Confirms Plan to Conduct 960926 Enforcement Conference at Region III Ofc in Lisle,Il,To Discuss Two Apparent App R Violations That Resulted in Conditions Which Were Beyond Design Basis of Plant
ML20129B398
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/13/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wookd J
CENTERIOR ENERGY
References
NUDOCS 9609230025
Download: ML20129B398 (1)


Text

- - - -

1 l

September 13, 1996

)

l Mr. John K. Wood Vice President - Nuclear Davis-Besse Nuclear Power Station Centerior Service Company 550I North State - Route 2 Oak Harbor, OH 43449 Derf Mr. Wood:

This letter confirms our plans to have an Enforcement Conference at 10:00 6.m. on September 26, 1996, at the Region III Office in Lisle, Illinois.

The purpose of this meeting is to discuss two apparent Appendix R violations i

that resulted in conditions that were beyond the design basis of the plant.

This meeting will be open to the public.

Sincerely, original signed by H. B. Clayton/br Geoffrey E. Grant, Director Division of Reactor Safety Docket No. 50-346 cc:

John P. Stetz, Senior l

Vice President - Nuclear l

J. H. Lash, Plant Manager i

J. L. Freels, Manager, Regulatory Affairs State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio Public Utilities Commission l

Distribution:

Docket File DRS A. B. Beach, RIII PUBLIC IE-01 RIII PRR Enf. Coordinator, RIII OC/LFDCB SRI, Davis-Besse E-Mail CAAl DRP LPM, NRR W. L. Axelson, RIII DOCUM g g.,.ENT NAME,:

... \\.DRS\\D..AV.09126.DRS G:

......i..

. c. c.,,..

..i s...f.

i c. c.,,...... f i OFFICE RIII d

RIII C

RIII 6

NAME DSchrum:nk RGardner/flh HClayton[GGrant DATE 09/ O 96 09/ /3 /96 09//5 /96

/

0FFICIAL RECORD COPY 9609230025 960913

~