Il I
Ikike trurt Corryway Ikt tric O nter
. /*O tha lIRM Charlotte. N C 28201.!006 0 'KEPOWER November 13, 1992 U.S. Nuclear RecJulatory Otzumission ATI13(TICH: W e nt Control Desk Washirgton, D.C.
20555 RE: McGaire tAaclear Station Docket No. 50-369 and 50-370 File GS-801.01
Dear sir:
Pleano fird attached information concerninty the perforunnae and operatirq status of the McGuire Nucice Station for the month of October,1992.
Very truly yo'tra, E. O. McCraw, Manager Operations, Performance (< Autcnation Attachments D0ti/ raw m: Stewart D. Ibncter American Nuclear Insurers Regional Mministrator/Rogian II c/o Dottio Shermn, ANI Library U.S. Nuclear Rcqulatory Oamission Tte Center, Suite 300S 101 Marietta Struct, NW, Suite 2900 29 South Main Screet Atlanta, GA 30323 West Hartfod, CF 06107-2445 INIO Rooords Center Ms. Vickie White Suite 1500 Nuclear Assurance Cbrporation 1100 Circle 75 Parkway 6251 Crooked Crn..: Road Atlanta, GA 30323 Norcrocs, GA 30092 T. A. Reed, Project Manager P. K. VanDoorn OffJce of Nuclear Reactor Regulation Cedor Resident Inspector U.S. Nuclear Regulatory Camission McGuirn N. lear Station Washirgton,'D.C. 20555
<onnnn 9211160466 921031 PDR. ADOCK 05000369 i
R PDR
,3 e f
..-nn i,
US }&C - M$uire llovember 13, 1992 Pago 2 bc!
D. R. Bradshaw (DC07A)
K. S. Carndy (EC0811)
B. T. Paulkenberry (EC07C)
R. O. Sharpe (M4S)
D. E. Dortz (EC08G)
T. E. Mooney (WC26C)
B. J. Horsley - Catawba Cbntracts (EC03U)
N. A. Rutherford (EC07I)
R. C.11orcutt _ (IO01A)
R. A. Willians (EC07A) (3)
J. C. Winbich (DC07B)
E. C. Fisher (ME)
B. W. Walsh (PB02L)
J. Roth (Mt4S)
S. D. Galloway (01S)
C. D. Denton (IV05E)
R. L. Gill (WC26A) (File) i
00 ERA 11W6DATAREf0RT-00Cill NO
$0-369 DATE Noventer 13. 1992
'0FERAllWB STATUS C0MPLETEDtY F.A.Wilitle_L,_
TELEPHONE 704 30! 5346
- 1. Unit Nase: McGuire 1
- 2. Repertleg Feriod: October 1, 1992-Octster 31,1992
- 3. Licensed Thereal Power (MWt):
3411
- 4. Nueplate Rating (Bross MWe):
1305t Notes #Naeeplate Rating 5.DenignElectricalRating(NetMWe):
1100 (BrossMWe)calculatedas 6.MariousDerendableCapacity(6tessMWe):
!!71 1450.000MVA:.90 power
- 7. Marious Dependable Capacity (Net MWe):
ll29 facter per Page ille.
- 9. If Changes Occur in Capacity Ratings litees Nuster 3 Through 7) Since Last NURE6-0020.
Report.GiveRenorts:
- 9. Power Level To Which Rntricted,. !f Any s 'st fuel
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cueulative-
!!. Hours In Reporting Period 745.0 7320.0.
95712.0
- 12. Nueber Of Hours Reactor Was Critical 745.0 -
5398.7 67392.2
- 13. R uctor Reserve Shutdown Hours
--0--
--0--
-*0-
- 14. Hours Generator On-Line 745.0 5377.6 66658.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Generated (MWH) 2514463 178105?9 204796240
- 17. Gross Electrical Energy Generated (MWH)-
862909 6093328 70453153 10.-NetElectricalEnergyGenerated1MWW) 829686 5827546 (72585?9-l.
19.UnitServiceFactor 100.0-73.5-69.6
- 20. Unit Availability Factor 100.0-73.5
-69.6
- 21. Unit Capacity Factor (Using MDC Net) 98.6
.70.5 61.0 :
- 22. Unit ttpacity Factor (Using DER Neti-94.4 67.5-
'59.6
- 23. Unit Forced Outage Rate 0,0 -
26.5 13.B L
- 26. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration ef Each):
1 25, If Shut-Down At End Of Report Period. Estisated Date of Startupt 1:
- 26. Units In Test Statut.:(Prior to Commercial' Operation):
Forecast Achieved' INIf1ALCRITICAllif L
INITIAL ELECTRICITY-
. COMERCIAL OFERATION l
l.
I
[
o l
,?
