Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128C328 + (19:35:38, 12 December 2024)
- ML20128C329 + (19:35:38, 12 December 2024)
- ML20128C327 + (19:35:39, 12 December 2024)
- ML20128C325 + (19:35:40, 12 December 2024)
- ML20128C324 + (19:35:42, 12 December 2024)
- ML20128C321 + (19:35:43, 12 December 2024)
- ML20128C320 + (19:35:43, 12 December 2024)
- ML20128C319 + (19:35:44, 12 December 2024)
- ML20128C318 + (19:35:45, 12 December 2024)
- ML20128C317 + (19:35:45, 12 December 2024)
- ML20128C315 + (19:35:46, 12 December 2024)
- ML20128C316 + (19:35:46, 12 December 2024)
- ML20128C314 + (19:35:47, 12 December 2024)
- ML20128C313 + (19:35:48, 12 December 2024)
- ML20128C312 + (19:35:49, 12 December 2024)
- ML20128C306 + (19:35:50, 12 December 2024)
- LIC-93-0020, Forwards Fort Calhoun Station Performance Indicators Dec 1992 Rept + (19:35:50, 12 December 2024)
- 05000316/LER-1978-037, Forwards Revised LER 78-037/01T-1 Which Rescinds Commitment to Run Emergency Diesel Generator While Other Diesel Generator Being Removed from Operable Status.Change Will Reduce Number of Fast Cold Starts + (19:35:51, 12 December 2024)
- 3F0485-20, Special Rept 85-01:on 850317,during Performance of Refueling Interval Surveillance,All Three Triaxial Peak Accelographs Required by Tech Specs Discovered Inoperable.Cause Undetermined.Accelographs Will Be Repaired + (19:35:55, 12 December 2024)
- ML20128C296 + (19:35:56, 12 December 2024)
- ML20128C294 + (19:35:57, 12 December 2024)
- PNO-V-85-029, on 850518 & 20,reactor Trip & Safety Injection Occurred Due to Loss of Vital Instrument Ac Power.Caused by Failure of Transformer in Vital Instrument Ac Inverter IY-13 & IY-12 Output Breaker Tripping Open + (19:35:58, 12 December 2024)
- ML20128C291 + (19:35:59, 12 December 2024)
- ML20128C290 + (19:35:59, 12 December 2024)
- ML20128C287 + (19:36:01, 12 December 2024)
- ML20128C286 + (19:36:02, 12 December 2024)
- ML20128C285 + (19:36:03, 12 December 2024)
- ML20128C284 + (19:36:04, 12 December 2024)
- IR 05000528/1992031 + (19:36:19, 12 December 2024)
- ML20128C279 + (19:36:20, 12 December 2024)
- ML20128C275 + (19:36:21, 12 December 2024)
- ML20128C276 + (19:36:21, 12 December 2024)
- ML20128C274 + (19:36:22, 12 December 2024)
- ML20128C272 + (19:36:24, 12 December 2024)
- ML20128C270 + (19:36:27, 12 December 2024)
- ML20128C267 + (19:36:28, 12 December 2024)
- ML20128C268 + (19:36:28, 12 December 2024)
- ML20128C265 + (19:36:29, 12 December 2024)
- ML20128C264 + (19:36:30, 12 December 2024)
- ML20128C262 + (19:36:30, 12 December 2024)
- B11511, Agrees That SER Open Item 13 Re Compliance w/NUREG-0737,Item II.G.1 Concerning Power Supply Requirements for PORVs & Associated Block Valves,Closed.Porv Train Arrangement for Valves Will Be Changed,Per 850326 Meeting + (19:36:31, 12 December 2024)
- ML20128C260 + (19:36:32, 12 December 2024)
- ML20128C256 + (19:36:33, 12 December 2024)
- ML20128C255 + (19:36:33, 12 December 2024)
- ML20128C254 + (19:36:34, 12 December 2024)
- ML20128C252 + (19:36:35, 12 December 2024)
- ML20128C251 + (19:36:35, 12 December 2024)
- ML20128C249 + (19:36:36, 12 December 2024)
- ML20128C247 + (19:36:37, 12 December 2024)
- B14284, Forwards Addl Bases & Final Justification for Containment Piping Penetrations Judged to Deviate from App A,Gdc 54-57 & Seismic Criteria of GDC 2,per SEP Topic VI-4, Containment Isolation Sys + (19:36:38, 12 December 2024)
- ML20128C244 + (19:36:39, 12 December 2024)