2CAN119204, Monthly Operating Rept for Oct 1992 for Ano,Unit 2
| ML20116L917 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/31/1992 |
| From: | James Fisicaro, Whitt M ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 2CAN119204, NUDOCS 9211190254 | |
| Download: ML20116L917 (7) | |
Text
-;.
gl.. W
/_
f
- s.
g
' Entstgy Operatisns,lt'c. -
'N 1bje 3 LW U.iG Operations' 1
r"ua ^" =
wm wnn
_._-_.u..._._....__..
-.-w.--
1 l
November 13, 1992
]
r i
~
-i t
U.
S. Nuclear Regulatory Commission Document Control Desk Mail Stop P1-137 Washington, D.C.
20555 SUBJECT!
Arkansas' Nuclear One - Unit 2 Docket No. 50-368 Licensa No. NPP-6 Monthly Operating Report l
-Govitlemon!
Monthly Operating Report statistics for Arkansas Nuclear One',
'i Unit-2, for Octobor, 1992 is attachad.
Thir. report ist Submitted'in aCCordance with ANO-2 Technical. Specification
-l 6.9.1.6.
-Ve.
trul
- yours, i
[, $ f ~~
-i n
i J
eth.Fisicaro-CN D root r, Licensing JJP/JRH/sjf Attachment cc:
Mr. James-L. Hilhoan g
Regional Administrator U. : S. Nuclear _ Regulatory Commission Region:;IVL.
611.Ryan Plaza Drive, Suite 400-
-M Arlington, : TX 76011-8064.
w.
NRC Senior Resident-Inspector..
~;
. Arkansas NuclearEOnoa-ANO-1-&
-2.
-Number 1,' Nuclear 91 ant Road Russellvillo,1.- AR 7728011 f3.hf y
4
.hV-qjJ, 92111902041921031-J
_PDH-ADOCK1050003481
- i a 1
h.
- .PDR-i.u
- 4-
=
^
l\\
~~
.a
~ '
l
\\
U. S. 13RC 11ovember 13, 1992
' 2 Call 119204 Page 2 Mr. Thomas W. Alexion liRR Project Manager, Region IV/AliO-1 U.
S.
liucicar Regulatory Commission llRR Mail Stop 13-11-3 Ono White Flint 11 orth 11S55 Rockville Pike Rockvi;'le, Maryland 20052 Mo. Shori Peterson liRR Project Managor, Region IV/ Allo-2 U.
S.
Iluclear Regulatory Commiosion liRR Mail Stop 13-11-3 One White Flint llorth 11555 Rockvjlle Pike Rockvil40, Maryland 20852 s
it 4
OPER ATING DATA RETORT DOCKET NO:
50 368 l
DATE:
Novenher 1,1992 COMPLETED IW: M. S. Whitt TELEPilONE:
(501) 9@55to 91TIMIISREIAIUS 1.
Unit Name. Arkant,as Nucleat One. Unit 2 2.
Reporting Pctiod.
Octobet 1 31,1992 1
Licensed Therhed Power (h:WI):
,2,.M i $
4.
Nameplate Rating (Gross MWe): 942 57 Design Electrical Rating (Net MWe): 912 6
Maximum Dependable Capacity (Gross MWe): 897 7.
Maximum Dependable Cagucity (Net MWc); 858 8.
If Changes Occur in Capacity Ratings (items Number 3 Through 7; Since 1st Report, Give Reasons:
9 Power Inct To Which Restrictui If Any (Net MWe). Nonc 10.
Reasons For P.cstrictions, if Any.
,Ncme h10H111 X1ETihDK1I CUh1UIM1W l 1.
Ilours in Reporting Pctiod.
743 0 7,320.0 110,472.0 12.
Number ofIlours Reactor was Critical.
326.8 4,989.9 B2,967.3 13.
Reactor Resenc Shutdown ilours.
0.0 0.0 0.0 14.
Ilours Generator On Line.
280.5 4,928.2 81,115.4 15.
Unit Reserve Shutdow n llours.
0.0 0.0 0.0 16 Gross Thermal Energy Ocncrated (MWill 586,321 13,456.207 213,715,315 17.
Gross Electrical Energy Generated (MWil).
192.280 4,430,82$
70,283.656 18.
Net Electrical Energy Generated iMWil).
176,666 4,213,159 66,840,972 19 Unit Service Factos.
37.6 673 73.4 20.
Unit Availability Factor.
37.6 673 73 4 21.
Unit Capacity Factor (Using MDC Net).
27.6 67.1 70.5 22.
Unit Capacity Factor (Using DEC Net).
26 0 53 1 66 3 23.
Unit Forced Outage Rate.
0.0 20.9 12 4 24, Simtdowns Scheduled Oser Ne<t 6 Months (Type, Date, and Duration of Each):
~
25.
If Shut Down At End of Report Period. Estmmted Date of Startup:
Un.i s in Test Stams (Prior io Commercial Oyration):
26, t
Forecast Achieved INITIAL CRITICALITY 12/05/78
~
INITI AL ELECTRICITY 12/26/78 COMMEllCI AL OPERATION 03/26/30
-.~ m
'A I
..,p n
j ',.
f' AVERAGE DAILY UNIT POWER LEVEL Jg
' r-DOCKET NO:
50 36H UNIT:
Tw o,,_
DATE:
November 3,1992 COMPLETED BY: M.S Whitt TELEPl!ONE:
@)l)9645$60 MONDI thtetJ192 DAY AVFRAGE DAILY POWER LEVEL (MWe Net) 1
.1 2......
