SEP 2 01985

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

l

Subject:

Inspection Report No. 50-412/85-14

This refers to your letter dated September 6, 1985, in response to our letter

dated August 6, 1985.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

Your cooperation with us is appreciated.

Sincerely,

Origir.nl Signed By:

JacqueP.Durr

Stewart D. Ebneter, Director

Division of Reactor Safety

cc:

E. J. Woolever, Vice President, Nuclear Construction Division

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

,

R. E. Martin, Manager, Engineering

E. F. Kurtz, Jr., Manager, Regulatory Affairs

P. RaySircar, Stone and Webstar Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

dol

,y

0FFICIAL RECORD COPY

RL BV 2 85-14 - 0001.0.0

09/17/85

8509270116 850920

PDR

ADOCK 05000412

G

PDR

. . = _ .

.

.

. -

..

--

-

. - -

'

.

.-

!

Duquesne Light Company

2

bcc:

Region I Docket Room (with concurrences)

!

Senior Operations Officer (w/o enc 1)

!-

DRP Section Chief

T. Rebelowski, SRI, Millstone 3

'

W. Troskoski, SRI, BV-1

B. Singh, LPM, NRR

4

RI:DRS

RI:DRS

RI:DRS

ggarty/djh

i

ins

Durr

9/)p85

9//y85

9/i'f/85

0FFICIAL RECORD COPY

RL BV 2 85.-14 - 0002.0.0

09/17/85

.

_ _ _ - _

'

.

.

hl,

'

'Af

Duquesne U@it

2g-g32e,

1,,,,,,,l:;2;;g;;;;

u.ci.., co . oci...

.... ,

Ni2a"O*l'is*2$s*"'#"*

september 6, 1985

"

United States Nuclear Regulatory Commission

Region I

631 Park Avenue

King of Prussia, PA 19406

ATTENTION:

Mr. Richard W. Starostecki

Division of Project and Resident Prograns

SUBJECT:

Beaver Valley Power Station - Unit No. 2

Docket No. 50-412

USNRC IE Inspection Report No. 50-412/85-14

REFERENCE:

NRC Inspection 50-412/85-14, dated August 6, 1985

Gentlemen:

This is in response to the Notice of Violation cited in Inspection

No. 50-412/85-14 and listed in Appendix A (Notice of Violation) attached to

your letter to Mr. J. J. Carey, dated August 6, 1985.

Notice of Violation 85-14-01:

" Ins _ufficient _ Clearance Around Welds - PSI

Related"

Violation:

10CFR50, Appendix B, Criterion V, requires that a;tivities affecting

quality shall be prescribed by documented instructions, procedures ...

and shall be accompli shed in accordance wi th t1ese instructions,

procedures, or drawings.

Specification 2BVS-920 requires that minimum loc.gitudinal clear access

equal to 4 Tn

+2"

be provided for welds which require surf ace or

volumetric inservice inspection.

Contrary to the above, during the period from June 24-28,1985, pipe

support 2RCS-PSSP007X, reactor building elevation 783' 7-1/2", and pipe

support 2RCS-PSR-036, reactor building elevation 783' 6" were found to

obstruct 6" diameter shop weld A, line 2RCS-006-107-1, and 3" diameter

weld 2RCS-109-F500, respectively, such that the required longitudinal

minimun clear access was not provided for the welds.

Response:

As cited in this violation, minimum specified longitudinal access to

the subject welds was not maintained when pipe supports 2RCS-PSSP-007X

and 2RCS-PSR-036 were installed.

FCP-208, " Control of Fabrication and

duF

' h70 71

-

-

~

.

'

United States Nuclear Regulatory Commission

Mr. Richard W. Starostecki

USNRC IE Inspection Report No. 50-412/85-14

Page 2

Installation Processes for Piping Systems," identifies access require-

ments and the need to obtain Engineering resolution when access could

not be maintained.

A review of FCP-207, " Component Support Control,"

indicated that this FCP had not identified such requirements.

To

strengthen DLC's progran, FCP-207 will be revised to include these

requirements / procedures, and necessary training of personnel will be

completed by September 30, 1985.

The FCP-207 revision, 2BVS-920

revision, and SQC Inspection Plans 7.2 and 7.3.1, which have already

been revised to change inspection attributes for minimum clear access

to welds, should prevent recurrence of any similar problem.

In addi-

tion, the preservice inspection plan will include an appropriate attri-

bute to assure that the spatial envelope is acceptable for each weld

requiring inspection prior to performing the initial PSI.

In regards to the related Unresolved Item 85-14-02, the project is

evaluating existing procedures to determine what additional measures

are required to ensure all discipline installation activities are

completed without adversely affecting the weld accessibility envelope.

The results of this evaluation will be made available to the NRC Senior

Resident Inspector upon request.

DUQUESNE LIGHT COMPANY

By

.

J. 'J.Marey

Vice President

SDH/wjs

cc:

Mr. J. M. Taylor, Director (3)

Mr. B. K. Singh, Project Manager

Mr. G. Walton, NRC Resident Inspector

INPO Records Center

NRC Document Control Desk

SUBSCRIBED AND SW0

TO B ORE ME THIS

g DAY OF

gdf .

( _,1985.

Onh $ dad $W

Notary Public

ANITA ELAINE REITER, NOTARY PUBLIC

ROBINSON TOWNSHIP, ALLEGHENY COUNTY

MY COMf.ilSS!ON EXP!RES OCTOBER 20,1986

s

,

-

,

, , . - - - - -

--

- - - - -

--.,e

.

, - - - . . .-- . ,

- - . - - - , , - .,

. _ _

'

United States Nuclear Regulatory Cominission

Mr. Richard W. Starostecki

USNRC IE Inspection Report No. 50-412/85-14

Page 3

COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

// [ f , before me, a

On this

/

day of

_

,

,

Notary Public in and for said Commonwealth and County, personally appeared

,

J.

J. Carey, who being duly sworn, deposed and said that (1) he is Vice

President of Duquesne Light, (2) he is duly authorized to execute and file

the foregoing Submittal on behalf of said Company, and (3) tne statenents set

forth in the Submittal are true and correct to the best of his knowledge.

YxW

l

L

f

"

_.. Notary Public

'

ANITA ELAINE REITER, NOTARY PUBLIO

ROBINSON TOWNSHIP, ALLEGHENY COUNTY

MY COMMISSION EX :RES COTOBER 20,1985

4

. , . - _ _ _ , .

. . . . . , _ .

.

_

.. _ _ _ - _ , . - - _ __

_ _ _ .

_ _ _ _ ,

-.m,

m

-, _ ,

-

-.