E ENTERGY IE"a '**" "'""*'
M q L A 7(E)/4
+-
Tra s04 739 67/4 R. F. Burski w..
kh - (J)? y 2fy W t"3.6 2 ) 3 W3F1-93-0112-A4.05 QA January 29, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No NPF-38 Waterford 3 Organization Change Gentlemen:
Entergy Operations, Inc. has recently restructured the Naterford 3 site organization.
This has necessitated a change to the War.erford 3 SES Emergency Plan.
Pursuant to 10CFR50, Appendix E, Section V, we are hcrewith inforning you of the resulting changes that will be required to the Emergency Plan.
t These changes do not decrease the offectiveness of the Emergency Plan-based on a 10CFR50.54(q) review.
Attached is a copy of the revisions to pages 5-2 and A-5-1A of the Emergency Plan indicating the changes that will be required.
These changes will be incorporated into the next revision of the Emergency Plan which is scheduled for issuance during the first quarter of 1993.
Should you have any questions, please contact C.J. Thomas at (504) 739-6531.
Very truly yours, wkt R.F. Burski Director, Nuclear Safety RFB/CJT/ssf Attachments cc:
J.L. Milhoan (NRC Region IV ), D.B. Spitzberg (NRC Region IV),
030051 0 L. Wigginton (NRC-NRR), R.B. McGehee, N.S. Reynolds, NRC Resident Inspectors Office D [k 9302030372 930129.
PDR ADOCK 05000392 r
PDR j
_c_-.
~
y T.
LWATERFORD 3'SES' EMERGENCY PIANI 5.1.1.1 (cont..)
The Plant' Organization is responsible for the;-
-day-to-day operation and~ maintenance associated with the Waterford 3 SES.- The Plant Organi-zation is headed by the General Manager Plant-Operations who'reporta_to thejVice President, Operations, Waterford-3.
5.1.1.2 Operations Plant; Support Groups The Engineering, Plant Modification-4 Construction, Site Support, Training and.
-l; Nuclear Safety Groups provide + support to thef Plant Organization and report to the Vice President, Operations,_Waterford 3.
The-Site I
Support Organization provides specialized support to. plant cperations. _This support
~
includes such areas as amergency planning, cost control, records manwyement, materials
[
management, purchasin;;sz contracts and special---
project:s. The Director Site Support-heads up-the Site Support Organization. The Director Site Support reports to the Vice President, Operations, Waterford 3.
Nuclear Safety provides licensing;and Quality-Assurance support to plant-operations. 'The.
organization includes a Safety Review' group,-
Quality Assurance, a Nuclear Licensing and a; Policy and: Directives group. The Director Nuclear Safety heads up this organization. The' Director Nuclear Safety reports to_the Vice-president, Operations,'Waterford 3.
5.1.2 Emergency organizations Response to an abnormal or emergency situation occurs-in 4
a three phase process. 'The-initial'immediate actions-in.;
response to an emergency are the responsibility;ofs the Onshift Emergency Organization.;In support of the Onshift Emergency Organization,-the Onsite Emergency, Organization -
is-activated to aid and support the activities-initiated-by the Onshift Emergency-Organization. The activation of additional Onsite personnel-is in accordance with Table 5-1.
9302040049 930129 5-2 E*V-17
.PDR ADOCK'05000382' F
PDR y
v ~
e-
i
\\
W3 SES EMERGENCY PLAN P
FIGURE 5-1A ENTERGY OPERATIONS. INC. WATERFORD 3 ORGANIZATION tt!51ICrt 6 -
"MItf UICUUVt DTrICn I
Cuttr WIA& TIM Off1C11 I
VICE ntsIIort, OPERAMCSS.
VATBF2D 3 J
$1FtTT IIVIG CC2tCTTEE I
l I
I I
I-DIRECTOR PIMT GDUAL DHICTW MREC7JR 9$1FICATIM &
l MAED ll0CL&AA SITE TRADIM CMMUCTIN PLAJrf SAftTY SJPPMT PMAG12 1
amnas I
DDEC?2~
nantaIM txtacuCT PLAAKIna &
AIADIISTRATIW EaAGIR -
1 I
asm ttMxua ortsm PLAnsun 1:acumuTIm I
I l
I l
l
.l SECURM &
OpGATICIt3 &
MtDICE TECHNICE PLIJGIING E GUDAL 13PP@T l. IF/EEANCE 8AftTT RIVIN SUVICES.
SJtDULUG MANAGG MANAGER OfYICD MANAGM
- M&NAGtA I
I I
I I
I I
cenAncas nmouCs sxIrr almAus sTmns SUPOITTUDDrf SUPERDrttXDurf T100lICAL
- PROTECTION FIRI IMINtDING 1DVISOR3 STERINTUITIT PRC'!1CTIN Q2ISTR1 RUCLf2 MECH &f! CAL HU,'.TH AIK31STRATIM Plff3ICS aume 0P1R4133 EII'ILICE EANASTI LtGIRIEIM &
rarmMuct aC tvr IJtIltOS
$7Aff DGU11R3
_ _ _ Engineering matrixed to Site Vice President from Vice President, Engineering =
A-5-1A' REV. 17 a