Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-96-0115, Forwards Fitness-for-Duty Program Performance Data Rept for 960101-0731 + (03:15:21, 13 December 2024)
- ML20116M079 + (03:15:22, 13 December 2024)
- ML20116M077 + (03:15:22, 13 December 2024)
- 3F0896-04, Forwards 10CFR26 fitness-for Duty Program Performance Data six-month Rept for Jan-June 1996 + (03:15:23, 13 December 2024)
- ML20116M075 + (03:15:23, 13 December 2024)
- RC-96-0210, Responds to NRC Bulletin 96-004, Chemical,Galvanic or Other Reactions in Spent Fuel Storage & Transportation Casks. Issue Not Applicable to Plant + (03:15:24, 13 December 2024)
- 05000331/LER-1996-003, :on 960716,PCIS Groups 1-5 Isolations Occurred. Caused by Electrical Protection Assembly Breaker Trip Undervoltage.Placed Bus on Alternate Power Supply & Reset Isolations & Half Scram + (03:15:26, 13 December 2024)
- AECM-85-0128, Remits Fee for 850311 Proposed Mods to Startup Test Program + (03:15:27, 13 December 2024)
- ST-HL-AE-5403, Application for Amends to Licenses NPF-76 & NPF-80,removing SR Which Refs Toxic Gas Monitoring Sys + (03:15:28, 13 December 2024)
- ML20116M065 + (03:15:28, 13 December 2024)
- ML20116M058 + (03:15:29, 13 December 2024)
- ML20116M056 + (03:15:30, 13 December 2024)
- ML20116M055 + (03:15:30, 13 December 2024)
- ML20116M032 + (03:15:31, 13 December 2024)
- NSD-NRC-96-4800, Forwards Responses to RAI & Open Items Contained in Nov 1994 Draft SER on AP600 + (03:15:32, 13 December 2024)
- 05000352/LER-1985-040, :on 850330,LOCA Signal Occurred During Cold Shutdown.Caused by Personnel Error.Personnel Counseled on Proper Method of Valving & Importance of Following Procedures.Surveillance Test Revised + (03:15:33, 13 December 2024)
- ML20116M013 + (03:15:36, 13 December 2024)
- ML20116M005 + (03:15:37, 13 December 2024)
- ML20116L990 + (03:15:38, 13 December 2024)
- ML20116M001 + (03:15:38, 13 December 2024)
- ML20116L987 + (03:15:39, 13 December 2024)
- ML20116L983 + (03:15:40, 13 December 2024)
- ML20116L976 + (03:15:41, 13 December 2024)
- ML20116L973 + (03:15:41, 13 December 2024)
- ML20116L970 + (03:15:42, 13 December 2024)
- ML20116L965 + (03:15:43, 13 December 2024)
- 1CAN119203, Monthly Operating Rept for Oct 1992 for Ano,Unit 1 + (03:15:44, 13 December 2024)
- ML20116L948 + (03:15:44, 13 December 2024)
- 2CAN119204, Monthly Operating Rept for Oct 1992 for Ano,Unit 2 + (03:15:45, 13 December 2024)
- ELV-05015, Responds to Violations Noted in Insp Repts 50-424/92-20 & 50-425/92-20 on 920823-0926.Corrective Actions:Mgt Expectations Re self-verification Have Been Reemphasized to RO & Discipline Administered to RO & Unit Shift Supervisor + (03:15:46, 13 December 2024)
- ML20116L900 + (03:15:46, 13 December 2024)
- ML20116L894 + (03:15:47, 13 December 2024)
- 05000265/LER-1987-019-01, ,on 871116,notified That Three Piping Supports Did Not Comply W/Fsar Criteria for Allowable Stress.Caused by Design Error Due to Mod in 1980.Variable Spring Cans Adjusted & Rigid Strut Support Installed + (03:15:49, 13 December 2024)
- B14290, Proposed Tech Specs Re Operability of Charging Pump + (03:15:51, 13 December 2024)
- ML20116L874 + (03:15:51, 13 December 2024)
