Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129A882 + (17:12:19, 12 December 2024)
- ML20129A883 + (17:12:19, 12 December 2024)
- 05000250/LER-1985-013, :on 850502,during Scheduled Refueling Outage, Emergency Diesel Generator a Automatically Started.Caused by Incorrect Step in Procedure 3-OP-005 Used to Deenergize 4,160-volt Bus 3A.Procedures Changed + (17:12:22, 12 December 2024)
- ML20129A872 + (17:12:23, 12 December 2024)
- ML20129A873 + (17:12:23, 12 December 2024)
- 2CAN109604, Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One-Unit 2 + (17:12:24, 12 December 2024)
- ML20129A868 + (17:12:25, 12 December 2024)
- ML20129A867 + (17:12:25, 12 December 2024)
- ML20129A866 + (17:12:26, 12 December 2024)
- ML20129A865 + (17:12:27, 12 December 2024)
- ML20129A864 + (17:12:28, 12 December 2024)
- ML20129A863 + (17:12:28, 12 December 2024)
- 05000249/LER-1985-012-05, :on 850429,feedwater Check Valve 3-220-62A Observed to Leak 587.04 Scfh.W/Previous as Left Leakage, Total Leakage Exceeds Tech Spec Limit.Caused by Worn Pressure Seal Ring.Seal Ring Replaced + (17:12:30, 12 December 2024)
- IR 05000440/1985045 + (17:12:31, 12 December 2024)
- ML20129A860 + (17:12:32, 12 December 2024)
- ML20129A859 + (17:12:33, 12 December 2024)
- ML20129A858 + (17:12:34, 12 December 2024)
- ML20129A854 + (17:12:35, 12 December 2024)
- ML20129A857 + (17:12:35, 12 December 2024)
- ML20129A851 + (17:12:37, 12 December 2024)
- ML20129A850 + (17:12:38, 12 December 2024)
- ML20129A848 + (17:12:38, 12 December 2024)
- ML20129A847 + (17:12:39, 12 December 2024)
- ML20129A844 + (17:12:40, 12 December 2024)
- 05000220/LER-1985-007, :on 850424,automatic Initiation of Reactor Bldg Emergency Ventilation Sys Occurred.Caused by Technician Shorting Wire in Cable Connector to Sensor for Emergency Condensor Ventilation Monitor 121 + (17:12:42, 12 December 2024)
- ML20129A841 + (17:12:43, 12 December 2024)
- RBG-21004, Interim Deficiency Rept DR-290 Re Pressure Test for Charcoal Filtration Unit Ductwork.Next Rept Will Be Provided by 850531 + (17:12:44, 12 December 2024)
- 05000454/LER-1985-049, :on 850424,Train a Main Control Room Ventilation Sys Transferred to Makeup Mode of Operation. Cause of ESF Actuation Unknown.Ventilation Isolation Restored to Normal Operating Status + (17:12:46, 12 December 2024)
- ML20129A835 + (17:12:47, 12 December 2024)
- ML20129A836 + (17:12:47, 12 December 2024)
- 05000281/LER-1985-002, :on 850215,charging Pump Intermediate Seal Coolers Discovered Improperly Aligned.Caused by Personnel Error.Proper Intermediate Seal Cooler Placed in Svc. Personnel Reinstructed Re Following Procedures + (17:12:49, 12 December 2024)
- ML20129A831 + (17:12:50, 12 December 2024)
- ML20129A830 + (17:12:51, 12 December 2024)
- ML20129A826 + (17:12:52, 12 December 2024)
- ML20129A827 + (17:12:52, 12 December 2024)
- ML20129A824 + (17:12:53, 12 December 2024)
- ML20129A820 + (17:12:54, 12 December 2024)
- 05000397/LER-1985-028, :on 850426,unsealed Penetration in Reactor Bldg Fire Barrier Floor Discovered.Caused by Failure to Install Fire Seal During Const.Hourly Fire Watch Patrol Placed on Penetration Until Seal Installation Completed + (17:12:56, 12 December 2024)
- ML20129A815 + (17:12:57, 12 December 2024)
- 05000249/LER-1985-010-07, :on 850427,full Reactor Scram Initiated from Low Water Level W/Subsequent Group II & III Isolation.Cause Undetermined.Level Sensors 263-58 a & B to Be Replaced W/Analog Trip Units + (17:12:58, 12 December 2024)
- ML20129A811 + (17:12:59, 12 December 2024)
- ML20129A801 + (17:13:00, 12 December 2024)
- ML20129A800 + (17:13:01, 12 December 2024)
- IR 05000440/1985043 + (17:13:02, 12 December 2024)
- ML20129A789 + (17:13:04, 12 December 2024)
- ML20129A788 + (17:13:04, 12 December 2024)
- B11541, Forwards Response to Request for Addl Info Re Design Basis of Facility Spent Fuel Racks (SER Confirmatory Item 10) + (17:13:05, 12 December 2024)
- ML20129A783 + (17:13:06, 12 December 2024)
- B11591, Responds to NRC 850618 Request for Addl Info Re 850611 Proposed Rev to Section 3.4 of Tech Specs Re Pressure/Temp Limits.Revised Figures 3.4-1,3.4-8 & 3.4-9 Encl.Amend to License DPR-61 Still Required by 850720 + (17:13:07, 12 December 2024)
- ML20129A771 + (17:13:08, 12 December 2024)
- IR 05000267/1984032 + (17:13:16, 12 December 2024)