Monthly Operating Repts for Oct 1992 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2
ML20116L900
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/31/1992
From: Cruse C, Shanley L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9211190231
Download: ML20116L900 (11)


Text

..

p f5 At.TIMORE GAS AND EL.ECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT

  • %0 CALVERY CLIFFS PARKWAY
  • LUSBY. MARYLAND 20657-4702 CHARLES H CnUSE MANt GENLHAL UMekGlts cAlvim c4 Frs November 13,1992 U. S. Nuclear kegulatoiy Commimon Washington,DC 20$55 ATTENTION:

Document Control Desk

SUBJECT:

Calvent Cliffs Nu:lcar Power Plant Unit Nos.1 & 2; Docket Nos. 50 317 & 50-318 October 1992 Opt 1atine Data Rep _uits Centlemen:

'Ihc subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any quections, please contact htr. Bruce hirowca at (410) 260-3989.

Very trulyyours, h

} fl& Cat

/,

V'

)

CliC/LDS/bjd

. '/##

. Attachments cc:

D. A. Brune, Esquire J. E. Silberg, Esqaire R. A. Capra, NRC D. G. hfcDonald, Jr., N RC T. T. hiartin, NRC -

P. R. Wilson, NRC R.1, McLean, DNR.

J.11. Walter, PSC R. A. Ilasificid,NRC P. Lewisi INPO-K. Larson, ANI' g

a#fd['

922i19o2ai 92icai PDR.ADOCK 05000317 G g-a eor i

e E

ecco************************************************************************

UNIT 1 OPERATING DATA REPORT o*ce************************************************************************

Docket No. 50-317 j

November 13, 1992 Prepared by Leo Shanley Telephone:(410)260-6744 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD OCTOBER 1992 3.

LICENSED THERMAL POWER (MWT) 2700

4. NNHEPLATE RATING (GROSS MWe) 918 1

5.

DESIGN ELECTRICAL RATING (NET MWe) 845 6.

MAXIMUM DEPENDADLE CAP'Y (GROSS MWe) 860

7. KAXIMUM DEPENDA3LE CAP'Y (NET MWo) 825 8.

CHANGE IN CAPACITY RATINGS NONE

9. POWER LEVEL TO WilICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative' This month Year-to-Date to Date-
11. HOURS IN REPORTING PERIOD 745

'7,320 153,277

12. NUMBER OF HOURS REACTOR TiAS CRITICAL 745.0 3,623.2 106,923.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0,0 3,019.4
14. HOURS GENERATOR ON LINE 723,.8 3,520.9 104,571.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0,0
16. GROSS THERAAL ENERGY GENERATED (MWH) 1,897,433 9,173,169.263,509,676
17. GROSF ELECTRICAL ENERGY GEN'TED(MWH) 629,386 3,025,071 87,560,759
18. NET ELECTRICAL ENERGY GENERATED (MWH) 603,295

-2,897,929 83,253,434

19. UNIT SERVICE FACTOR 97.2 48.1

-68.2

20. UNIT ~AVATLADILITY FACTCR 97.2 48.1 68.2
21. UNIT CAPACITY FACTOR (USING MDC NET)

.98.2 48.0 65.8

22. UNIT CAPACITY FACTOR (USING DER NET) 95.8 46.9 64.3
23. UNIT FORCED OUTAGE RATE 0.0 3.8 9.3

~24.

SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A.

25. IF_ SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A y

UNIT SIIUTDOWNS AND POMTR REDUCTIONS DOCKETNO.

SM17 UNITNAME Cahrri Cliff-U1 DKE NexmSer 13.1W2_.

COMPLETED BY t c Shan!cv TELEPHONE (41012NM74.t REPORTMONTII October 1992 l

l MET 110D OF i

4 SilUTUNG i.ICENSEE CAUSE & CORRECITV5i DURA' HON DOWN EVENT SYSTEM COMPONENT ACHONTO I

(IIOURS)

REASONI REACTOR 3 REPORT #

CODE 4 CODES PREVINT RECURRENCE NO.

DATE

'O'FEI 92 M7-9210(M F

0.0 A

5 N/A SM RV Redd power to repair 14ALowPressure Feedwater Heater (LPFW tube side relief vahe.

J 92 03 921007 F'

0.0 A

5 N/A SM RV Reduced power to repair 15A low Pressure 4

Feedaster Heater (i.PFV/) tube side relief valve.

92 09 921009 S

'21.2 B

9 N/A AB MO Unit taken off the grid for maintenance outaEe to work on 11B Reactor Coolant Pump Lube Oil System. LPFW relief vahts and other equipment.

i e

t

.5 '

o

e E

'l F: - Forced 2 Reason: -

3 Method:

4 IEEE Standard 805-1984 I

S: Scheduled._

_ A - Equipment Failure 1 - Manual l

B -Maintenance orTest 2 - ManualScram.

