Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000362/LER-1996-003-02, :on 960803,delinquent I Sample Analysis Noted Following 15% Power Change in 1 H Period.Caused by Lack of Direct CR Indication to Confirm Compliance W/Ts Requirement. RCS Sample I Analysis Completed + (02:43:43, 13 December 2024)
- ML20117H690 + (02:43:44, 13 December 2024)
- LIC-96-0070, Forwards Application for Amend to License DPR-40,revising TS to Clarify Surveillance Test Requirements in TS 3.1,Tables 3-1,3-2,3-3 & 3-3A,per GL 96-01 & NUREG-1432 + (02:43:45, 13 December 2024)
- ML20117H684 + (02:43:45, 13 December 2024)
- ML20117H683 + (02:43:47, 13 December 2024)
- ML20117H676 + (02:43:48, 13 December 2024)
- ML20117H675 + (02:43:48, 13 December 2024)
- ML20117H674 + (02:43:49, 13 December 2024)
- ML20117H672 + (02:43:50, 13 December 2024)
- ML20117H671 + (02:43:51, 13 December 2024)
- 05000395/LER-1996-008, :on 960805,plant Personnel Discovered That STP-501.001,had Been Performed on B Train Station Battery, While Battery Was on Equalize Charge.Caused by Procedural Inadequacy.Procedure Has Been Changed + (02:43:52, 13 December 2024)
- ML20117H662 + (02:43:54, 13 December 2024)
- LIC-96-0073, Forwards Public & Central Files Versions of Revised EPIPs & Radiological Emergency Response Plan.Central Files Version Revised EPIPs Withheld + (02:43:55, 13 December 2024)
- ML20117H658 + (02:43:55, 13 December 2024)
- ML20117H652 + (02:43:56, 13 December 2024)
- LIC-96-0072, Discusses 960418 Telcon Involving NRC & Util Re Util Providing Clarification of Methodology Involved in Human Reliability Analyses Portion of Plant IPE + (02:43:57, 13 December 2024)
- ML20117H632 + (02:43:58, 13 December 2024)
- LIC-96-0059, Requests Relief from ASME B&PV Code,Section III Overpressure Protection Requirements for Ccws + (02:43:59, 13 December 2024)
- ML20117H621 + (02:44:02, 13 December 2024)
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed + (02:44:04, 13 December 2024)
- ML20117H616 + (02:44:05, 13 December 2024)
- ML20117H617 + (02:44:05, 13 December 2024)
- ML20117H612 + (02:44:06, 13 December 2024)
- ML20117H607 + (02:44:07, 13 December 2024)
- 05000302/LER-1996-015, :on 960408,determined That Cables Routed Improperly Due to Personnel Error.Cables Routed to MCB-SSR Replaced W/Appropriate Cables & Mods of Circuits Associated W/Toxic Gas Monitors Completed + (02:44:09, 13 December 2024)
- ML20117H593 + (02:44:10, 13 December 2024)
- 05000423/LER-1996-010-02, :on 960425,determined That Potential Failure Mode of Rod Control Sys Acopian Power Supplies Could Create Unanalyzed Condition.Caused by Inadequate Design Review. Reset Feature Will Be Deleted + (02:44:12, 13 December 2024)
- ML20117H587 + (02:44:13, 13 December 2024)
- ML20117H585 + (02:44:14, 13 December 2024)
- LIC-96-0071, Forwards Application for Amend to License DPR-40 & TS, Relocating Operability Requirements for Shock Suppressors (Snubbers) from TS to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements in TS 3.3 + (02:44:15, 13 December 2024)
- 05000302/LER-1996-014, :on 960325,discovered That ASME Section XI Category B-K-1 Exam Not Performed.Caused by Personnel Error. All Category B-K-1 Insps Identified & Completed During Refuel 10 + (02:44:16, 13 December 2024)
- TXX-9637, Forwards Supplemental Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (02:44:17, 13 December 2024)
- ML20117H571 + (02:44:18, 13 December 2024)
- ML20117H563 + (02:44:19, 13 December 2024)
- 05000456/LER-1996-005-03, :on 960423,identified Operation of Safety Injection Accumulators Outside Design Basis.Caused by Mgt Deficiency.Operating Procedures Revised + (02:44:21, 13 December 2024)
- ML20117H559 + (02:44:23, 13 December 2024)
- ST-HL-AE-5458, Forwards 1RE06 ISI Summary Rept for Repairs & Replacements STP Project Electric Generating Station,Unit 1 + (02:44:24, 13 December 2024)
- ML20117H549 + (02:44:28, 13 December 2024)
- ML20117H556 + (02:44:28, 13 December 2024)
- AECM-85-0155, Forwards Response to 850503 Request for Addl Info Re FSAR Startup Test 25B, Full Reactor Isolation. Startup Testing Program Ahead of Schedule.Review & Approval of Encl Info Requested to Allow Implementation of Revised Test Schedule + (02:44:29, 13 December 2024)
- ML20117H541 + (02:44:33, 13 December 2024)
- ML20117H536 + (02:44:34, 13 December 2024)
- ML20117H535 + (02:44:34, 13 December 2024)
- ML20117H524 + (02:44:35, 13 December 2024)
- ML20117H523 + (02:44:36, 13 December 2024)
- ML20117H513 + (02:44:37, 13 December 2024)
- PY-CEI-NRR-0244, Clarifies SER Section 6.3.1.3 Re Safety Relief Valve Operability.Each Automatic Depressurization Sys Valve Will Be Manually Actuated During Initial Plant Startup & After Refueling Outages to Demonstrate Operability + (02:44:37, 13 December 2024)
- ML20117H509 + (02:44:38, 13 December 2024)
- 3F0596-22, Informs NRC That FPC Completed New SBLOCA Analyses in Support of Efforts Re Improved HPI Instrumentation & Change as Stated in PCT in Accordance w/10CFR50.46 Requirements + (02:44:39, 13 December 2024)
- ST-HL-AE-5457, Forwards 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Electric Generating Station,Unit 1 + (02:44:39, 13 December 2024)
- ML20117H486 + (02:44:41, 13 December 2024)