- ML20113B346 + (05:24:26, 13 December 2024)
- ML20113B358 + (05:24:26, 13 December 2024)
- ML20113B341 + (05:24:28, 13 December 2024)
- 05000374/LER-1984-084, :on 841214,setpoint for Trip of 2E31-N602B Module Actuated Outside Allowable Tolerance.Cause Unknown. Spare Module Calibr & Installed.Output of Module Stable During Bench Testing + (05:24:29, 13 December 2024)
- ML20113B337 + (05:24:30, 13 December 2024)
- ML20113B335 + (05:24:31, 13 December 2024)
- ML20113B330 + (05:24:31, 13 December 2024)
- ML20113B324 + (05:24:32, 13 December 2024)
- 05000454/LER-1984-030-03, :on 841218,instrument Bus 111 Deenergized & Boron Dilution on Protection Sys Actuated Due to Deenergization of Nuclear Instrumentation Channel I.Caused by Shorted Capacitor in Control Circuitry + (05:24:34, 13 December 2024)
- 05000387/LER-1984-049, :on 841214,suppression Chamber Purge Initiated W/O Required Sampling & Analyses.Caused by Personnel Error. Procedure Rev Initiated & Personnel Counseled + (05:24:36, 13 December 2024)
- 05000454/LER-1984-034-03, :on 841227,discrepancy in Number of Sources Received on 841221 Discovered.Caused by Rad/Chem Technician Comparing Package Contents to DOT Sticker Instead of Packing List.Procedures Being Revised + (05:24:38, 13 December 2024)
- ML20113B307 + (05:24:39, 13 December 2024)
- 05000362/LER-1984-043-01, :on 841128,auxiliary Feedwater Sys Discharge Pipe Venting Missed in Nov & Dec 1984.Caused by Error in Incorporating Procedure Change.Requirement Added to Appropriate Procedures + (05:24:40, 13 December 2024)
- ML20113B290 + (05:24:41, 13 December 2024)
- ML20113B289 + (05:24:42, 13 December 2024)
- ML20113B286 + (05:24:43, 13 December 2024)
- ML20113B283 + (05:24:43, 13 December 2024)
- ML20113B278 + (05:24:44, 13 December 2024)
- ML20113B257 + (05:24:45, 13 December 2024)
- ML20113B276 + (05:24:45, 13 December 2024)
- L-96-159, Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)) + (05:24:46, 13 December 2024)
- NSD-NRC-96-4751, Forwards Three Copies of Westinghouse Responses to NRC RAI on AP600 Topics + (05:24:47, 13 December 2024)
- RC-96-0157, Part 21 Rept Re Nozzle Weld Defects in Chemical & Vol Control Sys Connections at RCP Seal Injection Nozzles & Ccws Connections at RCP Thermal Barrier Heat Exchanger Inlet & Outlet Nozzles Supplied by W + (05:24:47, 13 December 2024)
- ML20113B203 + (05:24:48, 13 December 2024)
- W3P85-1205, Personnel Monitoring Rept 1984 + (05:24:49, 13 December 2024)
- ML20113B197 + (05:24:50, 13 December 2024)
- ML20113B195 + (05:24:51, 13 December 2024)
- ML20113B191 + (05:24:51, 13 December 2024)
- ML20113B185 + (05:24:52, 13 December 2024)
- ML20113B178 + (05:24:53, 13 December 2024)
- 05000277/LER-1995-006, :on 951022,offsite Electrical Power Source Lost.Caused by Momentary Deenergization of Several Electrical Distribution Panels.Isolation Logics Reset & Affected Sys Restored + (05:24:54, 13 December 2024)
- 05000341/LER-1996-009, :on 960526,ESF Actuation Occurred.Caused by Plant Operator Attempting to Replace Burned Out Indicating Bulb,Cracked Socket Separated Completely,Resulting in Short Circuit.Lamp Socket Wires Taped + (05:24:56, 13 December 2024)
- NRC-96-0056, Discusses SALP 15 Response & Comments Made by NRC During SALP Meeting on 960521 + (05:24:58, 13 December 2024)
- ML20113B129 + (05:24:58, 13 December 2024)
- ML20113B128 + (05:24:59, 13 December 2024)
- U-602595, Forwards Response to Violations Noted in NRC Insp Rept 50-461/96-03.Corrective Actions:Injector Setting Jack Removed from Twelve Cylinder Diesel Engine & Governor Restored to Normal Configuration + (05:25:00, 13 December 2024)
- ML20113B110 + (05:25:00, 13 December 2024)
- 3F0696-05, Provides Response to Violation Noted in Insp Rept 50-302/96-03.Corrective Actions:Ltr Addressed to All Radiation Workers Reviewing Event Issued + (05:25:01, 13 December 2024)
- ML20113B095 + (05:25:02, 13 December 2024)
- ML20113B089 + (05:25:03, 13 December 2024)
- BSEP-96-0225, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (05:25:04, 13 December 2024)
- L-84-353, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-25 & 50-251/84-26.Corrective Actions:New Training Video Tape Prepared to Address Requirements of Administrative Procedure 0306 + (05:25:05, 13 December 2024)
- 05000293/LER-1996-007, :on 960519,LCO for Operation for Switchyard Battery Exceeded Tech Spec.Caused by Personnel Error.Revised Procedure 8.9.8.4 & Revised Master Surveillance Tracking Program Nodes + (05:25:07, 13 December 2024)
- 05000313/LER-1996-005-02, :on 960519,automatic Reactor Trip on High RCS Pressure Occurred.Caused by Component Failure in a MFW Pump Control Sys.Failed Speed Sensor Replaced + (05:25:10, 13 December 2024)
- 05000318/LER-1996-002-01, :on 960522,fire Watch Missed.Caused by Personnel Error.Counseled Personnel Re Event + (05:25:12, 13 December 2024)
- 05000333/LER-1996-007-01, :on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model + (05:25:14, 13 December 2024)
- 0CAN069602, Forwards Response to Violations Noted in Insp Repts 50-313/96-02 & 50-368/96-02.Corrective Actions:Valve Chain Reconfigured & Locked to Preclude Valve Operation + (05:25:15, 13 December 2024)
- ML20113B053 + (05:25:16, 13 December 2024)
- 2CAN069603, 1995 ANO Unit 2 10CFR50.59 Rept, for Period Ending 951120 + (05:25:18, 13 December 2024)
- ML20113B018 + (05:25:19, 13 December 2024)
- ML20113A989 + (05:25:20, 13 December 2024)
- ML20113A988 + (05:25:21, 13 December 2024)