Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127P194 + (20:26:09, 12 December 2024)
- IR 05000327/1985006 + (20:26:10, 12 December 2024)
- ML20127P188 + (20:26:11, 12 December 2024)
- ML20127P187 + (20:26:11, 12 December 2024)
- ML20127P186 + (20:26:12, 12 December 2024)
- RC-93-0026, Forwards Revised Relief Request for Reactor Vessel Outlet Nozzle Exam,Clarifying Util Intent to Perform Insp of 100% of Table IWB-2500-1,Item B3.90 Welds During Third Period of Second & Subsequent Insp Intervals + (20:26:13, 12 December 2024)
- 05000395/LER-1992-007, :on 921027,noncompliance W/Sr of TS 3.3.1, Reactor Trip Sys Instrumentation, Identified Due to Inadequate Procedural Guidance.Surveillance Procedure Will Be Revised Prior to Next Test + (20:26:15, 12 December 2024)
- ML20127P179 + (20:26:16, 12 December 2024)
- ML20127P181 + (20:26:16, 12 December 2024)
- ML20127P176 + (20:26:21, 12 December 2024)
- ML20127P173 + (20:26:22, 12 December 2024)
- TXX-4500, Provides Updated Status of Five Items Discussed in Util Re Documentation to Complete Closure of Fire Protection Items Previously Discussed W/Nrc.Deviation Request for MSIV Downstream Valves Withdrawn + (20:26:23, 12 December 2024)
- ML20127P171 + (20:26:24, 12 December 2024)
- ML20127P169 + (20:26:25, 12 December 2024)
- ML20127P168 + (20:26:27, 12 December 2024)
- PLA-2461, Requests Registration as User of Model Cnsi 215H Series a + (20:26:28, 12 December 2024)
- ML20127P164 + (20:26:29, 12 December 2024)
- ML20127P163 + (20:26:30, 12 December 2024)
- ML20127P162 + (20:26:30, 12 December 2024)
- IR 05000247/1985014 + (20:26:31, 12 December 2024)
- ML20127P159 + (20:26:32, 12 December 2024)
- ML20127P155 + (20:26:33, 12 December 2024)
- ML20127P156 + (20:26:33, 12 December 2024)
- ML20127P153 + (20:26:35, 12 December 2024)
- ML20127P154 + (20:26:35, 12 December 2024)
- 05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10 + (20:26:36, 12 December 2024)
- ML20127P149 + (20:26:37, 12 December 2024)
- ML20127P148 + (20:26:37, 12 December 2024)
- ML20127P147 + (20:26:38, 12 December 2024)
- ML20127P146 + (20:26:39, 12 December 2024)
- ML20127P145 + (20:26:40, 12 December 2024)
- ML20127P144 + (20:26:40, 12 December 2024)
- BVY-92-132, Forwards Annual Cashflow Statements for Vermont Yankee & Each of Vermont Yankees Sponsor Companies for Year 1992 + (20:26:41, 12 December 2024)
- NRC-93-0002, Forwards Fermi 2 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test. Rept Contains Results of Test Completed on 921028 + (20:26:44, 12 December 2024)
- ML20127P140 + (20:26:45, 12 December 2024)
- ML20127P138 + (20:26:45, 12 December 2024)
- ML20127P136 + (20:26:46, 12 December 2024)
- ML20127P129 + (20:26:47, 12 December 2024)
- ML20127P131 + (20:26:47, 12 December 2024)
- ML20127P127 + (20:26:48, 12 December 2024)
- ML20127P126 + (20:26:49, 12 December 2024)
- ML20127P122 + (20:26:51, 12 December 2024)
- ML20127P123 + (20:26:51, 12 December 2024)
- ML20127P121 + (20:26:52, 12 December 2024)
- 05000331/LER-1992-020, :on 921229,cable Spreading Room Carbon Dioxide Fire Suppression Sys Exceeded Allowable Fourteen Day Period for Inoperability Due to Scope of Activitiy Being Performed. Continuous Fire Watch Established + (20:26:57, 12 December 2024)
- ML20127P117 + (20:26:58, 12 December 2024)
- ML20127P115 + (20:26:59, 12 December 2024)
- ML20127P114 + (20:26:59, 12 December 2024)
- ML20127P111 + (20:27:00, 12 December 2024)
- ML20127P110 + (20:27:00, 12 December 2024)
- ML20127P107 + (20:27:01, 12 December 2024)