Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125B774 + (01:56:05, 13 December 2024)
- ML20125B773 + (01:56:05, 13 December 2024)
- ML20125B769 + (01:56:06, 13 December 2024)
- ML20125B767 + (01:56:07, 13 December 2024)
- ML20125B766 + (01:56:08, 13 December 2024)
- ML20125B765 + (01:56:08, 13 December 2024)
- ML20125B764 + (01:56:09, 13 December 2024)
- ML20125B763 + (01:56:09, 13 December 2024)
- ML20125B762 + (01:56:10, 13 December 2024)
- ML20125B757 + (01:56:11, 13 December 2024)
- ML20125B760 + (01:56:11, 13 December 2024)
- HL-3044, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-22 & 50-366/92-22.Corrective Actions:Design Change Will Be Implemented by 930531 to Remove Ability to Override Automatic Isolation Function for Dampers + (01:56:12, 13 December 2024)
- ML20125B751 + (01:56:13, 13 December 2024)
- ML20125B755 + (01:56:13, 13 December 2024)
- ML20125B750 + (01:56:14, 13 December 2024)
- ML20125B747 + (01:56:15, 13 December 2024)
- ML20125B748 + (01:56:15, 13 December 2024)
- ML20125B746 + (01:56:16, 13 December 2024)
- ML20125B745 + (01:56:16, 13 December 2024)
- ML20125B744 + (01:56:17, 13 December 2024)
- ML20125B742 + (01:56:18, 13 December 2024)
- ML20125B743 + (01:56:18, 13 December 2024)
- ML20125B741 + (01:56:19, 13 December 2024)
- W3P85-1058, Notifies That Design & Procedural Mods Re Fire Watch at Isolation Panel in Relay Room of Reactor Auxiliary Bldg Complete.Fire Watch Terminated on 850531 + (01:56:19, 13 December 2024)
- ML20125B737 + (01:56:20, 13 December 2024)
- ML20125B736 + (01:56:22, 13 December 2024)
- ML20125B734 + (01:56:23, 13 December 2024)
- ML20125B735 + (01:56:23, 13 December 2024)
- ML20125B732 + (01:56:24, 13 December 2024)
- ML20125B731 + (01:56:25, 13 December 2024)
- ML20125B730 + (01:56:25, 13 December 2024)
- ML20125B729 + (01:56:26, 13 December 2024)
- ML20125B728 + (01:56:27, 13 December 2024)
- ST-HL-AE-1268, Forwards Revised FSAR Questions & Responses Re Diesel Generators & Lighting Sys.Revised Info Will Be Incorporated Into FSAR Amend 49 + (01:56:28, 13 December 2024)
- ML20125B726 + (01:56:29, 13 December 2024)
- ML20125B725 + (01:56:30, 13 December 2024)
- ML20125B724 + (01:56:30, 13 December 2024)
- ML20125B722 + (01:56:31, 13 December 2024)
- ML20125B721 + (01:56:31, 13 December 2024)
- ML20125B720 + (01:56:32, 13 December 2024)
- ML20125B719 + (01:56:33, 13 December 2024)
- 05000334/LER-1979-040-99, /99X-0:on 790920,during Operational Mode 3,vital Bus Inverter 4 Transferred from Auxiliary Power Source to Inverter.Inverter Was Inoperable & Safety Injection Occured. Caused by Operator Error.Personnel Reprimanded + (01:56:35, 13 December 2024)
- ML20125B716 + (01:56:36, 13 December 2024)
- ML20125B715 + (01:56:37, 13 December 2024)
- ML20125B714 + (01:56:37, 13 December 2024)
- U-600072, Forwards Draft Proposed FSAR Rev Re Effects of Jet Impingement & Justification for Exceptions to Srp,Per SER Outstanding Issue 5.NUREG/CR-2913 Used for Certain Jet Analyses + (01:56:38, 13 December 2024)
- 05000270/LER-1979-009-01, /01T-0:on 791209,during Annual Maint of Engineered Safeguard Valves,Hpi Suction Valves from Borated Water Storage Tank Rendered Inoperable.Caused by Inadvertent Removal & Cleaning of Limit Switch Assemblies + (01:56:46, 13 December 2024)
- 05000423/LER-1992-026-01, :on 921103,CR Staff Determined That Performing Check Valve Testing Per Surveillance Procedure Would Align Train B of HPSI to Both Hot & Cold Leg Injection Path.Caused by Inadequate Procedure.Mod Program Changed + (01:56:48, 13 December 2024)
- 05000334/LER-1979-039-99, /99X-0:on 790920,vital Bus Inverter 4 Failed, Causing Reactor Trip & High Steam Flow Safety Injection Actuation.Caused by Failure of Vital Bus Inverter & Transfer of Vital Bus to Auxiliary Power Supply + (01:56:51, 13 December 2024)
- ML20125B705 + (01:56:52, 13 December 2024)
- 05000423/LER-1992-027, :on 921105,electrical Fault Protection Signal in Zone Between Generator & Switchyard Resulted in Reactor Trip,Turbine Trip & Generator Trip.Caused by Spurious Signal from Relays.Design Change to Be Pursued + (01:56:55, 13 December 2024)
- 05000270/LER-1979-009, Forwards LER 79-009/01T-0 + (01:56:56, 13 December 2024)