UNhN ELECTRIC COMPANY Novem":r e, le^?
Colloway Plant Nuclear Regulatory Comreission Document Control Desk Washington, DC 20555 ULNRC 2720
Dear Sir:
DOCKET NUMBER 50-t85 CALit.WAY PLANT UNIT 1 FACILITY OPERATINC LICENSE NPF-30 MONTHLY OPERAT4NU REPORT OCTOBER 199?
The enc'.osed Monthly Operating Report for October, 1992 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
l
- f W. R, Campbell Yb hekWh'FAh$
Manager, Callaway Plant d
VRC/DEY/J AM/ TAM /JF, K'/ crc Enclosure cc:
Distribution attoched 160088 9211160416 921031 PDR ADOCK 05000493 f
R pop
, p hb1rg Addrest PO. Box e4 Futton.MO 65254 s
4
?..
7
-is
-cc sJstribution-for'ULNRC-2720
+
with enclosures
- Mr. Richard _ Hague, Chief Project Secticn lA U. S. Nuclear Regulatory Commission Region III 799-Roosevelt Road
-4 Clen Ellyn, IL -60137 Mr. L. R. Wharton (2 copies)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rochville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P.0, Box 360 Jefferson City, MO 65102 i
5 f..,
n 4
e L
-->b.
.-n.-
DOCKET No.
50-483
- UNIT NAME CALLAWAY UNIT 1 DATE 11 06 92 COMPLETED BY J. W. Knaup TELEPHONE 314/676 8485 PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the entire month.
=i PART B PORV AND SAFETY VALVE
SUMMARY
None l-i l
(:
l i
j i
'I Page 1 of 4
~_~
.. ~ -
J 1
. + <
PART C
' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 p
UNIT Callaway Unit 1L
,DATE 11-06-92'
~
l-COMPLETED BY-
~J. W. Knaup; j
- TELEPHONE 314/676 8485
.)
MONTih OCTOBER 1992
- AVERAGE EAILY POWER LEVEL AVERAGE DAILY POWER LEVEL-EA%
-(MWe Net)
DAY (MVe-Nets l
1 1148 17 1163 2
1146 18 1161 3
1145 19 1163 4
1144 20-1154~
5 1146 21 1146
j 6
1151 22 11'42' 7
1148 23 1141 8
1150 24 1150 9
1154 25 1151 10 1155 26 1162 l
l.
11 1158 27 1170 L
1:2 1156 28 1171 13 1151 29 1170 14 1141 30
_Ll70 15 1148 31 1165" i
16 1159 i.r lL
- Page 2 of 4 r
m
=
- O.
Part D-OPERATING DATA REPORT-DOCKET NO.
50-483 UNIT NAME CALLAVAY UNIT 1-DATE 11 06 92 COMPLETED BY J. W. Knaup TELEPh0NE 314/676-8485 OPERATING STATUS (YTD CUN) 1.
RfPORTING PERIOD: OCTOBER 1992 GROSS HOURS IN REPORTING PER100: 745 7320 68.941.5 2.
CURRENTLY AUTHORIZED POVER LEVEL (MVt): 3565 MAX. DEFEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MVe-Net): 1171 3.
POWER LEVEL TO VHICH RESTRICTED (IF AN'l;(i!.'e-;ct):
4.
REASJNS FOR RESTRICTION (IF ANY),
,iHIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR VAS CRITICAL..
745.0 5825.2 59.913.7' 6.
REACTOR RESERVE SHUTD0VN HOURS.,,..
0 0
0 7.
HOURS GENERATOR ON LINE.........
745.0 5742.3
'58.591.7 8.
UNIT RESERVE $HUTE'0VM HOURS..,
0 0
0-9.
GROSS THERHAL EhERGY GENERATED (MVH)....
2,636.341 19,656.795 195.919.658
- 10. GROSS ELECTRICAL fNERGY GENERATED (MVH).
900,004 6.715.668 66.778.832
- 11. NETELECTRICALENERGYGENERATED(MVH).
859.841 6;3h 33
~ 63.470,431 l
j
- 12. REACTOR SERVICE FACTOR........
100.0 79.6 86.9 13 REACTOR AVAILASILITY FACTOR.....
100.0 79.6-86.9 l
- 14. UNIT SERVICE FACTOR........
100.0 78.4 85.0 l
- 15. UNIT AVAILABILITY F wf0R.'..........
100.0 78.4 85.0'
- 16. UNIT CAPACITY FACTOR (Using MDC)......
'102,6
}/.6 81.8-l
- 17. UNITCAPACITYFACTOR(UsingDesignMVe)..
98.6 74.6 78.6 I
- 18. UNIT FORCED OUTAGE RATE......
0.0 2.4 2.9
- 19. SHUTDOVNSSCHEDULEDOVERNEXT6 MONTHS (TYPE.DATE.NNDDURATIONOFEACH)i l'
- 20. IF SHUT 00VN AT END OF REPORTING PERIOD. ESTIMATED DATE OF $TARTUP:
Page 3 of 4
r
, i PART E
. ' +-'
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAME CALLAWAY 1: NIT 1 DATE 11-06-92 COMPLET O BY J. W. Knaup TELEPHONE - 314/676-8485
. REP 01T MONTH: OCTOBER 1992 METHDD OF TYPE SHUTTING DOWN
'F: FORCED DURATION THE REACTOR OR-
. No.
DATE'
.. S : SCHEDULED (HOURS)
.- RE/ SON REDUC; G POWER CORRECTIVE ACTIONS / COMMENTS
SUMMARY
REASON.
METH00 A: EQUIPMENT FAILUR! (EXPLAIN) 1: MANUAL B: MAINT. OR TEST.
2: MAN'JAL-SCRAM C. REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)
E: OPERATOR. TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL' ERROR (EXPL/lN)
^ H: OTHER (EXPLAIN).
4 y
.,.,.4l' 7
7 e