Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JAFP-92-0782, Special Rept:On 921002,insp of Fire Doors,Using Revised Surveillance Test Procedure Initiated & Fire Barrier Doors Not Restored to Operable Status within 7 Days.As of 921109, 77 Doors Remained Nonfunctional.Fire Watch Posted + (03:22:39, 13 December 2024)
- BSEP-96-0300, Responds to RAI Re TS to Allow Uprate of Units to 105% of Rated Thermal Power + (03:22:40, 13 December 2024)
- ML20116K077 + (03:22:41, 13 December 2024)
- 05000443/LER-1996-005, :on 960715,determined Surveillance Interval for SI-V53 Had Been Exceeded.Caused by Personnel Error.Procedure Revised to Require Independent Confirmation That Surveillance Frequency Has Been Changed + (03:22:42, 13 December 2024)
- ML20116K033 + (03:22:43, 13 December 2024)
- ML20116K032 + (03:22:44, 13 December 2024)
- ML20116K010 + (03:22:45, 13 December 2024)
- ML20116K014 + (03:22:45, 13 December 2024)
- PY-CEI-NRR-1573, Monthly Operating Rept for Oct 1992 for Perry Nuclear Power Plant + (03:22:46, 13 December 2024)
- ML20116K001 + (03:22:47, 13 December 2024)
- ML20116K006 + (03:22:47, 13 December 2024)
- ML20116J993 + (03:22:48, 13 December 2024)
- ML20116J988 + (03:22:50, 13 December 2024)
- ML20116J984 + (03:22:51, 13 December 2024)
- ML20116J956 + (03:22:51, 13 December 2024)
- ML20116J952 + (03:22:52, 13 December 2024)
- ML20116J947 + (03:22:53, 13 December 2024)
- ML20116J945 + (03:22:54, 13 December 2024)
- ML20116J936 + (03:22:54, 13 December 2024)
- ML20116J935 + (03:22:55, 13 December 2024)
- ML20116J930 + (03:22:56, 13 December 2024)
- 05000302/LER-1996-017, :on 960531,reactor Tripped on High Reactor Coolant Pressure During Turbine Testing.Caused by Debris in Manual Isolation Valve.Post Trip Analysis Performed & Request for Engineering Assistance Initiated + (03:22:59, 13 December 2024)
- ML20116J912 + (03:23:11, 13 December 2024)
- ML20116J910 + (03:23:11, 13 December 2024)
- ML20116J908 + (03:23:15, 13 December 2024)
- ML20116J903 + (03:23:16, 13 December 2024)
- ML20116J900 + (03:23:17, 13 December 2024)
- ML20116J892 + (03:23:18, 13 December 2024)
- ML20116J896 + (03:23:18, 13 December 2024)
- ML20116J886 + (03:23:20, 13 December 2024)
- ML20116J891 + (03:23:20, 13 December 2024)
- ML20116J884 + (03:23:23, 13 December 2024)
- ML20116J882 + (03:23:24, 13 December 2024)
- ML20116J879 + (03:23:25, 13 December 2024)
- ML20116J878 + (03:23:26, 13 December 2024)
- ML20116J874 + (03:23:26, 13 December 2024)
- ML20116J865 + (03:23:27, 13 December 2024)
- ML20116J862 + (03:23:32, 13 December 2024)
- ML20116J843 + (03:23:35, 13 December 2024)
- ML20116J855 + (03:23:35, 13 December 2024)
- 05000301/LER-1992-003, :on 920918,Train a of Unit 2 Containment Spray Sys Rendered Inoperable.Caused by Spray Pump Impeller Suction Blocked by Foam Rubber Plug.Containment Spray Sys & Safety Injection Sys Remained Operable + (03:23:37, 13 December 2024)
- TXX-9248, Proposed Tech Specs,Reflecting Removal of 40 Month SR to Disassemble & Surface Inspect Low Pressure Turbine Stop & Control Valves + (03:23:39, 13 December 2024)
- ML20116J833 + (03:23:40, 13 December 2024)
- ML20116J830 + (03:23:41, 13 December 2024)
- ML20116J825 + (03:23:41, 13 December 2024)
- ML20116J823 + (03:23:45, 13 December 2024)
- ML20116J815 + (03:23:47, 13 December 2024)
- ML20116J819 + (03:23:47, 13 December 2024)
- ML20116J812 + (03:23:48, 13 December 2024)
- ML20116J810 + (03:23:49, 13 December 2024)
- ML20116J805 + (03:23:50, 13 December 2024)