MONTHYEARML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20248E5791989-09-29029 September 1989 Technical Review Rept AEOD/T919, Failure of Overcurrent Protective Device at Palisades Unit 1 ML20125B7791988-08-0404 August 1988 Allegation Action Plan for Consumers Power Co,Palisades Plant Re Anonymous Phone Allegation.Action Evaluation: Based on Review,Listed Method of Resolution Is Recommended for Each Allegation or Issue as Noted ML20196H6351988-03-0808 March 1988 Headquarters Daily Rept for 880308 ML20155K5041986-05-0101 May 1986 Task Force Review of Operational History for Palisades, Final Rept 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3781999-01-20020 January 1999 LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18068A4851998-10-29029 October 1998 LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2831998-08-18018 August 1998 LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2261998-06-30030 June 1998 LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A1781998-06-0909 June 1998 LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18068A4701998-05-31031 May 1998 Annual Rept of Changes in ECCS Models Per 10CFR50.46. ML18065B2451998-05-13013 May 1998 LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr 1999-09-30
[Table view] |
Text
i Att ac hment ,
i ALLEGATION ACTION PLAN ys g o . $ .t% El- k -o I o J~
License: tea sumus V~c~ co. - V.sr - A Docket / licensee No: So - 3 5S / O f # - 3
- Assigned Division: o<se U 3M Attached Pertinent Documents: g3 - @ r+n a c- o ~ay-r et.--
- 1. Action Evaluation: Based on our review, the following method of resolution is recommended for each allegation or issue as specified below:
@ Send to Licensee with Rlll Followup * '
- 8. Priority Rill Followup C. Followup During Next Routine Inspection Within Next 60 Days D. Followup with Assistance from 0.I.
E. No Action - Outside NRC's Charter (see attached memo)
F. No Action - Without Merit (see attached memo)
G. Refer Allegation to H. Other (specify)
II. Concurrences:
A. Prepared by: 9 k,/'4 (/I&Date Technical Staff B. Reviewed by: 122 / 8 56ction Chief Date J
C. Approved by: , o c [ [ k $ //Mll d b S/Date
// Branch Chief' v s
- If proposal is to send to licensee, no action plan needs to be prepared; however, if only a-part of multiple allegation is sent to licensee, then the allegation sent must be clearly defined and an action plan developed for those issues warranting Rill inspection effort.
[Q h aeo f s$ & ~Yls % f )ciL%
q f~ /
9212100148 920625-PDR AK 53 p A, 7 on" . . -
Fanel DeC15io A. Approved As is B. Approved With Modifications As Discussed And P.cumented Below C. Rejected for Following Reasons:
- ""* 9"# *
- 8) n )b*o IV, Modifications To Plan As Discussed During Review Parel 2
_- .~ . -
A ALLEGATION /PERlPHERAL ISSUE ACTION rt N f ach allegation and any peripheral issues ' associated witt the allegation should te documented on a separate- page. If peripheral issues tre identified during P? development of this plan, please assure that' the issues correspond to a specific allegation. Each allegation and peripheral- issues, if any, should be cccumented in the followup report exactly as is stated it this plan.
i T T 7 Allegation No. M Peripheral Issues Associated With Allegation No.
cauc4 fa c,L,w gg.gp .Msce ,_,ago @ a s- 1* W A9 A s a yta.w r e.a.e.m %4che w.c s.+ a . % . ,. .w. M M t M4 . rk um ri .44 s ,'
I; f c.M 4 vr a s h tl 4 h*% paf bar M b Sted fM f ac-)L:*d) "
- 4 A RM ud Qvuith *rf u n w isfar w W '
?
I Inspector's Action _s: The following areas at a minimum will be reviewed during the investigation into the above mentioned allegation and/or peripheral issues.
- 1. . Persons to be contacted:
I l 2. Documents and/or activities to be reviewed:
i i
J r
i
! 3. Tirne period to be covered:
(
i
- 4. Locations / specific areas to visit:
- 5. Causes/ reasons for allegations to arise:
i Otherareas(specify): I I E.
i I:
- 3
-_..__ _ _.__._ __.._._ _ _ _ _ _ g