ML20113B018
| ML20113B018 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/20/1996 |
| From: | Mueller J NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20113B021 | List: |
| References | |
| NLS960004, TAC-M92923, NUDOCS 9606260142 | |
| Download: ML20113B018 (4) | |
Text
- _ _ _ __
COOPER NUCLEAR STATION p-P.O. BOX 98. BROWNVLLE. NEBRASKA 68321 Nebraska Public Power District
" G L' %""
NLS960004 3une '20,1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Amendment 4.1 to the Second Ten-year Interval Inservice Inspection Program Cooper Nuclear Station, NRC Docket No. 50-298, License No. DPR-46
References:
1.
Letter (No. NLS950139) to USNRC Document Control Desk from J. IL Mueller (NPPD) dated July 14,1995: Second Interval Inservice Inspection Program 2.
Letter to G. R. Horn (NPPD) from W. D. Beckner dated December 13, 1995: Cooper Nuclear Station - Inservice Inspection Relief Requests RI-01 through RI-19 (TAC No. M92923)
Gentlemen:
In accordance with 10 CFR 50.55a(g)(5)(iv), the Nebraska Public Power District (District) hereby submits Amendment 4.1 to the Cooper Nuclear Station (CNS) Second Ten-year Interval Inservice Inspection (ISI) program submitted July 14,1995 (Reference 1). Please update your program document with the attached information.
Amendment 4.1 of the Second Ten-Year Interval ISI program addresses minor editorial changes, adjusts the weld examination lists, incorporates NRC comments, revises Relief Requwt RI-06 (approved per Reference 2), and adds four new relief requests. The need for these relief requests was identified via the examinations performed during RFO-16, the last refueling outage in the second interval. Approval of the revision to RI-06, and the four new relief requests is requested by December 31,1996.
If you have any questions regarding this submittal, please cali.
Sincerely, 9606260142 960620 PDR ADOCK 05000298 Q
//
t John IL Mueller Site Manager g'
/dnm Attachments f,l[ 'lll [.l_f&S}fg['G l* l("[] [l@ { ?,f-&&QQQ
m m=m
mm
mmmmmm mmmmmm===
l NLS960004 June 20,1996 - l Page 2 of 2 cc: Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC - Cooper Nuclear Station Regional Administrator USNRC - Region IV NPG Distribution i l i l r l 1 o 1 i I i s. i I
I l LIST OF NRC COMMITMENTS l ATTACHMENT 3 l Correspondence No: NLS960004 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's l Information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments. l COMMITTED DATE l COMMITMENT OR OUTAGE None N/A l i i I l PROCEDURE NUMBER 0.42 l REVISION NUMBER 1.1 l PAGE 9 OF 11 l l t
\\ NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION SECOND TEN YEAR INTERVAL INSERVICE INSPECTION PROGRAM FOR ASME CLASS 1, 2 AND 3 COMPONENTS REVISION 4.1 l -}}