Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RC-96-0146, Forwards Annual (1995) ECCS Evaluation Model Revs Rept for Plant,Per 10CFR50.46 + (02:32:28, 13 December 2024)
- 05000328/LER-1996-002-05, :on 960822,discovered Failure to Properly Identify Steam Generator Tube May Have Exceeded Tech Spec Plugging Criteria.Caused by Misjudgement by Two Independent Analysts.Evaluation Performed + (02:32:30, 13 December 2024)
- B15750, Provides NRC W/Proposed Changes to NPDES Permit CT0003263 for Hydrazine & Cooling Water Flows.Request to Amend Permit Submitted to State of CT Dept of Environ Protection on 960520 + (02:32:31, 13 December 2024)
- ML20117M468 + (02:32:32, 13 December 2024)
- ML20117M467 + (02:32:33, 13 December 2024)
- ML20117M464 + (02:32:34, 13 December 2024)
- ML20117M456 + (02:32:37, 13 December 2024)
- ML20117M458 + (02:32:37, 13 December 2024)
- ML20117M448 + (02:32:38, 13 December 2024)
- 05000348/LER-1985-007-01, :on 850411,Fire Door 401 Declared Inoperable & Could Not Be Repaired within 7 Days.Caused by Loose auto- Closure Mechanism & Loose Astragal.Fire Watch Established. New Door Assembly Ordered + (02:32:40, 13 December 2024)
- ML20117M441 + (02:32:45, 13 December 2024)
- ML20117M435 + (02:32:46, 13 December 2024)
- ML20117M432 + (02:32:47, 13 December 2024)
- ML20117M428 + (02:32:48, 13 December 2024)
- ML20117M427 + (02:32:49, 13 December 2024)
- ML20117M421 + (02:32:50, 13 December 2024)
- ML20117M419 + (02:32:51, 13 December 2024)
- HL-5184, Forwards Revised Ei Hatch Nuclear Plant Description of & Justification for Changes to QA Program + (02:32:52, 13 December 2024)
- ML20117M412 + (02:32:53, 13 December 2024)
- 05000366/LER-1985-010-01, :on 850409,certain Valves Discovered Leaking in Excess of Limits Specified in Tech Spec Sections 3.6.1.2.b & C.Valves Will Be Repaired & Tested + (02:32:54, 13 December 2024)
- RS-84-068, FOIA Request for C-E Repts CEN2P (Dec 1976) & CEN42P (Jan 1974) Re Steam Generator Repair + (02:32:55, 13 December 2024)
- ML20117M385 + (02:32:56, 13 December 2024)
- ML20117M374 + (02:32:57, 13 December 2024)
- ML20117M384 + (02:32:57, 13 December 2024)
- ML20117M371 + (02:32:58, 13 December 2024)
- ML20117M366 + (02:33:00, 13 December 2024)
- ML20117M365 + (02:33:01, 13 December 2024)
- ML20117M363 + (02:33:01, 13 December 2024)
- ML20117M362 + (02:33:03, 13 December 2024)
- ML20117M351 + (02:33:04, 13 December 2024)
- ML20117M347 + (02:33:05, 13 December 2024)
- ML20117M349 + (02:33:05, 13 December 2024)
- AECM-85-0154, Forwards Application for Amend to License NPF-29,revising Offsite & Unit Organization Charts to Reflect Newly Established Positions of Manager of Employment & Personnel Supervisor,Respectively.Fee Paid + (02:33:06, 13 December 2024)
- ST-HL-AE-5465, Forwards Current Annual Financial Repts for Licensees for STP + (02:33:07, 13 December 2024)
- ML20117M339 + (02:33:07, 13 December 2024)
- ML20117M327 + (02:33:08, 13 December 2024)
- NSD-NRC-96-4820, Forwards Retransmittal of W Response to NRC RAIs on Notrump Computer Code.Nonproprietary & Proprietary Version Attached Per Requesting Need to Identify Proprietary Portions of Responses + (02:33:09, 13 December 2024)
- ML20117M325 + (02:33:09, 13 December 2024)
- ML20117M295 + (02:33:10, 13 December 2024)
- ML20117M307 + (02:33:10, 13 December 2024)
- ML20117M291 + (02:33:11, 13 December 2024)
- ML20117M288 + (02:33:12, 13 December 2024)
- U-602632, Monthly Operating Rept for Aug 1996 for Clinton Power Station Unit 1 + (02:33:13, 13 December 2024)
- ML20117M272 + (02:33:13, 13 December 2024)
- 2CAN099602, Forwards Rev 1 to Plant Cycle 12 COLR Being Issued Due to Administrative Error Discovered on Coordinates for Long Term Steady State Insertion Limit Line on Figure 4 of COLR + (02:33:14, 13 December 2024)
- ML20117M258 + (02:33:15, 13 December 2024)
- ML20117M255 + (02:33:15, 13 December 2024)
- 05000249/LER-1985-011-05, :on 850416,reactor Bldg Vent Trip & Isolation Occurred W/Standby Gas Treatment Sys B Automatically Started.Caused by Fuel Handlers Removing Machinery from Fuel Pool.Machinery Washed to Reduce Dose Levels + (02:33:17, 13 December 2024)
- 05000423/LER-1996-014-02, :on 960516,surveillances for Emergency Diesel Generator Performed During Operation,Versus Shutdown.Caused by Misinterpretation of Shutdown Stipulation.Surveillances Performed During Shutdown + (02:33:20, 13 December 2024)
- ML20117M244 + (02:33:21, 13 December 2024)
- 05000423/LER-1996-013-02, :on 960515,determined Design Deficiency in Residual Heat Removal System (Rhs).Caused by Original Plant Design.Corrective Actions Will Be Described in Supplement + (02:33:23, 13 December 2024)
- ML20117M233 + (02:33:24, 13 December 2024)