ML20114A880
| ML20114A880 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/18/1992 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20114A879 | List: |
| References | |
| NUDOCS 9208240053 | |
| Download: ML20114A880 (2) | |
Text
.... -.... _., _ _ _. _ _.. _. _. _ _ _
1 c:. s 1
i h
t i
?
i t
+
ATTACllMENT 2 PROPOSED ClihNGE TO TECHNICAL SPECIFICATION 3.6,3 P
t 6
1 E
.?'
TSC\\92 209.001 9208240053 920018 PDR ADOCK 05000498 P
PDR 9
.r.9-1
-v,.-ww-
-e-w.
y-
,w,,y
...m,-w~,
-ry,
+ - -,, -
,,,,,,-,,..g,mw,
..-e
,-+vy,,,
g
.m,--
,*,w4,,,m..,..,-
.--w.-+ ivrer+-w.
As isowb wre: r. mogei4kses c ciosns k,n G. e.. 64
[(bevy Crh 57 penchhd or 6ctub w,tvt.
an CONTAINHENT SYSTEMS
~
~
3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3 The containment isolation valves shall be OPERABLE with isolation times less than or equal to the required isolation times.
APPtICABILITY: HODES 1, 2, 3, and 4.
ACTION:
With one or more of the isolation valve (s) inoperable, maintain at least one isolationlveh+ 0PERABLE in each effected penetration that is open and:
W,ci e '
i Restore the inoperable valve (s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, a.
or b.
Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation positier.,
or Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least c.
one closed manual valve or blind flange, or d.
Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, i
SURVEILLANCE REQUInEMENTS 4.6.3.1
the valve to service af ter maintenance, repair or replacement work is per on the valve or its associated actuator, control or power circuit by perform-ance of a cycling test, and verification of isolation time.
4.6.3.2 Each isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:
Verifying that on a Phase "A" Isolation test signal, each Phase "A" a.
isolation valve actuates to its isolation position; Verifying that on a Containment Ventilation Isolation test signal, b.
each purge and exhaust valve actuates to its isolation position; and Verifying that on a Phase "B" Isolation test signal, each Phase "B" c.
isolation valve, actuates to its isolation p W tion, Verifying that on a Phase "A" Isolation test signal, coincident with d.
a low charging header pressure signal, that each seal injection valve actuates to its isolation position.
4.6.3.3 The isolation time of each power-operated or automatic valve shall be detemined to be wit *in its limit when tested pursuant to Specification 4.0.5.
b SOUTH TEXAS - UNITS 1 & 2 3/4 6-19 Unit 1 - Amendment No. 4 30 Unit 2 - Amendment No. 21 i
L
-