ML20116K032
| ML20116K032 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/07/1996 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9608140197 | |
| Download: ML20116K032 (3) | |
Text
'
e stztion cupport o.p2rtm:nt -
A 10 CFR 50.90 v
PECO NUCLEAR
= ~ c-Nuclear Group Headquarters g5psygard A Uw or PEco Emcr August 7,1996 Docket No. 50-277 License No. DPR-44 U. S. Nuclear Regulatory Commissici1 ATIN: Document Control Desk Washington, D.C. 20555
SUBJECT:
Peach Bottom Atomic Power Station, Unit 2 Supplemental information Regarding Facility Operating License Change Request, ECR 96-02011
REFERENCE:
Letter from G. A. Hunger (PECO ENERGY) to NRC dated June 13,1996.
Dear Sir:
In the reference letter PECO Energy Company (PECO Energy) submitted License Change Request (LCR), ECR 96-02011, requesting changes to Appendix A of the Peach Bottom Atomic Power Station (PBAPS) Unit 2 Facility Operating Ucense.
The proposed change was requested to permit a one time performance of Surveillance Requirement 3.3.1.1.12, for the Average Power Range Monitor (APRM)
Flow Biased High Scram function, with a delayed entry into its associated Technical Specifications Conditions and Required Actions for up to six hours provided core flow is maintained at or above 82%. This change would be in effect until the end of refueling outage 2R11, currently scheduled for early October 1996.
During their review of the LCR, the NRC required additional information. The requested information was provided to the NRC verbally during a conference call on July 29,1996. The purpose of this letter is to document the information provided during that call.
In the LCR, PECO Energy stated that a modification was scheduled to be i
performed which would eliminate the need for future similar LCRs. The NRC i
requested a description of the modification and a discussion as to why it would j
eliminate future similar LCRs.
SQOh $
gDI'o 7
- 4 August 7,1996 Page 2 As stated during the conference call, the modification will replace all flow input instrumentation to the APRM system. The new instrumentation will have improved reliability and drift characteristics necessary to support a 24 month calibration frequency. Currently, the calibration frequency for this instrumentation is 18 months. This extension in calibration frequency will allow the surveillance test to be performed off-line thereby removing the need for future similar LCRs.
i If you have any questions concerning this submittal, please contact us.
Sincerely, h/[ h$ffen G. A. Hunger, Jr.
Director - Licensing
Enclosure:
Affidavit cc:
T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, Senior Resident inspector, PBAPS, USNRC R. R. Janati, Commonwealth of Pennsylvania L
~.
COMMONWEALTH OF PENNSYLVANIA
- SS.
COUNTY OF CHESTER i
D. B. Fetters, being first duly sworn, deposes and says:
That he is Vice President of PECO Energy Company; the applicant herein; that he has read the attached supplemental information regarding Ucense Change Request (ECR 96-02011) for changes to the Peach Bottom Facility Operating License DPR-44, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
h k
Jib \\
~ " ~ Vice President Subscribed and sworn to before me this day of a f 1996.
h4A1]
bY A.
Notag Public t
Now.d SE31 Mary Lou Skrocki. Notary Public i
Tredyfirin Twp., Chester Count 90
- My Commission E 4:ites May 17, T1 ;;;,ar.Puv cA 1 3 k ~23!*" d **