-3
-3 3
3 4
4 C
4 6
t 7
3 8
2 9.,,.
4 10.
-3 16.
4
- 12. s.
8 13.
47 14.....,.....
16 15,
23 16.,.......
25 17.
26 18..,,
26 M
19.......
27 20.........
46 21_.
190
-22.,,,.,....
$24 23.....
- $98 24..
66!
669-23.........
26.
-676 27...
680 28.......,,.,,,,.,-..
846
'I 29.-
'894
.4 30....
885 839.
31,......
- AVGS:: 237 INS 1RU.C110N
.On this fonnat, list the average daily unit power levelin MWe-Net for each
- day in repoding month. Completc to the nearest nhole megauntt -
1
<x b
NRC MONTIIIS OPERATING REPORT OPERATIB G
SUMMARY
OCTOllER 1992 uni r TWO The unit began the month of Octobe in a refueling outage (2R9).
At 0634 hours0.00734 days <br />0.176 hours <br />0.00105 weeks <br />2.41237e-4 months <br /> on the twentieth, the unit was placed back on-line marking the end of 2R9.
The unit was taken of f line for I hour and 59 minutes to perform the Main Turbirse j
Overspeed Trip test at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on the twentieth. Foilowing the successful comp)ction of the MTOT test the unit was placed on line at 1414 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.38027e-4 months <br /> that same day. The unit followed the nornial power ascension after a refueling outage up to 75% power. At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on the twenty-fourth, the power escalation was halted at 75% power due to Main Feed Pump problems. The power escalation was recommenced at 2216 hours0.0256 days <br />0.616 hours <br />0.00366 weeks <br />8.43188e-4 months <br /> on the twenty-seventh and the unit attained 100% power at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br /> on the twenty-eighth. A power reduction to 95% power was cornmenced at 2000 bcurs on the thirtieth for the moderator temperature coefficient test. Upon the completion of the MTC test the unit was returned to 100% power ut 1818 hours0.021 days <br />0.505 hours <br />0.00301 weeks <br />6.91749e-4 months <br /> on the thirty-first.
The unit held at 100% power for the remainder of the month.
UNIT 511UTDOWNS AND POV/ER REDUCTIONS REPORT FOR OCTOBER.1992 DOCKET NO.
50-%8 UNIT NAME ANO Umt 2 DATE Nwember 3,1992-COMPLETED BY M. 5 W1utt TFLEPHONE 501N4-5 Mi METiiOD OF IJCENSEE DURATION SittJITING DOWN EVENT SYSTEM COMPENENT CAUSE & CORRECTIVE ACTION TO 8
REPORTS CODE' CODE' FREVENT RECURRENCE M
DATE TYPE' (IIOtJRS)
REASON 2 REACTOR 92-83 921001 S
462.6 C
4 N/A ZZ ZZZZZ2.
Unit stT line for 2R9 Refucting Outzge.
92-04 921029 S
2 ff 9
N/A ZZ 777777 Main Turbine Oierspeed Trip Test.
3 4
I 2
Metbod:
Exhibit G -Instactions F: Forced Reason:
5: Scheduled A - Equipmeaa Failure (Explain) 1 - Manual for Prepration of Data B-Maintenance of Test 2 - Manual Scrsa Entry Sheets for Ucensee 3-Automatic Scran Event Report {LER) File (N1%EG-0161; C-Refueling 4 - Continuation D-Regulatory Restriction E - Operator Trs!ning & Liceme Examination 5 - Load Reduction F-Admiahtrstion 9 - Other 5
Eshibit I-Same Source G-Operational Error H - Other(Explain)
~
- - - - _ ~
.-. -.- ~
. _.... -. -.. ~. ~. -.. -. _..
-. ~.
i DhTE1 October, 1992 i
1 REFUELING INFORMATION 1.
Naue of facility: AIAangjte Nucingt Qngdit 2 2.
Scheduled data for noitt refueling shutdown. tjarch 4.
1994.
3.
Scho1uled date for restart following refueling.
hpril 25, 1994 4.
Will refueling or resumpt. ion of operation thereaf ter require a technical specification change or other licence amer.dment? If answer is yes, what,_in general, will there be?
If answer is no, han the.
reload fuel desig's and core configuration been reviewed by your plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section.
50.59)?
No Technien.,,jineci fiention changga_pI_11E9Dec-13).9.D m_ent e,,ggg kngL) i d
!.o be recuired at thi.pirge.
5.
Scheduled date(s) for submitting proposed licensing action and aupporting information. Ii2DR J e au i r.grL, 6.
Important licer.aing conriderations associated with refueling, e.g.,
new or different fuel design or supplier, unroviewed design or performance enalysis methods, significant changes-in fuel design, new' operating _proceduren.-
nog.e 7
The number of-tuel assemblien (n) in the coro and (b).in the spent l
fuel storage pool. a) 122
. b) 565 8.
The-preannt licensed spent fuel pool storago capacity and tho' air.o;of any increase in licanoed storage teapacity that - hao -been roquested or in planned,'in numbsr of fuel assemblies, i
present 988-it. crease sisk by 9 l'
9.
The projected date of the last refuellr.g thht can be discharged,to the spent fuel pool assuming the prosent licensed capacity.
DATE:- 1997 Usoas_of fu11 core offload capability)_
}