ML20132C674
| ML20132C674 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 09/23/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20132C680 | List: |
| References | |
| NUDOCS 8509270114 | |
| Download: ML20132C674 (1) | |
See also: IR 05000324/1985029
Text
-.
,
/e//su)
. . .
SEP 2 3 B7f
Caroli,naJewer and Light Company
ATTN: }Kr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NOS. 50-325/85-29 AND 50-324/85-29
On August 26-30, 1985, NRC inspected activities authorized by NRC Operating
License Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were i,ientified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-325/85-29
and 50-324/85-29
,cpw/ encl :
i
W. W. Howe, Vice President
.
pfunswick Nuclear Project
'
.LV. R. Dietz, Plant General Manager
hdc w/ encl:
4 RC Resident Inspector
Document Control Desk
State of North Carolina
,
4 K\\
y
- ht
D aid
[v4 Jp
ARHerdt
M
f
I
9/ r/85
9////85
9ft/85
9/ /85
og
8509270114 850923
ADOCK 05000324
g
G
s
j
- -
-
- -
-
- -
-
- -