I 5 FFF Standard 803A-1983 i

C-Refueling 3 - Automatic Scram.

I D-Regulatory Restriction 4 -Continued

. [

E - Operator Tr=Ws & License Examination 5-Reduced load t

F-Administrative 9 - Other.

l

' G - Operational Error H - Other i

W va-

--T',y T+

'Vwi e

Yew

-s-Te+*-*

w n

v-1, o

A e

AVERAGE DAILY UNIT POWER LEVEL occo********************************************************************

Docket No. 50-317 Calvert Cliffs Unit No. 1 November 13, 1992 0"9 pared by Loo Shatiloy nephonet (410) 260-6744 OCTOSER 1992 Average Daily Power Level Avorage Daily. Power.Loval Day (MWe-Not)

Day (MWo-Net) 1 862 17 859 2

859 18 860-3 855 19 861 4

739 20 863 5

742 21 863 6

859 22 864' 7

806 23

.864-1 8

696 24 864 i'

9 854 25 865 10 48 26 865 11 518 27 865 12 862 28 865 13 865 29 865 14 862 30 868 15 858 31 868 16 858 l

I W

F F

w

-i DOCKET NO.50 317 CALVERTCLIFFS UNIT 1 November 13, IV>2

SUMMARY

OF OPERATING EXPERIENCE I

Qctober 1992 ne unit began the month at 100% (860 MWe).

j Power was reduced to 75% (650 MWe) from 1130 on October 4 to 1730 on October 5 while repairing 14A low Pressure Feedwater "feater (LPFW) tube side relief valve (RV).

Power was reduced to approximately 80% (655 MWe) from 2000 on October 710 0025 on October 9 while repairing 15A LPFW tube side RV.

A power reduction was commenced at 2330 on October 9 for a scheduled maintenance outage. De unit was off the grid from 0424, October 10 until 0136, October 11, Work included:

e location and repair of oilicak on 11B Reactor Coolant Pump (RCP),

+ -Installation of remote fill system for RCP oil, e'

Repair of 13A and 15A LPFW RVs, and 6

Waterbox c! caning, instrument calibtation and Main Generator Stator Cooling maintenance.

The unit returned to 100% (840 MWe) at 1500 on October 11.

The unit ended the month at 100% (865 MWe).

w-9 y-g 4

y*

,w m-p

=+e-

November 6, 1992 REUfd.ING. INFORMATIQLEQUfjI 1.

Name of facility: Calvert Cliffs Huclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown:

March 5, 1994, 3.

Scheduled date for restart following refueling: May 17, 1994.

j G.

Will refueling or resumption of operation thereafter require a Technical Spect" tion change or other license amendment?

None identified at this time.

5.

Scheduled date(s) for submitting proposed licensing action and supportirig information.

December 1993 for UIC12.

6.

Important licensing considerations associated with the refueling.

None identified at this time.

7.

The number of fuel assemblies (a) in th3 core and (b) in the spent-fuel storage pool.

(a) 21).

(b) 1410.

Spent fuel pools are common to Units 1 and 2.

8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830.

(b) 2880.

9.

The prajected date of the last refeeling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 1993 l

1 l7 l

. _ _ m _ _

-m.

9

, h_t s. '

.g Loooo*******************e 4

.iUNIT 2 OPERATING DATA REPORT a

oo**************************************************************************

Docket No. 50-318 November 13,.1992 Prepared by Leo Shanley Telephonet(410)260-6744-

_e OPERATI.N.G STA.T.US

1. UNIT NAME Calvert Cliffs Unit 2 2.-REPORTING PERIOD OCTOBER 1992-
3., LICENSED THERMAL POWER (MWT) 2700-4.' NAMEPLATE RATING (GROSS NWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845 6.-MAXIMUM EEPENDABLE CAP'Y (GROSS MWo) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWo) 825 8.. CHANGE IN CAPACITY RATINGS NONE

-9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A a

'k Cumulativei This month ' Year-to-Date to Date,

..............................y......

A ~

13. HOURS-IN. REPORTING PERIOD 745.

7,320; 136,632L

12. NUMBER OF HOURS REACTOR WAS CRITICAL 680.5 6,460.1' 98,500.4 4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0i

_ 1,296.6.

14. HOURS GENERATOR.ON LINE 674.8

.6,395.6 97,117.C

15. UNIT.-RESERVE SHUTDOWN HOURS 0.0 0.0.

-O.0-16., GROSS THERMAL ENERGY GENERATED:(MWH) 1,796,165 17,066,345;247i205,6511

17. UROSS. ELECTRICAL ENERGY GEN'TED(MWH) 583,792

'5,576,248 81,660,629'

'18. NET ELECTRICAL' ENERGY GENERA'IED(MWH) 558,440-5,344,852?<.78,023,000 3

19. UNIT SERVICE FACTOR 90.6-

.87.4:

71.1-0

=

20.; UNIT AVAILABILITY FACTOR 90.6 87.4-71.1 y

21.: UNIT CAPACITY. FACTOR:(USING MDC NET)-

90.9-88.5~

69.2m

22. -UNIT CAPACITY FACTOR (USINC DER NET)'

88.7-86;4-

-67.6

23. UNIT PORCED OUTAGE RATE 9.4

' 12 :. 6

' 6.1 124 SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE:AND DURATION):

Refueling, February 19, 1993 for 108 days.

