Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114A977 + (05:00:52, 13 December 2024)
- ML20114A974 + (05:00:53, 13 December 2024)
- ML20114A971 + (05:00:55, 13 December 2024)
- ML20114A970 + (05:00:55, 13 December 2024)
- ML20114A965 + (05:00:56, 13 December 2024)
- 3F0892-08, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-14.Corrective Actions:Procedure ISI-119 Revised. Util Will Also Perform Technical Review of Vendor ISI Procedures Prior to Future Use + (05:00:57, 13 December 2024)
- ML20114A962 + (05:00:57, 13 December 2024)
- ML20114A955 + (05:01:01, 13 December 2024)
- U-602028, Semiannual Radioactive Effluent Release Rept,Jan-June 1992 Clinton Power Station + (05:01:02, 13 December 2024)
- U-602025, Forwards Replacement Pages for TS 3/4.3.7.1, Radiation Monitoring Instrumentation & 3/4.3.9, Plant Sys Actuation Instrumentation Contained in 910920 Amend Request,As Result of Questions/Comments from NRC During Review + (05:01:03, 13 December 2024)
- ML20114A948 + (05:01:03, 13 December 2024)
- 05000382/LER-1992-007-01, :on 920717,liquid Radiation Monitor High Alarm Setpoint Set Incorrectly Due to Personnel Error.Liquid Radwaste Release Permits Calculated Manually Now Require Supervisory Oversight Before Release + (05:01:05, 13 December 2024)
- ML20114A943 + (05:01:07, 13 December 2024)
- ML20114A939 + (05:01:08, 13 December 2024)
- ML20114A933 + (05:01:09, 13 December 2024)
- 05000293/LER-1992-009, :on 920717,during Testing,Actuation Occurred Resulted in Closing of Inboard RWCU Group 6 Isolation Valve. Caused by Temp Switch Not Thermally Stabilized.Temp Switch Will Be Trended Using Existing Procedures + (05:01:11, 13 December 2024)
- ML20114A924 + (05:01:12, 13 December 2024)
- ML20114A922 + (05:01:13, 13 December 2024)
- 05000352/LER-1984-036, :on 841217,reactor Water Cleanup Sys Inboard Isolation Valve Closed to Isolation Position.Caused by Receipt of Signal from High Temp Differential Temp Logic. Isolation Signal Cleared + (05:01:15, 13 December 2024)
- ML20114A913 + (05:01:16, 13 December 2024)
- 05000352/LER-1984-026, :on 841216,reactor Water Cleanup Sys (Rwcs) Outboard Isolation Valve Closed to Isolation Position.Caused by Receipt of Signal from High Differential Temp Logic Circuit.Isolation Signal Cleared & Rwcs Returned to Svc + (05:01:17, 13 December 2024)
- ML20114A911 + (05:01:19, 13 December 2024)
- ML20114A903 + (05:01:20, 13 December 2024)
- ML20114A901 + (05:01:21, 13 December 2024)
- 05000321/LER-1984-025-01, :on 841215,linear through-wall Crack Discovered in Weld 1T48-2CPI-18-P1D-6.Cause Under Investigation.Crack Ground Out.Weld Repaired & Satisfactorily Inspected.W/ + (05:01:23, 13 December 2024)
- 05000346/LER-1984-022, :on 841217,control Room Emergency Ventilation Sys Makeup Flow of Outside Air Exceeded Test Limits on Trains.Caused by Personnel Error.Manual Modulating Dampers Adjusted + (05:01:25, 13 December 2024)
- ML20114A891 + (05:01:26, 13 December 2024)
- ML20114A884 + (05:01:26, 13 December 2024)
- ML20114A880 + (05:01:27, 13 December 2024)
- ST-HL-AE-4178, Application for Amends to Licenses NPF-76 & NPF-80,changing Wording in TS 3.6.3 Action Statement to Require That at Least One Isolation Barrier Instead of One Isolation Valve Be Maintained Operable + (05:01:28, 13 December 2024)
- ML20114A861 + (05:01:31, 13 December 2024)
- ML20114A869 + (05:01:31, 13 December 2024)
- ML20114A851 + (05:01:32, 13 December 2024)
- ML20114A847 + (05:01:33, 13 December 2024)
- ML20114A842 + (05:01:33, 13 December 2024)
- ML20114A840 + (05:01:34, 13 December 2024)
- ML20114A841 + (05:01:34, 13 December 2024)
- ML20114A832 + (05:01:35, 13 December 2024)
- ML20114A826 + (05:01:36, 13 December 2024)
- ML20114A829 + (05:01:36, 13 December 2024)
- 1CAN128405, Requests Waiver on Completion of Annual Simulator Requalification Training of Licensed Operators for 1984-85 Requalification Training Yr.Onsite Simulator Will Be Operational During Third Quarter 1985 + (05:01:37, 13 December 2024)
- TXX-4392, Forwards Summary Description of balance-of-plant Mechanical Equipment Qualification Program.No Corrective Action Necessary as Result of Environ Qualification Study for safety-related Equipment in Potentially Harsh Environs + (05:01:38, 13 December 2024)
- ML20114A809 + (05:01:39, 13 December 2024)
- 05000423/LER-1992-017, :on 920717,determined That One Train of Pressurizer Steam Space Vent Path Was Inoperable & Action Statement Not Performed.Caused by Personnel Error.Changes to TS Will Be Submitted to Clarify Actions + (05:01:40, 13 December 2024)
- ML20114A803 + (05:01:41, 13 December 2024)
- ML20114A800 + (05:01:43, 13 December 2024)
- ML20114A802 + (05:01:43, 13 December 2024)
- ML20114A799 + (05:01:44, 13 December 2024)
- 05000277/LER-1992-011-01, :on 920625,review of NRC Bulletin 92-001 Re Failure of Thermo-Lag 330 Fire Barrier Sys Completed & Fire Barriers Delineated in Bulletin Declared Inoperable.Caused by Design Deficiencies.Fire Watch Established + (05:01:46, 13 December 2024)
- ML20114A796 + (05:01:47, 13 December 2024)
- ML20114A795 + (05:01:47, 13 December 2024)
- ML20114A791 + (05:01:48, 13 December 2024)