Proposed TS 3.6.3 Re Operability of Containment Isolation Valves
ML20114A880
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/18/1992
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20114A879 List:
References
NUDOCS 9208240053
Download: ML20114A880 (2)


Text

. . . . - . ... _ . , _ _ _ . _ _ . . _ . _ . _ _ _ _ __. . . . _ _ _ _ . . .--_ _-..._ -_ . _ _ . _. - _ _ . . _ _ _ . - . . ._

... 1 c: . s .

1 i

h t

i

?

i t

+

ATTACllMENT 2 .

PROPOSED ClihNGE TO TECHNICAL SPECIFICATION 3.6,3 P

t 6

1 E

.?'

TSC\92 209.001 9208240053 920018 PDR ADOCK 05000498 P - -

PDR ,

.*- 9 .r.9-1 -v,.-ww- -e-w. , y- ,w,,y ...m,-w~, -ry, + - - , , - ,,,,,,-,,..g,mw, -

,-+vy,,, , - - .,.- ,*,w4,,,m..,..,-

As isowb wre: r. mogei4kses c ciosns k,n G. e. . 64

. [(bevy Crh 57 penchhd or an 6ctub w,tvt .

~

CONTAINHENT SYSTEMS ~

3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3 The containment isolation valves shall be OPERABLE with isolation times less than or equal to the required isolation times.

APPtICABILITY: HODES 1, 2, 3, and 4.

ACTION:

With one or more of the isolation valve (s) inoperable, maintain at least one isolationlveh+ 0PERABLE in each effected penetration that is open and:

W ,ci e '

i a.

Restore the inoperable valve (s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or

. b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one or deactivated automatic valve secured in the isolation positier.,

, c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange, or d.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, i

SURVEILLANCE REQUInEMENTS 4.6.3.1

the valve to service af ter maintenance, repair or replacement work is per on the valve or its associated actuator, control or power circuit by perform-ance of a cycling test, and verification of isolation time.

4.6.3.2 Each isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:

a. Verifying that on a Phase "A" Isolation test signal, each Phase "A"

isolation valve actuates to its isolation position; b.

Verifying that on a Containment Ventilation Isolation test signal, each purge and exhaust valve actuates to its isolation position; and

c. Verifying that on a Phase "B" Isolation test signal, each Phase "B"

isolation valve, actuates to its isolation p W tion,

d. Verifying that on a Phase "A" Isolation test signal, coincident with a low charging header pressure signal, that each seal injection valve actuates to its isolation position.

4.6.3.3 The isolation time of each power-operated or automatic valve shall be detemined to be wit *in its limit when tested pursuant to Specification 4.0.5.

b SOUTH TEXAS - UNITS 1 & 2 3/4 6-19 Unit 1 - Amendment No. 4 30 Unit 2 - Amendment No. 21 i L . .. .

- -