Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129B473 + (17:04:57, 12 December 2024)
- ML20129B469 + (17:04:58, 12 December 2024)
- IR 05000454/1985029 + (17:04:59, 12 December 2024)
- 2CAN058505, Forwards Description of Missed Surveillances Re Inservice Testing Program for Check Valve,Per 850408 Agreement.Review Indicates No Reduction of Safety During Cycle 4 Operation + (17:05:00, 12 December 2024)
- ML20129B461 + (17:05:01, 12 December 2024)
- ML20129B462 + (17:05:01, 12 December 2024)
- ML20129B460 + (17:05:02, 12 December 2024)
- ML20129B455 + (17:05:14, 12 December 2024)
- IR 05000373/1996009 + (17:05:14, 12 December 2024)
- IR 05000309/1985009 + (17:05:17, 12 December 2024)
- RBG-20961, Interim Deficiency Rept DR-295 Re AKD-6 480-volt Switchgear Supplied by Ge.Next Rept Will Be Submitted by 850530 + (17:05:18, 12 December 2024)
- ML20129B446 + (17:05:18, 12 December 2024)
- ML20129B444 + (17:05:19, 12 December 2024)
- ML20129B441 + (17:05:23, 12 December 2024)
- ML20129B440 + (17:05:23, 12 December 2024)
- ML20129B438 + (17:05:24, 12 December 2024)
- 05000454/LER-1985-048, :on 850424,radiation Monitor OPR32J in Main Control Room Outside Air Intake a Went Into Interlock Mode, Causing Train a of Ventilation Sys to Transfer to ESF Configuration.Caused by Dirty Filter + (17:05:26, 12 December 2024)
- ML20129B436 + (17:05:30, 12 December 2024)
- ML20129B435 + (17:05:34, 12 December 2024)
- ML20129B434 + (17:05:34, 12 December 2024)
- ML20129B430 + (17:05:38, 12 December 2024)
- 05000388/LER-1985-015-01, :on 850421,spray Pond Bypass Valve HV-01222A Did Not Automatically Open When Emergency Svc Water Pump a Started.Caused by Two Open Sliding States Link Terminal Blocks in Relay Panel.Links Evaluated + (17:05:41, 12 December 2024)
- ML20129B427 + (17:05:42, 12 December 2024)
- ML20129B426 + (17:05:43, 12 December 2024)
- ML20129B424 + (17:05:44, 12 December 2024)
- ML20129B423 + (17:05:45, 12 December 2024)
- ML20129B420 + (17:05:49, 12 December 2024)
- ML20129B419 + (17:05:50, 12 December 2024)
- ML20129B418 + (17:05:51, 12 December 2024)
- IR 05000458/1985045 + (17:05:52, 12 December 2024)
- ML20129B415 + (17:05:53, 12 December 2024)
- ML20129B413 + (17:05:54, 12 December 2024)
- ML20129B411 + (17:05:55, 12 December 2024)
- 05000325/LER-1985-022, :on 850502,primary Containment Group 6 & Reactor Bldg Ventilation Sys Isolated Due to Trouble Start Control Relay CR-4 Catching Fire.Caused by Relay Coil Insulation Breakdown.Relays Inspected + (17:05:57, 12 December 2024)
- ML20129B408 + (17:06:01, 12 December 2024)
- IR 05000317/1985003 + (17:07:58, 12 December 2024)
- 05000373/LER-1985-040-01, :on 850423 & 0505 Jammed Chemcassette Tape in Ammonia Detector B of Train a of Control Room/Auxiliary Electrical Equipment Room HVAC Triggered Alarms for High Chlorine/Ammonia Concentration + (17:08:00, 12 December 2024)
- ML20129B405 + (17:08:01, 12 December 2024)
- ML20129B401 + (17:08:02, 12 December 2024)
- ML20129B403 + (17:08:02, 12 December 2024)
- ML20129B398 + (17:08:03, 12 December 2024)
- ML20129B400 + (17:08:03, 12 December 2024)
- ML20129B396 + (17:08:04, 12 December 2024)
- 3F1096-07, Forwards Response to Violations Noted in Insp Rept 50-302/96-08.Corrective Actions:Addl Actions Added to Pr Tracking Database & Dispositioned or Repaired + (17:08:05, 12 December 2024)
- ML20129B395 + (17:08:05, 12 December 2024)
- ML20129B392 + (17:08:06, 12 December 2024)
- ML20129B390 + (17:08:07, 12 December 2024)
- ML20129B391 + (17:08:07, 12 December 2024)
- E000-96-017, Forwards Response to Violations Noted in Insp Rept 50-289/96-05.Corrective Actions:Util Met W/Nrc on 960722 to Discuss NRC Insp Findings & Commitments Re Addl Work to Support NRC Closure of GL 89-10 MOV Program + (17:08:08, 12 December 2024)
- ML20129B385 + (17:08:09, 12 December 2024)
- RC-96-0250, Forwards Response to Violations Noted in NRC Insp Rept 50-395/96-09.Corrective Actions:B Train Battery Taken Off of Equalize Charge & Weekly Test Completed W/Satisfactory Results,Upon Discovery of Event + (17:08:09, 12 December 2024)