ML20126F571

From kanterella
Jump to navigation Jump to search
Notification of 930106 Meeting w/ABB-CE in Windsor,Ct to Discuss Sys 80+ Common Mode Failure Analysis & Failure Modes & Effects Analysis.Proposed Agenda Encl
ML20126F571
Person / Time
Site: 05200002
Issue date: 12/22/1992
From: Mike Franovich
Office of Nuclear Reactor Regulation
To: Pierson R
Office of Nuclear Reactor Regulation
References
NUDOCS 9212300403
Download: ML20126F571 (4)


Text

-

ih edal b h

[pa:s 'o,, UNITED STATES

. p g NUCLEAR REGULATORY COMMISSION P R WASHINGTON, D. C. 20555 s.,**..+/ December 22, 1992 Docket No. 52-00?

MEMORANDUM FOR: Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Ragulation FROM: Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (INSTRUMENTATION AND CONTROLS)

DATE AND TIME: January 6, 1993 (10 a.m. - 5 p.m.)

LOCATION: ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut PURPOSE: To discuss the ABB-CE System 80+ common mode failure analysis (CMF) and failure modes and effects analysis (FMEA). A proposed agenda is enclosed.

240013 -

ms -

9212300403 921222 i n

PDR ADOCK 05200002 (QJ P PDR (

k\ -

w ,

Y l 2- December C2, 1992 PARTICIPANTS *: EC 'ABB-CE T. Wambsch - M. Watermar: D. Harmon S. Newberry M. Chiraml- -A. Hyde.

R. Wyman (LLNL) J. Wermiel J. Palomar (LLNL)

(Original signed by)

Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation Enelosure:

Proposed Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are o)en for interested members of the public, petitioners, intervenors, or otler parties to attend as observers pursuant to "Open Meeting-Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

Members of the public who wish to attend should contact.me at .i (301) 504-1121.

DISTRIBUTION:

-Docket File PDST R/F TMurley/FMiraglia WRussell NRC PDR DCrutchfield WTravers - JNWilson RPierson TVWambach RBorchardt TBoyce SSun, 8E23 MXFranovich PShea JMoore, 15B18-EJordan, MNBB 3701 GGrant, ED0 _-ACRS (10) OPA --

NRR Mailroom, 12G18- P0' Dell, PMAS MChiramal, BH7 SNewberry,-8H7 MWaterman, 8H7 GWest, 10D24 JWermiel , 10D24 -

l OFC: LA:PDST:ADAR PM:PDS,T:ADAR SC:PDjT:ADAR NAME: r PShea:tz,,,xy MFrphfch RBohardt DATE: 12/y/92I 12/N92/ 12/p.A/92 0FFICIAL DOCUMENT COPY: CMTG0106.MXF 1 i

a ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner

  • 725 17th Street, N.W.

Washington, D.C. 20503 Mr. Raymond Ng ~

1716 Eye Street, N.W.

Suite 300 Washington, D.C. 20006 l

r

.PR'OPOSED AGENDAi +

NRC' AND. ABB-CE MEETING '

"ON INSTRUMENTATIONi& CONTROLS' .

Windsor, CTi ",

'(January 6,.1993) '

10 a.m. - 10:20 a.m.' ' Overview and Status of FMEA'and D&DID Review.-

10:20 a.m. - l?'00 Discussion of Staff Review of ABB-CE Submittal P

12 p.m. - 1 p.m. LUNCH l

1 p.m. - 4:30 p.m. Continued Discussion

~

4:30 p.m. - 5 p.m. Summary of Action Items and Commitments i

?

i a

Enclosure.

..a.- . - . ., , . - ,