Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000254/1985015 + (15:08:30, 12 December 2024)
- ML20132C732 + (15:08:32, 12 December 2024)
- 05000245/LER-1996-051-01, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis + (15:08:35, 12 December 2024)
- ML20132C728 + (15:08:36, 12 December 2024)
- IR 05000282/1985015 + (15:08:43, 12 December 2024)
- ML20132C726 + (15:08:43, 12 December 2024)
- PNO-I-85-070, on 850925,RHR Loop B & HPCI Inoperable.Caused by Sheared Motor Mounting Bolts on Motor Operator.Piping Sys Integrity Unaffected + (15:08:44, 12 December 2024)
- ML20132C723 + (15:08:45, 12 December 2024)
- ML20132C722 + (15:08:46, 12 December 2024)
- ML20132C721 + (15:08:46, 12 December 2024)
- ML20132C720 + (15:08:47, 12 December 2024)
- ML20132C719 + (15:08:48, 12 December 2024)
- ML20132C718 + (15:08:48, 12 December 2024)
- ML20132C717 + (15:08:49, 12 December 2024)
- IR 05000324/1985029 + (15:08:50, 12 December 2024)
- ML20132C715 + (15:08:51, 12 December 2024)
- ML20132C713 + (15:08:52, 12 December 2024)
- IR 05000625/2008030 + (15:08:53, 12 December 2024)
- ML20132C710 + (15:08:54, 12 December 2024)
- ML20132C711 + (15:08:54, 12 December 2024)
- ML20132C708 + (15:08:55, 12 December 2024)
- ML20132C706 + (15:08:56, 12 December 2024)
- ML20132C703 + (15:08:57, 12 December 2024)
- ML20132C699 + (15:08:58, 12 December 2024)
- ML20132C698 + (15:08:59, 12 December 2024)
- ML20132C697 + (15:08:59, 12 December 2024)
- 3F0985-14, Advises That Response to 850826 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design, Will Be Provided by 851127 + (15:09:01, 12 December 2024)
- ML20132C695 + (15:09:01, 12 December 2024)
- ML20132C693 + (15:09:02, 12 December 2024)
- ML20132C691 + (15:09:02, 12 December 2024)
- ML20132C690 + (15:09:03, 12 December 2024)
- ML20132C688 + (15:09:06, 12 December 2024)
- ML20132C686 + (15:09:07, 12 December 2024)
- ML20132C679 + (15:09:08, 12 December 2024)
- ML20132C683 + (15:09:08, 12 December 2024)
- ML20132C677 + (15:09:09, 12 December 2024)
- ML20132C674 + (15:09:10, 12 December 2024)
- 05000245/LER-1996-031-01, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 + (15:09:12, 12 December 2024)
- ML20132C672 + (15:09:13, 12 December 2024)
- PNO-V-85-059, updating PNO-V-85-058:on 850912,reactor Trip & Safety Injection Occurred.Caused by Open Atmospheric Dump Valve,Open Main Steam Line Low Point Drain Valves & Use of Auxiliary Feedwater Pump + (15:09:14, 12 December 2024)
- ML20132C667 + (15:09:15, 12 December 2024)
- ML20132C668 + (15:09:15, 12 December 2024)
- ML20132C666 + (15:09:16, 12 December 2024)
- ML20132C665 + (15:09:19, 12 December 2024)
- ML20132C661 + (15:09:20, 12 December 2024)
- ML20132C660 + (15:09:20, 12 December 2024)
- ML20132C659 + (15:09:21, 12 December 2024)
- ML20132C657 + (15:09:22, 12 December 2024)
- SNRC-1194, Provides Clarification Re Interpretation of 5% Rated Thermal Power on steady-state Basis.Potential for Momentary Power Spikes Above 5% steady-state Limit Do Not Constitute Violation of OL + (15:09:22, 12 December 2024)
- ML20132C656 + (15:09:23, 12 December 2024)
- ML20132C655 + (15:09:24, 12 December 2024)
- ML20132C654 + (15:09:24, 12 December 2024)