Wisconsin Electnc
\\
i POWER COMPANY
\\
Point Beoch Nuclear Plant (414) 755-2321
]
6610 Nuclear Rd., Two Rivers. WI 54241 1
J PBL 96-0176 i
September 5,1996 1
Document Control Desk l'
U. S. NUCLEAR REGULATORY COMMISSION j
Mail Station PI-137 Washington,DC 20555 Gentlemen:
4 i
DOCKETS 50-266 AND 50-301 l
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units I and 2 of the Point Beach Nuclear Plant for the calendar month of August 1996.
Sincerely, a
.f%.1 4, S. A. Patulski PBNP Manager smb Attachments 4
cc:
L. L. Smith, PSCW NRC Regional Administrator, Region III
{
NRC Resident Inspector 9609170358 960031 PDR ADOCK 05000266 PDR R
]([ /
i A num utuiurmsin nwo ngwim j
OPEFATING DATA REPORT DOCKET NO. 50-266 DATE: 09/04/96 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES
- 2. REPORTING PERIOD: August - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5,855.0 226,343.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,290.5 189,944.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 744.0 5,244.6 186,726.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,562.0 7,887,655.0 265,103,804.0
- 17. GROSS ELECTRICAL t-s'ERGY GENERATED 383,070.0 2,688,840.0 89,595,210.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 366,436.0 2,571,323.5 85,424,408.0
- 19. UNIT SERVICE FACTOR 100.0 %
89.6 %
82.5 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
89.6 %
82.9 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.6 %
90.5%
77.5 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 %
88.4 %
75.9 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
... - _.. - -.. ~
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach,' Unit 1
~
MONTH AUGUST-1996 DATE 9/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
489 11 496 21 495 2
487 12 494 22 496 3
486 13 493 23 494 4
488 14 492 24 496 5
493 15 494 25 496 6
496 16 492 26 495 7
497 17 494 27 495 8
497 18 481 28 488 9
496 19 495 29 489 10 497 20 496 30 486 31 487
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Nxme Point Beach. Unit i UNIT SilUTDOWNS AND POWER REDUCTIONS Date 9/5/96
" ~
Crunpleted By B. J. Vander Velde REPORT MONTH AUGUST - 1996 Telephone No.
414n55-6681 Method of Licensee Event Duration Reactor Report No.
System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Shut Down' Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain)
PBF M 8b (03-90)
A.
i DOCKET NO.
50-266 UN.IT NAME Point Beach Unit 1 DATE 9/5/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 1 operated at an average of 493 MWe net for the August,1996 report period.
Licensee Event Report 266/96-003, Plant Operation Outside the Design Basis of Low Temperature Overpressure (LTOP) System Licensee Event Report 266/96-004, Service Water System Outside Design Basis Licensee Event Report 266/96-005, Service Water Boiling in Containment Fan Coolers Outside Design Basis 1
Safety-related maintenance included:
- 1. HX-013B spent fuel pool heat exchanger gaskets replaced.
- 2. P-38A auxiliary feed water pump discharge control positioner bellows replaced.
i
- 3. P-032E service water pump impeller clearance adjusted.
- 4. P-029 turbine-driven auxiliary feedwater pump oil seal replaced and washer installed.
- 5. P-032B service water pump balanced.
- 6. SW-02838 service water heat exchanger outlet control valve cleaned.
l i
l
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 09/04/96 OVt'PLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
- 2. REPORTING PERIOD: August - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5,855.0 211,128.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,839.5 185,166.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 744.0 5,835.9 182,690.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,011,601.0 7,958,335.0 262,490,488.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 343,450.0 2,724,710.0 89,227,970.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 326,503.0 2,595,597.5 85,060,247.0
- 19. UNIT SERVICE FACTOR 100.0 %
99.7 %
86.5 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
99.7 %
86.7 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 90.5 %
91.4 %
82.5 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 88.3 %
89.2 %
81.1 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.3%
0.9 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach,' Unit 2 MONTH AUGUST-1996 DATE 9/4/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET I
1 438 11 444 21 443 2
436 12 364 22 444 3
436 13 440 23 442 4
436 14 442 24 445 5
442 15 443 25 445 6
445 16 441 26 443 7
446 17 440 27 443 r
8 447 18 442 28 436 9
446 19 443 29 436 3
10 446 20 444 30 433 31 434
POINT BEACil NUCLEAR PLANT Docket No.
50-301 Unit Nune Point Beach. Unit 2 UNIT SifUTDOWNS AND POWER REDUCTIONS Dite 9/6/96 Completed By B. J. Vander Velde REPORT MONTil AUGUST - 1996 Telephone No.
414 055-6681 Method of Ucensee Event Duration Reactor Repont No.
System Cornponent Cause and Corrective Action No.
Date Type' (Houis)
Reason' Shut Down' Code' Code' To Prevent Recurrence 3
960812 NA 0
A 5
NA HF FILTER Chlorination of the iranke structure exacerbated the die off of alewives that blocked the circulating water traveling screens,2Z-027-1,2Z-027-2, and 2Z-027-3 causing Unit 2 to be reduced to 48% power. Chlorination of the irsake structure has been postponed until the event has been evaluated.
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain) li - Other (explain)
PBF-0028b (03-90)
i DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE 9/5/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681
- t 1
l-Unit 2 operated at an average of 439 MWe net for the August,1996 report period.
Safety-related maintenance included:
- 1. P-029 turbine-driven auxiliary feedwater pump bearing temperature alarm point changed.
- 2. P-011 A component cooling water pump line repaired.
l l