- ML20127J835 + (21:13:00, 12 December 2024)
- ML20127J834 + (21:13:01, 12 December 2024)
- RBG-21279, Final Deficiency Rept DR-303 Re Damage to Pathway Bellows, Inc Bellows Expansion Joints.Initially Reported on 850607. Safety-related Vacuum Release Check Valves Installed. Expansion Joints to Be Replaced Before Fuel Load + (21:13:01, 12 December 2024)
- RBG-20-891, Forwards Util Total Insp Rept & Tdi Owners Group Mod Rept for Tdi Standby Diesel Generators,For Review + (21:13:02, 12 December 2024)
- ML20127J831 + (21:13:03, 12 December 2024)
- ML20127J830 + (21:13:03, 12 December 2024)
- ML20127J828 + (21:13:04, 12 December 2024)
- BSEP-85-0804, Environ Surveillance Rept,1984 + (21:13:05, 12 December 2024)
- ML20127J825 + (21:13:05, 12 December 2024)
- 3F0193-07, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-27.Corrective Actions:Applicable Procedural Guidance Will Be Improved by Providing Addl Barriers to Preclude Incorrect Valve Manipulation + (21:13:06, 12 December 2024)
- ML20127J822 + (21:13:07, 12 December 2024)
- ML20127J823 + (21:13:07, 12 December 2024)
- ML20127J821 + (21:13:08, 12 December 2024)
- ML20127J818 + (21:13:09, 12 December 2024)
- ML20127J817 + (21:13:09, 12 December 2024)
- ML20127J816 + (21:13:10, 12 December 2024)
- 05000344/LER-1992-034, :on 921217,several Deficiencies Identified in Fire Barrier Penetration Seals Due to Personnel Error.Fire Barrier & Penetration 275 Restored to Functional Status.W/ + (21:13:12, 12 December 2024)
- ML20127J813 + (21:13:13, 12 December 2024)
- ML20127J810 + (21:13:15, 12 December 2024)
- ML20127J812 + (21:13:15, 12 December 2024)
- 05000304/LER-1985-008, :on 850317,while at Steady State Power Operation,Reactor Tripped.Caused by Turbine Trip Induced by Actuation of Phase Main Power Transformer back-up Differential Relay + (21:13:18, 12 December 2024)
- ML20127J808 + (21:13:19, 12 December 2024)
- ML20127J807 + (21:13:20, 12 December 2024)
- ML20127J806 + (21:13:21, 12 December 2024)
- ML20127J805 + (21:13:22, 12 December 2024)
- ML20127J804 + (21:13:23, 12 December 2024)
- ET-NRC-93-3795, Forwards Responses to NRC RAIs on AP600 from Ltrs 920923, 1001 & 09.Remainder of RAIs Contained in NRC Ltrs of 920923 & 1001 Will Be Provided Prior to 930123 + (21:13:24, 12 December 2024)
- ML20127J799 + (21:13:26, 12 December 2024)
- 05000374/LER-1985-016-02, :on 850418,valve 2E51-F091 Discovered Listed in Body of Operating Surveillance Procedure LOS-RI-Q2 W/O Place for Recording Stroke Time & Initials on Data Sheet. Caused by Word Processing Error + (21:13:27, 12 December 2024)
- ML20127J797 + (21:13:28, 12 December 2024)
- ML20127J794 + (21:13:29, 12 December 2024)
- BSEP-93-0006, Provides Addl Info as Suppl to Response to Notice of Violation Re Insp Repts 50-324/92-32 & 50-325/92-32, Submitted in Ltr + (21:13:30, 12 December 2024)
- ML20127J791 + (21:13:30, 12 December 2024)
- ML20127J789 + (21:13:31, 12 December 2024)
- IR 05000461/1985029 + (21:13:32, 12 December 2024)
- ML20127J787 + (21:13:32, 12 December 2024)
- 05000409/LER-1985-007, :on 850412,after Reactor Vessel Hydrostatic Test Performed,Alternate Core Spray Sys Noticed to Be Manually Lined Up to River,Rather than Reactor Vessel.Caused by Personnel Error.Procedure Modified + (21:13:34, 12 December 2024)
- ML20127J784 + (21:13:35, 12 December 2024)
- ML20127J783 + (21:13:36, 12 December 2024)
- ML20127J782 + (21:13:37, 12 December 2024)
- ML20127J781 + (21:13:37, 12 December 2024)
- ML20127J780 + (21:13:38, 12 December 2024)
- ML20127J778 + (21:13:38, 12 December 2024)
- ML20127J777 + (21:13:39, 12 December 2024)
- ML20127J776 + (21:13:40, 12 December 2024)
- ML20127J773 + (21:13:40, 12 December 2024)
- 05000263/LER-1985-008, :on 850411,turbine Control Sys Initiated Scram When Phase Fault Occurred.Caused by Personnel Neglecting to Remove Grounding Cables After Completion of Maint Activity. Substation Relaying Will Be Modified + (21:13:42, 12 December 2024)
- ML20127J771 + (21:13:43, 12 December 2024)
- ML20127J770 + (21:13:44, 12 December 2024)
- ML20127J769 + (21:13:45, 12 December 2024)
- ML20127J768 + (21:13:45, 12 December 2024)