Docket No.00-423 B14290 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Operability of the Charging Pump

. November 1992 9211190191 921112 PDR -ADOCK 05000423

-P -PDR

m

. o ; A . n ..

e e 1 INDEX DEllRillsS SECTION PAGE 1.32 SLAVE RELAY TEST............................................. 1-6 1.33 SOURCE CHECK................................................. 16 1.34 STAGGERED TEST BASIS....................................... . 1-6 1.35 THERMAL P0WER................................................ 1-6 1.36 TRIP ACTUATING DEVICE OPERATIONAL TEST....................... 1-6 1.37 UNIDENTIFIED LEAXAGE......................................... 1-6 1.38 UNRESTRICTED AREr............................. ............... 1 1,39 VENTING.................................. . ................. 1-7 1.40 SPENT FUEL P0OL STORAGE PATTERNS............................. 1-7 1.41 SPJNT FUEL POOL STORAGE PATTERNS............................. 1-7 1.42 CORE OPERATING LIMITS REF0RT................................. 1-7 ND 3,7 1.43 ALLOWED POWER LEVEL--APL ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

1,44 ALLOWED POWER LEVEL--APLBL ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 3,7 1.45 THE CHARGING PUMP OPERABILITY................................ 7 TABLE 1.1 FREQUENCY N0TATION...................................... 1-8 TABLE 1.2 OPERATIONAL MODES... ................................... 1-9

_J.

~ MILLSTONE - UNIT 3 11 Amendment No. 79, EE, ##-

0103 E- _

ya o DEFIhlTIONS _

YDillE 1.39 VENTING shall be the controlled process of discharging air or gas from' a ,

confinement to maintain temperature, pressure, humidity, concentration,- or other operating condition, in such a manner that replacement air or gas is not -l provided or required during VENTING. Vent, used in system names, does not i imply a VENTIM process.

SPENT FUEL POOL STORAGE PATTERNS:

1.40 Region I spent fuel racks contain a cell . blocking device 'in every 4th location for criticality control. This 4th location will be referred to as the blocked location. A STORAGE PATTERN refers to the blocked location and all adjacent and diagonal Region I cell locations surrounding ' the blocked location. Bour.dary configuration between Region I and Region 11 must have cell blockers positioned in the outermost row of the Region I perimeter, as shown in Figure 3.9 2.

2.41 Region II contains no cell blockers.

00kE OPERATING l.IM!TS REPORT (COLR) 1.42 The CORE OPERATING LIMITS REPORT (COLR) is the unit-specific document that provides core operating limits -for the current operating reload cycle.

These cycle-specific core operating limits snall be determined for each reload cycle in accordance with Specification 6.9.1.6. Unit Operation within these operating limits is addressed in individual specifications.

ALLOWED POWER LEVEL ND 1.43 APL is the minimum allowable nuclear design power level for base load operation and is specified in the COLR.

1,44 APL OL is the maximum allowable power level when transitioning into base load operation.

THE CHARGING PUMP OPERABILITY 1.45 For Cycle 4 operation only,-if the outside air temperature is below 17'F, OPERABILITY of the charging pump is defined as including credit for a temporary heating source in order to maintain at least 32'F within the charging pump / reactor plant component cooling water pump areas of the auxiliary building. Modifications will be implemented, prior to startup ' for -

Cycle 5 operation, to remove reliance on a temporary heating source.

MILLSTONE - UNIT 3 1-7 Amendment No. A9, ES, EE 0104