Forwards Correspondence Re Proposed Subpoena,Concerning Adequacy of Facility Const Per 841025 Request.Subpoenas Not Required at Present.V Noonan Should Be So Notified
ML20129A860
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/25/1984
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ippolito T
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20127B114 List:
References
FOIA-85-351 NUDOCS 8507270285
Download: ML20129A860 (2)


Text

.

I

/

h b

[

UNITED STATES

~

5 NUCLEAR REGULATORY COMMISSION

'}

wAsHwoTow.o.c. sones Deputy Executive Director For Regional Operations & Generic Requirements i

October 25, 1984 i

l Thomas A,Ippolito, Project Director Comanche Peak Technical Review Team Per our conversation of October 25, 1984, i

ittached is the correspondence related to the proposed. subpoena related to Comanche u,..-._

m Peak.

~

I understand that at the moment, subpoenas are not required and you will pass this on

~

j to Vinc' Noonan for future reference.

4 7

.J v3

~.

2.

e :.

.?

s.

. ag

a...

Vic Stello, Jr.

f

Enclosure:

Subpoena for Mr. Charles Atchison f.

MF Stello fm Ippolite 9/13/84 Proposed Memo to com fm Dircks l-MF VS tm Collins R-IV, 9/7/84 Q

  • E.[- -

Original Subpoena 50-445&446

-.3...

.c.

M:. *,

h I

Yk:

'i y

h f

l 8507270285 850610 PDR FOIA CARDE85-351 PDR

Unity 6tates :sf Acerica i

~

NUCLEAR REGULATORY COMMISSION C

SUBPOENA'AD TESTIFICANDUM AND DUCES TECUM in the : matter of:

l' Tcxas Utilities Cenerating. Company W bCKET NO;a 50-445 (Comanche Peak Steam Electric.

50-446,,

Station, Units 1.and 2)

TO i I

C Charles Atchison P. O. Box 9.01 Aslo, Texas 76020 (By Registered Mail.. Return. Receipt Requested) at NRC/ Region IV, Parkvey YOU ARE HEREBY COMMANDED to appear Central Plaza Building. 611 Ryan Plaza Drive Suite 1000 in the city of Arlington, Texas 76011 on the 20th day of September 1984 at 1:00 o? clock p.m.

i te prcvide NRC' Comanche Peak Technical Review Team with~ sworn testimony Reporter regarding the adequacy of the construction of before a Court the Comanche Peak Steam Electric Staticci and to bring with yo;,r and make.

available for inspection and copying any-sud all' records in your possessien, including but not limited. to documents and. logs,! concerning the adequacy of such <:enstruction.

,. s.

For the Nuclear Regulate:y Cc::.issicn John T. Collins,: Regional Administrator Iv 19 ATTOILNEY FoR _E"#iUU U.S. Nuclear Regulatory Cots.is sion 8

60-8271

,E i

On Inotion made promatly, and in any event at or before thMpecifihd.in the subpoena i

' for compliance by t.de person..to whom' the: subpoena is directed, and on notice to the party at whose instance the. subpoena was, issued, the torxnission may (1) qpash.or modify the t subpoena if it is unreasonable 'or requires evidence not relevant.to any matter in issue, h ld

, or (2) condition denial of the motion on justrand. reasonable tenns. :Such motion s, ou :

be directed to the Secretary of the Commission, Washington, D.C. 20555.'

p

-