- 05000456/LER-1992-012-06, :on 921018,SG Water Levels Raised to Approx 45%,resulting in Leak in Feedwater Check Valve,Allowing Upstream Feedwater Piping to Be Filled from Sg.Caused by Feedwater Pump Autostart.Sg Levels Increased + (03:15:53, 13 December 2024)
- ML20116L865 + (03:15:54, 13 December 2024)
- 3F0585-01, Application for Amend to License DPR-72,consisting of Proposed Tech Spec Change Request 128 to Resolve Conflicts Between Current Tech Specs & Commitments Made to Provide Low Temp Overpressurization Protection + (03:15:55, 13 December 2024)
- ST-HL-AE-1234, Final Deficiency Rept Re Inability of Containment Spray Sys to Maintain Spray Ph Less than 10.5 Under All Conditions. Intially Reported on 840921.Spray Additive Tanks Will Be Isolated at End of Injection Phase + (03:15:56, 13 December 2024)
- 05000483/LER-1992-011, :on 921017,four Field Contact Power Supply Output Fuses Blew Causing All Mcb Annunciators Inoperable. Caused by Short in Power Transformer.Mod Will Be Evaluated to Improve Reliability of Rk Sys + (03:15:58, 13 December 2024)
- NSD-NRC-96-4799, Responds to RAI on AP600 + (03:15:59, 13 December 2024)
- 05000352/LER-1985-039, :on 850330,ESF Actuated.Caused by False Low Reactor Water Level Signal Due to Personnel Error During Performance of Instrument Valve check-off List.Esf Reset & Proper Procedure Reviewed W/Personnel + (03:16:00, 13 December 2024)
- ML20116L789 + (03:16:04, 13 December 2024)
- 05000316/LER-1985-009, :on 850327,monthly Vent Stack Composite Sample Lost During Isotopic Extraction Procedure.Caused by Error in Lab Technician Handling Technique.Personnel Counseled Re Handling Breakable Equipment + (03:16:06, 13 December 2024)
- ML20116L785 + (03:16:07, 13 December 2024)
- 05000247/LER-1985-005, :on 850326,main Boiler Feedwater Pumps 21 & 22 Tripped During Preplanned Power Descent.Probably Caused by Pressure Transient in Feedwater Sys.Positioner on Feedwater Regulating Valve Replaced & Valve Stroke Reset + (03:16:09, 13 December 2024)
- 05000302/LER-1984-015, :on 840404 & 0713,emergency Diesel Generator B Auto Started.On 840713,emergency Diesel B Air Start Pressure Low Alarm Activated.All Events Caused by Drain Petcock Failure.Air Start Air Filters to Be Replaced + (03:16:11, 13 December 2024)
- 05000341/LER-1985-002, :on 850328 & 31,loss of Power to Sys Svc Transformer Occurred,Resulting in Half Scram Signal & Isolation of Reactor Water Cleanup Sys.Caused by Ground Fault at Breaker A6.Duct Leak Repaired + (03:16:14, 13 December 2024)
- 05000254/LER-1985-014-03, :on 850403,fuel Pool Radiation Monitor 1A Spiked High.Caused by Electrical Noise Interference.Monitor Reset + (03:16:16, 13 December 2024)
- 05000528/LER-1985-009, :on 850321,inadvertent Reactor Trip Occurred. Caused by Personnel Error Associated W/Procedural Deficiency.Procedure Change Notice Written + (03:16:18, 13 December 2024)
- 05000254/LER-1985-013-03, :on 850329,Train B Standby Gas Treatment Sys Started W/O Apparent Start Signal.Reactor Bldg Ventilation & Control Room Ventilation Sys Tripped.Caused by Relay 2-1701-100B Coil Failure.Relay Replaced + (03:16:20, 13 December 2024)
- 05000341/LER-1985-001, :on 850328 & 31,reactor Protection Sys Div 1 Power Loss Occurred,Resulting in Reactor Scram.Caused by Ground Fault at Breaker A6.Breaker Replaced & Duct Leak Repaired W/Temporary Seal + (03:16:32, 13 December 2024)