Allegation Action Plan for Consumers Power Co,Palisades Plant Re Anonymous Phone Allegation.Action Evaluation: Based on Review,Listed Method of Resolution Is Recommended for Each Allegation or Issue as Noted
ML20125B779
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/04/1988
From: Creed J, Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20125B733 List:
References
FOIA-92-253, FOIA-92-271 NUDOCS 9212100148
Download: ML20125B779 (3)


Text

i Att ac hment ALLEGATION ACTION PLAN ys g o. $.t% El-k -o I o J~

License: tea sumus V~c~ co. - V.sr - A Docket / licensee No: So - 3 5S / O f # - 3

  • Assigned Division: o<se Attached Pertinent Documents: g3 - @ r+n a c-o ~ay-r et.--

U 3M 1.

Action Evaluation:

Based on our review, the following method of resolution is recommended for each allegation or issue as specified below:

@ Send to Licensee with Rlll Followup

  • 8.

Priority Rill Followup C.

Followup During Next Routine Inspection Within Next 60 Days D.

Followup with Assistance from 0.I.

E.

No Action - Outside NRC's Charter (see attached memo)

F.

No Action - Without Merit (see attached memo)

G.

Refer Allegation to H.

Other (specify)

II. Concurrences:

9 k,/'4

(/I&

A.

Prepared by:

Technical Staff Date B.

Reviewed by:

122

/

8 56ction Chief Date J

o c [ [ k $ //Mll d b S/

C.

Approved by:

// Branch Chief' Date v

s If proposal is to send to licensee, no action plan needs to be prepared; however, if only a-part of multiple allegation is sent to licensee, then the allegation sent must be clearly defined and an action plan developed for those issues warranting Rill inspection effort.

f s & ~Yls

% f )ciL%

[Q h aeo q

f~ /

9212100148 920625-p A, 7 AK 53 PDR on"

Fanel DeC15io A.

Approved As is B.

Approved With Modifications As Discussed And P.cumented Below C.

Rejected for Following Reasons:

9"#

8) n )b*o IV, Modifications To Plan As Discussed During Review Parel 2

.~

ALLEGATION /PERlPHERAL ISSUE ACTION rt N A

f ach allegation and any peripheral issues ' associated witt the allegation should te documented on a separate-page.

If peripheral issues tre identified during P? development of this plan, please assure that' the issues correspond to a specific allegation.

Each allegation and peripheral-issues, if any, should be cccumented in the followup report exactly as is stated it this plan.

i T T 7 Allegation No.

M Peripheral Issues Associated With Allegation No.

cauc4 fa c,L,w gg.gp.Msce

,_,ago @ a s-1* W A9 A s a yta.w r e.a.e.m % che w.c s.+

a. %.,..w. M M t M4. rk um ri.44 s 4

f c.M 4 vr a s h tl 4 h*% paf bar M b Sted fM f ac-)L:*d) "

I; 4 A RM ud Qvuith *rf u n w isfar w W '

?

I Inspector's Action _s: The following areas at a minimum will be reviewed during the investigation into the above mentioned allegation and/or peripheral issues.

1..

Persons to be contacted:

I l

2.

Documents and/or activities to be reviewed:

i i

J ri 3.

Tirne period to be covered:

(

i 4.

Locations / specific areas to visit:

5.

Causes/ reasons for allegations to arise:

i I

I E.

Otherareas(specify):

i I:

3

-_..__ _ _.__._ __.._._ _ _ _ _ _ g