ML20116J984
| ML20116J984 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/09/1992 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19310D436 | List: |
| References | |
| CON-NRC-92-126 VPNPD-92-344, NUDOCS 9211160488 | |
| Download: ML20116J984 (1) | |
Text
. _..
' Electnc
^ POWER COMPANY.
?
- 231 W MacNgart Po Box 2046 M*uoukee, WI 53201 (414)221 2345 VPNPD-92-344-NRC-92-126 November 9, 1992
~!
Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20SS5 Gentlemen DOCKET NOS. 50-266 AND S0-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are copies ~of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.
The procedures consist of changes which should be filed in'your-copies of the subject document in accordance with the attached instructions.
Please note that the procedures.containing names and telephone-numbers are stamped "NRC~ONLY, NOT.FOR-PUBLIC DISCLOSURE."_: A copy.
of the effected-procedures, with names andinumbers deleted,-are provided and are stamped " NAMES AND TELEPHONE NUMBERS DELETED" to<
assure confidentiality andl facilitate _your'; distribution to-the public documents rooms.
Sincerely, s
/
W
. Bob Link Vice President Nuclear Power
-jg Enclosures cc:
NRC Resident Inspector (w/o/e)
/
-Incident Response-_ Center, Region III (2)
[,
l 9211160488 921109-
~
MI
h?]
DR ADDCK 0500 6
vg 7
AsuA<Wh onlisvahEwgCorpvadon ;
l[
./ fr 7
e