Special Rept 92-04:on 920724,fire Diesel Pump 2 Removed from Svc to Replace Battery Cables & Solenoid Valve.Correct 24 Volt Dc Coil Obtained from Mfg & Pump Returned to Svc on 920806
ML20114A970
Person / Time
Site: Oyster Creek
Issue date: 08/17/1992
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
92-04, 92-4, C321-92-2239, NUDOCS 9208240196
Download: ML20114A970 (2)


Text

. - . - . _ . . . . . - - _ _ . _ . _ . - - - . . . . . - . .. _ . . - - ..

s o

GPU Nuclear Corporation G -

Nuclear = t r 38" Forked River. New Jersey 08731-0388 609 971-4000 Wr ter's D1roct D.at Number.

August 17, 1992 C321-92-2239 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Oyster Cr ek Nuclear Generating Station Docket No. 50-219 Special Report No. 92-04 Enclosed is Special Report No. 92-03 which is submitted in accordance with technical specification 3.12.B.2.

If there are any questions, please call Mr. Michael Heller, Licensing Engineer, at (609) 971-4680, ncerely, f _

J. 3arton ce President and Cirector Oyster Creek Enclosure cc: -NRC-Region 1 Administrator NRC-Resident Inspector Oyster Creek NRC Project Manager i

i 9200240196 920817 PDR 49UUOU-ADOCK 03000219

/'

((fr 3 I

GPU Nuclear Corporatton is a subsdary of Genera! Pubhc Utihtees Corporation p/

e Oyster Creek Nuclear Generatina Station

. Special Report 92 04 Report Date: -August 17, 1992 Qgcurrence Date: July 24, 1992 Ident :fication of Occatrrence:

Fire diesel pump #2 was out of service for_ more than 7 days. This condition requires a special report per technical specification 3.12.B.2.

Egscription of Occurrence: l On July 24.--1992, fire diesel pump #2 was removed from service to replace battery cables that were cracked and deteriorated and a cooling wate solenoid valve (V-9-62). During replacement of V 9-62, the adjacent threaded piping was found to be corroded and also required replacement. In addition, the available scienoid valve did not have the correct voltage rating. The correct 24 volt DC coil was obtained from the manufacturer and the pump was returned to service on August 6, 1992. During-this period, fin e diesel pump #1 and the redundant fire pump were operable.