05ERATi% DATA REFORT w
DOErET NO
$0-369 UNil _, "'% ire 1 DATE Nove >r 13,1992 y
,dnPLETED BY F.A. Willians 6 -~
TELEFHONE 704-382-531._
MONir _.
tQ
... d!!.Y FCWER LEVEL pq AVERASE DAILY POWER LEVEL
-het)
(MWe-het) 1
,119 17 1122 e
tie 0 IB 1121 3
1120 19 1122 4
111y 20 1R4 I
5 11 7 21 1127.__
4 6
1121 22 1125 7
7 1122 23 BBE 8
1120 E4 1087 j
^
9 11ja 25 1125 10 121 d
1126 11 1121 27 1125 s
12
!!20 28 1124 a.*
se
%)
13 1123 29 1124 14 1123 3C 1125 15 1124 31 1123 16 1524 i
l y, p g
a y
h
~ '
,9 UNIS SHUTDOWNS AND POWER REDUCL e6 DOCKET NO.
50-369 UNIT NAME Mcuulut, 1 DATE 11/10/92 REPORT MONTH -
October 1992 COMPLETED BY r4
- c. s1MMuus TELEPHONE i/041-J82-3z63 l
(4)
(5)
(1) f2) g, J
E HOD j
7.
A OF LICENSE CAUSE AND CORRECTIVE N
Y S
SHUT EVENT SYS-O P
DURATION O
DOWN REPORT TEN COMPONENT ACTION TO i
DATE E
HOURS N
R/X NO.
COLD CODE PREVENT RECURRENCE SB PUMPXX REAC"OR BUILDING SPRAY PUMP SLAVE 1
A 14-P 92-10-23 F
RELAY REPAIR RC l FUELXX QUADRANT POWER TILT RATIO PROBLEMS H
15-P 92-10-23 F
IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION B
16-P 92-10-24 F
(1)
(2)
(3)
(4)
Method:
Exhibit G - Instructions 1-Manual for Prepar,ttion of, Data F Forced Reason
- A-Equipment FailureB-Maintenance or test (Explain)
Sneets 'For Licensee S Scheduled Enty Report (NUEG-0161) )
2-Manual Scram Eyene (LER 3-Automatic Scram l
C-Refueling 4-Other (Explain)
File D-Regulato n Restriction E-Operator Training & License Examination (5)
F-Administ" tive Exhibit I - Same Source G-Operator Jrrgr (Explain) i H-Other (Explain) l l
l
DOCKET NO:
50 369 UNIT: McGuire 1 DATE:
11/15/92' NARRATIVE SUCARY MONTH: October 1992 McGuire 'F.it 1 began the month of October operating at 100% full u
power. The unit started a power decrease on 10/23 at 1220 due to failure of
'B' reactor building spray pump slave relay, The unit was held at 37% power from 1430 to 1b10 for Tex. tor building spray pump slavs
- repair, During power escalation, the unit held at 50% from 1745 to 1826 due to quadrant power tilt ratio problems. The unit. held at 90% power frem 10/24 at 0350 to 0428 for nuclear instrumentation calibrations.
The unit reached 100% full power at 1012.
The unit operated at or near
.% full power for the remainder of the month.
d 1
Preptred by:
N. C, Simmons Telephone:
704-382-5263 i
~ --
liONTHLY REFUELING INFORMATION REOUES_T 1.
Facility neme: McGuire, Unit 1 2.
Scheduled next refueling shutdown: March 1993 3.
Scheduled restart following refueling:23ne 1993 7
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF-ANY T.S.
CHANGE OR LICENS" AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO IDNGER DE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis
- methods, signjficant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 512 8.-
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
November 13, 1992 Name of
Contact:
E1_A. Williams Phone:
704-382-5346
.. - -. ~
~.
.. ~ -,
pp :r 4
L OPERA 11N6DATAREPORT
-t
- 3 DOCKET N3,,
50-370
.;i DATE Noyester 13. 1992
-OPERATINB STATUS COMPLFTCDBY R.A. Willians TELEPHONE 704-39?-5346-1.UnitNase:McGuire2
- 2. Reporting Period October 1, 1992-October 31,1992
- 3. Licensed Thernal Poser (MWtli 3411
- 4. Naseplate Rating (6 toss MWe):
13v5e Notes ;#Naseplate Rating'
- 5. Design Electrical Rating (Net MWel:
!!B0 (Srtss MWe) calculated as
- 6. Maxisus Dependabla upacity (6ross NWe):
117!
1450.000 MVA x.90 pcuer
- 7. Matisus Dependab.e Copacity (Net MWe):
1129
' factor per Page ill,
- 9. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Jince Last NURE6-0020.
