ML20126E798

From kanterella
Jump to navigation Jump to search
Draft Memo Forwarding Rev 4 to Draft User Request on Reactor Containment Integrated Leak Rate Testing,Reflecting Decisions Reached During 800613 Meeting for Implementation. RFP Issuance Planned.Info Re Personnel Assignment Requested
ML20126E798
Person / Time
Issue date: 10/20/1980
From: Reiff D
NRC
To: Butler W
NRC
Shared Package
ML20126E434 List:
References
FOIA-85-143 NUDOCS 8506170224
Download: ML20126E798 (3)


Text

q~ s *

=e>~

m o Wj$ h NOTE TO: Walter Butler ,

FROM: David D. Reiff

SUBJECT:

'NRR USER REQUEST ON REACTOR CONTAINMENT INTEGRATED LEAK-RATE TESTING 1

Enclosed is Revision 4 of the draft User Request, and is provided for your implemantation. Please arrange for processing this through NRR to RES, originating, of course, in your office.

This revision reflects the decisions reached during the meeting held June 13, 1980, with J. Shapaker, J. Pulsipher and representatives from I&E (H. Wong)

MPA,(D. Lurie), SD, (G. Arndt) and follow-up to that meeting. After endorsement from your office, we plan to issue a RFP for the program.

It would be helpful in the task descriptions to state what specific actions we expect the c ntractor to provide such as analyses, specific correlations of data, assessments and comparison of alternative options and recomendations regarding criteria and rule changes.

Another consideration for your branch is to determine if you want to include the research on containment liner channel box as a part of the leak-test RFP. A copy of this User Request is also provided for you, however, in discussions with J. Shapaker, it appears there are several questions to be resolved regarding this action.

Please let use know who you would designate from your branch for liaison and primary technical participation on this activity.

Q t f lO 8506170224 850325 PDR FOIA REYTBLA85-143 PDR $

I, 8 O

> If your have any questions, please call me on 427-4284.

the Dave Reiff

Enclosure:

Revision of Draft User Request cc w/ encl.

J. Richardson, RES G. Arndt, SD E. Jordan, IE J. Shapaker, NRR D. Lurie, MPA i

J. Pulsipher, NRR G. Bagchi, RES Y. Huang, NRR cc w o encl.

Shao, RES R. Kenneally, RES H. Wong, IE I

S. Brown, NRR W. Anderson, SD T. Murley, RES J. Larkins, RES h.Ah Fat 4 '1.1

. . I 2.j u 9lBI I. . t 1 D

. CONTAINMENT LEAK TESTING 0489 FIN: B &ltf COST: FY 1982 $150K FY 1983 50K Total $200K YEAR TO BE STARTED: FY 1982 YEAR OF PLANNED COMPLETION: FY 1983 ISSUE:

o Develop technical bases for controversial positions taken by NRC -

in 10 CFR 50, Appendix J,on containment leak testing (no physical testing planned.)

NRC VS. INDUSTRY RESPONSIBILITY:

o This is an NRC responsibility to substantiate (or refute and modify) positions taken by NRC.

COMPLEMENTARY PROGRAMS:

o Issuance of national standard, ANS/ANS 56.8 on containment leak _

^

testing.

o Sandia containment testing program will contribute some information.

PROGRESS TO DATE:

o Contract not yet let.

PLANNED SCOPE IN FY 1983:

o Conclusion of review, and provision of recommendations.

EXPECTED FINAL PRODUCT ON COMPLETION:

o If supporting Appendix J positions, will so note with no changes to Appendix J.

o If not supportingAppendix J, modifications to NRC positions and Appendix J (or ANS,/ANS 56.8) will have to be considered.

I 3 , ,