Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000423/LER-1992-025, :on 921102,LCO 3.4.9.2.a Not Initiated for Pressurizer Heatup.Caused by Lack of Detailed Procedural Guidance & Licensed Operator Error.Procedure Change Re Insurge During Plant Heatup Implemented + (01:55:53, 13 December 2024)
- ML20125B790 + (01:55:54, 13 December 2024)
- PNO-V-85-033, on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage + (01:55:55, 13 December 2024)
- ML20125B788 + (01:55:55, 13 December 2024)
- IR 05000089/1985001 + (01:55:56, 13 December 2024)
- ML20125B784 + (01:55:57, 13 December 2024)
- ML20125B785 + (01:55:57, 13 December 2024)
- ML20125B783 + (01:55:58, 13 December 2024)
- ML20125B781 + (01:55:59, 13 December 2024)
- ML20125B782 + (01:55:59, 13 December 2024)
- ML20125B779 + (01:56:00, 13 December 2024)
- ML20125B778 + (01:56:00, 13 December 2024)
- 05000333/LER-1992-047, :on 921104,automatic Shutdown Cooling Occurred Due to Loss of Power to Rps.Caused by Voltage Drop When Starting Large Electrical Load.Protective Device Setpoint Will Be Evaluated + (01:56:03, 13 December 2024)
- ML20125B775 + (01:56:04, 13 December 2024)
- ML20125B774 + (01:56:05, 13 December 2024)
- ML20125B773 + (01:56:05, 13 December 2024)
- ML20125B769 + (01:56:06, 13 December 2024)
- ML20125B767 + (01:56:07, 13 December 2024)
- ML20125B766 + (01:56:08, 13 December 2024)
- ML20125B765 + (01:56:08, 13 December 2024)
- ML20125B764 + (01:56:09, 13 December 2024)
- ML20125B763 + (01:56:09, 13 December 2024)
- ML20125B762 + (01:56:10, 13 December 2024)
- ML20125B757 + (01:56:11, 13 December 2024)
- ML20125B760 + (01:56:11, 13 December 2024)
- HL-3044, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-22 & 50-366/92-22.Corrective Actions:Design Change Will Be Implemented by 930531 to Remove Ability to Override Automatic Isolation Function for Dampers + (01:56:12, 13 December 2024)
- ML20125B751 + (01:56:13, 13 December 2024)
- ML20125B755 + (01:56:13, 13 December 2024)
- ML20125B750 + (01:56:14, 13 December 2024)
- ML20125B747 + (01:56:15, 13 December 2024)
- ML20125B748 + (01:56:15, 13 December 2024)
- ML20125B746 + (01:56:16, 13 December 2024)
- ML20125B745 + (01:56:16, 13 December 2024)
- ML20125B744 + (01:56:17, 13 December 2024)
- ML20125B742 + (01:56:18, 13 December 2024)
- ML20125B743 + (01:56:18, 13 December 2024)
- ML20125B741 + (01:56:19, 13 December 2024)
- W3P85-1058, Notifies That Design & Procedural Mods Re Fire Watch at Isolation Panel in Relay Room of Reactor Auxiliary Bldg Complete.Fire Watch Terminated on 850531 + (01:56:19, 13 December 2024)
- ML20125B737 + (01:56:20, 13 December 2024)
- ML20125B736 + (01:56:22, 13 December 2024)
- ML20125B734 + (01:56:23, 13 December 2024)
- ML20125B735 + (01:56:23, 13 December 2024)
- ML20125B732 + (01:56:24, 13 December 2024)
- ML20125B731 + (01:56:25, 13 December 2024)
- ML20125B730 + (01:56:25, 13 December 2024)
- ML20125B729 + (01:56:26, 13 December 2024)
- ML20125B728 + (01:56:27, 13 December 2024)
- ST-HL-AE-1268, Forwards Revised FSAR Questions & Responses Re Diesel Generators & Lighting Sys.Revised Info Will Be Incorporated Into FSAR Amend 49 + (01:56:28, 13 December 2024)
- ML20125B726 + (01:56:29, 13 December 2024)
- ML20125B725 + (01:56:30, 13 December 2024)
- ML20125B724 + (01:56:30, 13 December 2024)
- ML20125B722 + (01:56:31, 13 December 2024)