Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126F641 + (23:54:58, 12 December 2024)
- ML20126F639 + (23:54:59, 12 December 2024)
- ML20126F638 + (23:55:00, 12 December 2024)
- 05000413/LER-1984-032, :on 841219,seven Inoperable Fire Barrier Penetrations Discovered.Caused by Failure to Follow Procedures During Cable Pulling Activities.Penetrations Resealed.Personnel Will Be Retrained + (23:55:02, 12 December 2024)
- ML20126F634 + (23:55:05, 12 December 2024)
- ML20126F631 + (23:55:06, 12 December 2024)
- ML20126F630 + (23:55:07, 12 December 2024)
- ML20126F628 + (23:55:08, 12 December 2024)
- ML20126F627 + (23:55:09, 12 December 2024)
- ML20126F626 + (23:55:11, 12 December 2024)
- ML20126F625 + (23:55:13, 12 December 2024)
- ML20126F623 + (23:55:14, 12 December 2024)
- ML20126F621 + (23:55:15, 12 December 2024)
- ML20126F620 + (23:55:17, 12 December 2024)
- ML20126F618 + (23:55:18, 12 December 2024)
- ML20126F617 + (23:55:19, 12 December 2024)
- ML20126F616 + (23:55:20, 12 December 2024)
- ML20126F615 + (23:55:21, 12 December 2024)
- ML20126F611 + (23:55:23, 12 December 2024)
- ML20126F609 + (23:55:24, 12 December 2024)
- ML20126F606 + (23:55:26, 12 December 2024)
- ML20126F604 + (23:55:27, 12 December 2024)
- ML20126F603 + (23:55:28, 12 December 2024)
- ML20126F601 + (23:55:29, 12 December 2024)
- ML20126F602 + (23:55:29, 12 December 2024)
- ML20126F600 + (23:55:30, 12 December 2024)
- ML20126F599 + (23:55:33, 12 December 2024)
- ML20126F597 + (23:55:34, 12 December 2024)
- ML20126F596 + (23:55:35, 12 December 2024)
- 05000395/LER-1985-014, :on 850506,diesel Generator non-valid Test Failure,Esf Blackout Load Sequencer Actuation & Overpressure Protection Sys Challenge Occurred.Caused by Personnel Error. Bus Drawers Labeled W/Appropriate Warnings + (23:55:38, 12 December 2024)
- ML20126F593 + (23:55:40, 12 December 2024)
- ML20126F592 + (23:55:41, 12 December 2024)
- ML20126F591 + (23:55:42, 12 December 2024)
- ML20126F590 + (23:55:45, 12 December 2024)
- ML20126F589 + (23:55:46, 12 December 2024)
- ML20126F587 + (23:55:47, 12 December 2024)
- ML20126F585 + (23:55:49, 12 December 2024)
- ML20126F586 + (23:55:49, 12 December 2024)
- 05000275/LER-1985-013-01, :on 850430,Mode 4 Entered W/Two ESF Timers Out of Tech Spec Limits.Caused by Personnel Failure to Verify Timer Settings.Personnel Given Addl Training on Importance of Verifying Data + (23:55:51, 12 December 2024)
- ML20126F583 + (23:55:53, 12 December 2024)
- 05000373/LER-1985-043-01, :on 850508,high Chlorine Detector Actuated for Train B of Control Room.Caused by False Actuation of One or Both Chlorine Detectors of Control Room/Auxiliary Electrical Equipment Room HVAC (Vc/Ve) Sys + (23:55:55, 12 December 2024)
- ML20126F581 + (23:55:57, 12 December 2024)
- 05000374/LER-1985-022-03, :on 850510,reactor Scram Occurred Due to High Spikes on intermediate-range Monitor C.Caused by Equipment Failure.Nature of Failure Still Under Investigation + (23:55:59, 12 December 2024)
- ML20126F579 + (23:56:01, 12 December 2024)
- ML20126F575 + (23:56:03, 12 December 2024)
- ML20126F574 + (23:56:04, 12 December 2024)
- ML20126F573 + (23:56:05, 12 December 2024)
- ML20126F572 + (23:56:06, 12 December 2024)
- ML20126F571 + (23:56:07, 12 December 2024)
- 05000348/LER-1985-008-01, :on 850506,suction Valves a & B Closed When RHR & Overpressure Mitigation Sys Made Inoperable by Common Cause.Caused by Procedural Inadequacy & Personnel Error. Procedure Revised + (23:56:10, 12 December 2024)
- ML20126F569 + (23:56:12, 12 December 2024)