:25:58, 13 December 2024)
- 05000370/LER-1996-004-02, :on 960524,Emergency Diesel Generator 2A Automatically Started.Caused by Lightning Strike.Personnel Dispatched to Check Alarms & Restarted Tripped Equipment.W/ + (05:26:03, 13 December 2024)
- HL-5189, Forwards Request for Addl Info Re Generic Letter 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves + (05:26:04, 13 December 2024)
- ML20113A712 + (05:26:05, 13 December 2024)
- 05000370/LER-1996-003-02, :on 960522,Unit 2 Reactor Tripped Due to Low Reactor Coolant Sys Flow.Caused by RCP Motor 2B Failure.Nc Pump Motors 2D & 2C Replaced & 2B Inspected,Removed & Sent Offsite for Complete Rewind + (05:26:07, 13 December 2024)
- ML20113A693 + (05:26:08, 13 December 2024)
- L-84-370, Responds to NRC Re Violations Noted in Insp Repts 50-335/84-29 & 50-389/84-35.Corrective Actions:Individuals Involved Instructed to Wear Proper Protective Clothing & to Comply W/All Requirements + (05:26:09, 13 December 2024)
- ML20113A678 + (05:26:10, 13 December 2024)
- ML20113A683 + (05:26:10, 13 December 2024)
- ML20113A677 + (05:26:11, 13 December 2024)
- 2CAN069604, Informs That JW Teter No Longer Has Need to Maintain Operating License & Requests That Individual License Be Withdrawn + (05:26:12, 13 December 2024)
- ML20113A666 + (05:26:13, 13 December 2024)
- ML20113A670 + (05:26:13, 13 December 2024)
- ML20113A665 + (05:26:14, 13 December 2024)
- ML20113A647 + (05:26:15, 13 December 2024)
- BECO-LTR-96-037, Requests Approval to Carry Out Side Stream Testing of Mexel 432 at Pilgrim Site in Effort to Reduce Use of Chlorine to Maintain & Improve Biofouling Control in Seawater Cooling Sys.Technical Info & Matl Safety Data Sheets Attached + (05:26:16, 13 December 2024)
- ML20113A642 + (05:26:16, 13 December 2024)
- 05000374/LER-1984-083-01, :on 841208,primary Containment Vacuum Breaker a Cycled Open & Closed.Caused by Differential Pressure Between Suppression Pool & Drywell.No Corrective Action Needed + (05:26:18, 13 December 2024)
- ML20113A630 + (05:26:19, 13 December 2024)
- 1CAN069607, Monthly Operating Rept for May 1996 for Arkansas Nuclear One Unit 1 + (05:26:20, 13 December 2024)
- BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 + (05:26:21, 13 December 2024)
- 2CAN069605, Monthly Operating Rept for May 1996 for Arkansas Nuclear One Unit 2 + (05:26:22, 13 December 2024)
- ML20113A607 + (05:26:22, 13 December 2024)
- ML20113A602 + (05:26:23, 13 December 2024)
- ML20113A598 + (05:26:27, 13 December 2024)
- 05000316/LER-1984-033-01, :on 841213,obstruction Discovered in Safeguards Ventilation Ductwork.Caused by Large Plastic Bag Positioned Against Turning Vanes.Obstruction Removed.Bldg Tour Procedures Modified + (05:26:28, 13 December 2024)
- ML20113A592 + (05:26:30, 13 December 2024)
- ML20113A585 + (05:26:32, 13 December 2024)
- ML20113A581 + (05:26:33, 13 December 2024)
- ML20113A579 + (05:26:34, 13 December 2024)
- ML20113A578 + (05:26:35, 13 December 2024)
- ML20113A576 + (05:26:36, 13 December 2024)
- 05000247/LER-1984-023, :on 841207,discovered Auxiliary Feedwater Regulating Valves Might Not Permit Min Flow in Throttled Position.Valves Set to Limit Initial Flow to +50 Gpm Per Steam Generator + (05:26:38, 13 December 2024)
- ML20113A567 + (05:26:39, 13 December 2024)
- 05000315/LER-1984-034, :on 841212,instructions for Containment Pressure Relief Procedures Discovered W/Step That Could Result in Exceeding Release Limits of Tech Spec 3.11.2.1. Cause Not Stated.Step Replaced + (05:26:41, 13 December 2024)
- BECO-LTR-96-057, Forwards Response to NRC 40500 Team Insp Rept 50-293/96-80 Conducted on 960122-0209 + (05:26:42, 13 December 2024)
- ML20113A548 + (05:26:42, 13 December 2024)
- 05000339/LER-1984-008, :on 841016,complete Loss of RHR Capability Occurred When Both RHR Pumps Inoperable Due to Introduction of Air Into RHR Sys.Caused by Isolation Valve Clogging During Drain Down + (05:26:44, 13 December 2024)
- ML20113A544 + (05:26:45, 13 December 2024)
- ML20113A538 + (05:26:46, 13 December 2024)
- ML20113A528 + (05:26:47, 13 December 2024)
- ML20113A524 + (05:26:47, 13 December 2024)
- ML20113A517 + (05:26:51, 13 December 2024)
- ML20113A516 + (05:26:52, 13 December 2024)
- ML20113A513 + (05:26:53, 13 December 2024)
- ML20113A508 + (05:26:53, 13 December 2024)
- ML20113A502 + (05:26:54, 13 December 2024)