ML20128C312
| ML20128C312 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 01/29/1993 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Joshua Wilson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19303F259 | List: |
| References | |
| MFN-014-93, MFN-14-93, NUDOCS 9302030380 | |
| Download: ML20128C312 (1) | |
Text
3:
)
r
{.
GE Nuclear Energy
~
o w a u a ccx w 175 new hse &n a LA 95??$
January 29,1993 MFN No. 014-93 Docket No. STN 52-001 1
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Jerry N. Wih.on, Acting Director Standardization Project Dir;ctorate
Subject:
Submittal of Amendmr at 25, Proprietary Information, to GE's AllWR SSAR
Reference:
Submittal of Amendment 25, to GE's ABWR SSAR, MFN No.
013-93, dated Janua y 29,1993 Enclosed are thirty-four copies of a selected section Chapter 4, Reactor, of the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR).
i The modification to the chapter above provides close out of DFSER confirmatory item 4.2 21 The modifications being implemented in Section 4C pages are identified on the attached Page Change Instruction (s).
)
Changes to the section contains information that is designated as General Electric Company proprietary information. These pages are primarily corrections or additions to earlier proprietary submittals and the proprietary affidavits under which they were originally issued are applicable to these pages.
Sincerely,
' )
P. W. A arriott, Manager Safety & Licensing MC-444, (408)925-6948 cc:
R. C. Berglund (GE)
T. E. Murley (NRC)
D. M. Crutchfield (NRC)
D. J. McGoff (DOE)
F. J. Miraglia, Jr.
(NRC)
C. Poslusny, Jr.
(NRC)
K. E. Stahlkopf (EPRI)
N. D. Fietcher (DOE)
- F. A. Ross (DOE) 030U09 f' f 0 o
9302030380-930129 l
b' PDR ADOCK 05200001 b)
A pon
\\
k,
~l