Report.- Bive Reasons:
~
- 9. Power Level To Which Restricted, if Any (het MWelt
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cueulative-
- 11. Hours in Reporting Period 745.0 7320.0-76008.0-
- 12. Nusber-Of Hours Reactor Was Critical 745.0 4750.9 57952.4 L;
- 13. Reactor Resrrve Shutdown Hours
--0--
--0--
--0--
- 14. 6.urs Generator On-Line 745.0
-4680.2-
-27033.1-115. Unit Reserve Shu'tdoun Hours
--0--
--0-<
--0--
16, Gross Thereal Energy Gerarated (MWH)
- 2531 % 1
.15408352-
=1864247627 J 7 Su n E'x trical Energy Generated (MWHi 89W67 5339274-65170109 16, Net Electrival Energy Cenerated (MWH) 845147 ~
5096148 62476559 19.' Unit Serv!ce Factor ~
100<0 163.9 -
75.0 E20. Unit Availability Factir 100.0
' 63.9 75.0-
- 21. Unit Capacity Facter (Un ng MDC Nets 100.8.
.61.7 71.81
- 22. Unit Capatity Fictor (Using DER Net) 96.5
.59.0
'69.7-i:
- 23. Unit Forced Outage Rate 0.0 4.7 7.9 L
24, Shutdown Scheduled Over Next 6 S nths (Type, Date, and Duration of Each);
_=
n 25.'IfShutDownAtEndofReportPeriod.Est!satedDate7fStartup-D
= 26. Units in Test Status (Prior to Ccamercial Operation):
Forecast-
. Achieved-l:
INITIAL CRITICALITY N
INITIAL ELECTRICITY js COMME'!CIAL GPERATIOC L
I
!s 7
l p
~
,2 ih'.
g e
n m
- t i
CPERATING DATA REPORT-
=,
DOCKET WO 50-370
.UNil McGuire 2 DATE Noveeber 13. 1992 COMPLETED Bf R.A. Willians-TELEPHONE 704-382-5346-WNTH 0:tober, 1992 E
AVERAGF DA!LV POWER LEVEL M
AVERASE DAILY F3WER LEVEL (MWe-Net)
(MWe Net)
!!f.,
17 1!30 2
1132 10 1136 3
1126 19 1139 4-1130 20 1139 5
~
1132 El 1142 6
!!34 22
!!42 l.
7 1136 23 1142 8
1136 24
- 1145_,
9 -~
1138
'25 1143 10 1137 26 1145 11 1139 27 114' 12 1138
'20-~
1145 13 '
1139-'
29 11'44 h
-14 1138 30~
1146 i
_ -15
!!39 31 1143 t-16-1140 l
u a
~
- dl (0 <
f
.I.
~~
4 4
UNI'2' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME Mcuu1Rt; z DATE 11/ Ad/ v2 REPORT MONTH October 1992 COMP ETED BY' N.
C.
5 1 FL?lp N 5
~~
TELEPHONE __ t i v4 ) -J 62 -:>2 0 J (1) 2)
(4)
(5)
E HOD
~~
T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
~
DURATION O
DOWN REPORT TEM COMTONENT ACTION TO DATE.
t HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S I
t (1).
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions A-Equipment failure 1-Manual for Preparation of Data
.B-Maintenance or test (Explain)
S Scheduled 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram EventRegG-O{LER) rt D-Regulatory R9striction 4-Other (Explain)
File (NU 61) erator Training & License Examination E-Og$ $ $
E H-O her (Explain) (Explain).
r xhibit I - Same Scurce
. a
m i i'
- -i
- 4.-
t UNIT: McGuire 2 DATE:
11/15/92'-
NARRATIVE
SUMMARY
MONTil: October 1992 McGuire Unit 2 began the month of October operating at 100% full power. The unit operated at or near 100% for the entire month. The-unit ended the month at 100% full power.
y 1.!
i j
s se i,.
j j "c -
F l :.
1, l.-
7, j ',
Prepared by:-
N. C. Simmons-Telephone:
704-382-5263' l,
4 B:
~
..J.,
n -
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire.
Unit 2 2.
Scheduled next refueling shutiown:_Btly 1993 3.
Scheduled restart following refueling: Sootember 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require e technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Raview Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the cere: 193 (b) in the spent fuel pool: 2n 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
November 13. 1992 Name of
Contact:
R.
A.
Williams Phone:
704-382-5364
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT September 1992 1.
Personnel Exposure -
For the month of September, no individual (s) exceeded 10 percent of their allowable annual-radiation dose-limit.
2.
The total station liquid release ter Decem?er has been compared with the Technical Specificationa maximum annual dose commitment and was less than 10 percent of this limit.
The total statior gaseous release for December has been cmpared with the Technical Specifications maximum annual 0 se commitment and was less than 10 percent of this list.
j l
?: