ML20129B398
| ML20129B398 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/13/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wookd J CENTERIOR ENERGY |
| References | |
| NUDOCS 9609230025 | |
| Download: ML20129B398 (1) | |
Text
- - - -
1 l
September 13, 1996
)
l Mr. John K. Wood Vice President - Nuclear Davis-Besse Nuclear Power Station Centerior Service Company 550I North State - Route 2 Oak Harbor, OH 43449 Derf Mr. Wood:
This letter confirms our plans to have an Enforcement Conference at 10:00 6.m. on September 26, 1996, at the Region III Office in Lisle, Illinois.
The purpose of this meeting is to discuss two apparent Appendix R violations i
that resulted in conditions that were beyond the design basis of the plant.
This meeting will be open to the public.
Sincerely, original signed by H. B. Clayton/br Geoffrey E. Grant, Director Division of Reactor Safety Docket No. 50-346 cc:
John P. Stetz, Senior l
Vice President - Nuclear l
J. H. Lash, Plant Manager i
J. L. Freels, Manager, Regulatory Affairs State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio Public Utilities Commission l
Distribution:
Docket File DRS A. B. Beach, RIII PUBLIC IE-01 RIII PRR Enf. Coordinator, RIII OC/LFDCB SRI, Davis-Besse E-Mail CAAl DRP LPM, NRR W. L. Axelson, RIII DOCUM g g.,.ENT NAME,:
... \\.DRS\\D..AV.09126.DRS G:
......i..
. c. c.,,..
..i s...f.
i c. c.,,...... f i OFFICE RIII d
RIII C
RIII 6
NAME DSchrum:nk RGardner/flh HClayton[GGrant DATE 09/ O 96 09/ /3 /96 09//5 /96
/
0FFICIAL RECORD COPY 9609230025 960913
~
PDR ADOCK 05000346 G
_ __ _ J