Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B14319, Forwards Rev 25 to Haddam Neck Modified Amended Security Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR2790(a) + (00:12:17, 13 December 2024)
- ML20126E876 + (00:12:20, 13 December 2024)
- ML20126E875 + (00:12:24, 13 December 2024)
- ML20126E872 + (00:12:26, 13 December 2024)
- IR 05000364/1992020 + (00:12:28, 13 December 2024)
- ML20126E864 + (00:12:31, 13 December 2024)
- ML20126E859 + (00:12:33, 13 December 2024)
- ML20126E858 + (00:12:34, 13 December 2024)
- ML20126E857 + (00:12:37, 13 December 2024)
- ML20126E855 + (00:12:40, 13 December 2024)
- ML20126E854 + (00:12:43, 13 December 2024)
- ML20126E853 + (00:12:45, 13 December 2024)
- IR 05000443/1992028 + (00:12:46, 13 December 2024)
- ML20126E848 + (00:12:49, 13 December 2024)
- ML20126E847 + (00:12:51, 13 December 2024)
- IR 05000395/1985002 + (00:12:55, 13 December 2024)
- ML20126E845 + (00:12:57, 13 December 2024)
- ML20126E844 + (00:12:58, 13 December 2024)
- ML20126E840 + (00:13:01, 13 December 2024)
- ML20126E838 + (00:13:06, 13 December 2024)
- RBG-37747, Submits Objectives to Be Fulfilled During Plant Emergency Planning Exercise to Support 930224 Exercise Date.Informs That Scenario Package Will Be Provided 60 Days Prior to Exercise Date + (00:13:07, 13 December 2024)
- ML20126E836 + (00:13:09, 13 December 2024)
- ML20126E833 + (00:13:11, 13 December 2024)
- ML20126E832 + (00:13:13, 13 December 2024)
- ML20126E831 + (00:13:14, 13 December 2024)
- ML20126E830 + (00:13:15, 13 December 2024)
- ML20126E828 + (00:13:17, 13 December 2024)
- ML20126E827 + (00:13:19, 13 December 2024)
- ML20126E826 + (00:13:19, 13 December 2024)
- 05000219/LER-1976-002-01, /01P-0:on 760106,local Leak Rate Tests Revealed That Reactor Bldg to Torus Vacuum Breakers V-26-16 & V-26-18 Had Combined Leakage Rate in Excess of Tech Specs Limit. Cause Unknown.Valves Will Be Adjusted &/Or Repaired + (00:13:23, 13 December 2024)
- ML20126E824 + (00:13:24, 13 December 2024)
- 05000219/LER-1976-001-01, /01P-0:on 760102,during Test of High Drywell Pressure Initiation of Core Spray Sys 2,high Drywell Pressure Switch RV46B Tripped at 2.75 Psig.Caused by Failure of Barton Itt Model 278 Pressure Switch + (00:13:27, 13 December 2024)
- ML20126E819 + (00:13:30, 13 December 2024)
- ML20126E818 + (00:13:31, 13 December 2024)
- 05000219/LER-1976-004-01, /01P-0:on 760123,during Surveillance Testing, Cooling Water Pressure Found Less than Tech Specs Limit. Caused by Loss of Engine Coolant Through Radiator Tube Leak. Radiator Repaired + (00:13:35, 13 December 2024)
- ML20126E814 + (00:13:37, 13 December 2024)
- 05000219/LER-1976-005-01, /01P-0:on 760303,during Diesel Generator Loading Test Procedure,Diesel Generator 2 Started in Fast Start Mode,But Did Not Develop Sufficient Voltage to Come on to 1D Bus & Assume Sequential Loads.Caused by Relay Failure + (00:13:41, 13 December 2024)
- ML20126E811 + (00:13:43, 13 December 2024)
- ML20126E810 + (00:13:45, 13 December 2024)
- ML20126E809 + (00:13:48, 13 December 2024)
- 05000219/LER-1976-008-03, /03L-0:on 760326,while Performing Surveillance of High Drywell Pressure Initiation of Core Spray Sys Pressure Switch RV46C Trip Point Found Less Conservative than Tech Specs Limit.Cause Not Stated.Pressure Switch Reset + (00:13:57, 13 December 2024)
- ML20126E803 + (00:13:59, 13 December 2024)
- ML20126E802 + (00:14:02, 13 December 2024)
- 05000219/LER-1976-009-03, /03L-0:on 760401,during Automatic Actuation Test for Containment Spray Sys 2 Trip Point for Drywell High Pressure Switches 1P15B & 1P15D Found Less Conservative than Tech Specs Limit.Caused by Instrument Setpoint Drift + (00:14:06, 13 December 2024)
- ML20126E800 + (00:14:09, 13 December 2024)
- 05000219/LER-1976-015-03, /03L-0:on 760425,during Surveillance of Core Spray Sys 2 Pumps,Leak Found in Sensing Line Leading to RV40B Pressure Switch.Caused by Cold Cycle Fatigue Failure.Sensing Line Replaced + (00:14:13, 13 December 2024)
- ML20126E798 + (00:14:16, 13 December 2024)
- ML20126E797 + (00:14:18, 13 December 2024)
- 05000219/LER-1976-014-03, /03L-0:on 760423,operations Personnel Discovered That Inboard Pump Seal on Core Spray Pump NZ01B Cracked. Cause Unknown.Pump Seal Replaced & Pump Returned to Svc + (00:14:22, 13 December 2024)
- 05000311/LER-1985-008, :on 850502,reactor Trip Occurred.Caused by Main Generator Loss of Field Relay Actuation Due to Incorrect Wiring.Electrical Schematic Revised to Show Proper Wiring Procedure.Relay Rewired + (00:14:30, 13 December 2024)
- ML20126E794 + (00:14:34, 13 December 2024)