ML20126E818
| ML20126E818 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/11/1985 |
| From: | Sorrell E GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20126E822 | List: |
| References | |
| DCS-85-47, NUDOCS 8506170232 | |
| Download: ML20126E818 (1) | |
Text
Georg'3 Power Company Poet Office Box 439 Baxley, Georgb 31513 Telephone 912 367-7781 912 537-9444 Edwin I. Hatch Nuclear Plant June 11, 1985 DCS-85-47 PLANT E. I. HATCH Emergency Implementing Procedures Docket Nos. 50-321/50-366 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Pursuant to Appendix E,Section V of 10 CFR 50, please find enclosed two (2).
copies of the replacements for existing HNP-8000 procedures except for the '
following 8000's: HNP-8012, HNP-8028, HNP-8035, HNP-8109, HNP-8122, and HNP;8126.
Also enclosed is one set of the deleted title sheets concerning the above mentioned procedures. Three (3) copies of these replacements are also being forwarded to the Region II office in Atlanta, Georgia, along with one set of the
{
deleted title sheets.
r;.
(
ll(L$
E. C. Sorrell (
Document Control Supervisor
- ECS/kim xc:
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 2900 101 Marietta Street, N.W.
Atlanta, Georgia 30323 file A
ou 8506170232 8506 =1 g
aoocn o5 pa
<