~

~

IF UNIT IS SHUTDOWN AT END'OF REPORT PERIOD, 125.

ESTIMATED DATE OF START-UP N/A L

i e

r e

n <

-. c.

..,a

..a,1 m

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO.

'o-318 UNrrNAME Q1 vert Cli'fs-U2 DATE November 13.1992 COMPLETED BY Lcp Shaniev TFIFPHONE (4101260 4744 REPORTMONTII October 1*92 ML'THOD OF CAUSE t CORRECHVE SHUTHNG LICENSEE DURATION DOWN EVFET SYSTEM COMPONENT ACriON TO (IIOURS)

REASGN2 REACIOR3 REPORT #

CODE 4 CODES PREVENTRECURRENCE NO.

DATE TYPEI 92-10 920929 F

70.2 A

2 924XTl SB RV Outage cantinued from last month.

92 921018 F-0.0 A

5 N/A EC BKR Power reduced to facilitate repairs to a 480 volt bruker. 22 SGFP taken off-line to proent a possible trip while working in the 48C Volt MCC.

t t

1 l l

4 1 F:- Forced 2 Reason:

3 ' Method:.

IEEE Standard 805-1984 S:._ Scheduled

. A - Equipment Failure.

1 - Manual B - Maintenance or Test 2-Manual Scram.

~

C-Refueling 3 - Automatic Scram.

5 IEEEStandard 803A-1983 D-Regulatory Restriction 4 - Continued E - Operator Training & Li: case Examination 5 - Reduced Lead F-Administrative 9 - Other i --

. G -Operational Enor.

H - Other 4

g y

x w

w ~

AVERAGE DAILY UllIT POWER LEVEL

                                                    • a*********************************************

Docket llo. 50-318 Calvert Cliffs Unit lio. 2 flovember 13, 1992 Prepared by Leo Shanicy Telephone: (410) 260-6744 OCTOBER 1992 Average Daily Power 1,nvol Average Daily Power Level Day (MWe-tiet)

Day (MWo-liet) 1 0

17 842 2

0 18 774 3

0 19 845 4

695 20 847 5

838 21 846 6

841 22 846 7

843 23 846 8

842 24 845 9

840 25 046 10 838 26 845 11 842 27 846 12 836 28 842 13 835 29' 045 14 838 30 840 15 841 31 731

f 16 841

DOC}[ET NO. 50 318 CALVERT CLIFIL UNIT 2 November 13,1992 SUhthtARY OFOPERATING EXPERIENCE October IW2 The unit began the month in llot Shutdown (hfode 4) awaiting repairs to 23 hicisture Separator Rcheater (htSR) relief valve.

Reactor Coolant system heatup was commenced at 2030 on October 2. The reactor was taken critical at 1633 on October 3 and paralleled at 2215.

Power was raised to 88% and held there from 0605 to 1415 on Octobei 4 to repair 21 IIcater Drain Tank Normal Lesel Control Valve (;iLCV). 'ne unit reached 100% (835 h1We) at 1730.

Power was reduced to 60% from 1510 to 1540 on October 18 to allow for the removal of 22 Steam Generator Feed Pump (SGFP) from service. This was to prevent a lost. of feed during maintenance in the 480 Volt h1CC which provides power to the SOFP Control System. Power was returned to 100% at 2140.

Power wa reduced to 88% (730 htWe) at 024f on October 31 for hiain Turbine valve testing, waterbox 6 aning and repairs to 21 licater Drain Tank NLCV.

The unit ended the month at 90% (750 htWe).

b L

1 1.

e y.,

Novemkr 6 992 EfEWl,1f!LiliE0RMUQfLREESI 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.

Scheduled date for next refueling shutdown:

Febrt:ary 19, 1993.*

i 3.

Scheuuied iste for restart following refueling:

Hay 31, 1993.*

4.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendmenti No.*

5.

Scheduled date(s) f>r submitting proposed licensing action and supnort m; information.

None required.*

i 6.

Important licensing considerations associated with the refueling.

The target inngth for this cycle will be 570 effective full power days.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217.

(b) 1410.

Spent fuel pools are common to Units 1 and 2.

8.

(a) The prasent licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is placined, in number of fuel assemblies.

(a) 1830.

(b) 2880.

9.

The projected date of the last refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March '993