Text
.
.
SEP 2 01985
Docket No. 50-412
Duquesne Light Company
ATTN: Mr. J. J. Carey
Vice President
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania 15077
Gentlemen:
l
Subject:
Inspection Report No. 50-412/85-14
This refers to your letter dated September 6, 1985, in response to our letter
dated August 6, 1985.
Thank you for informing us of the corrective and preventive actions documented
in your letter. These actions will be examined during a future inspection of
your licensed program.
Your cooperation with us is appreciated.
Sincerely,
Origir.nl Signed By:
JacqueP.Durr
Stewart D. Ebneter, Director
Division of Reactor Safety
cc:
E. J. Woolever, Vice President, Nuclear Construction Division
E. Ewing, Quality Assurance Manager
R. J. Swiderski, Manager, Startup Group
,
R. E. Martin, Manager, Engineering
E. F. Kurtz, Jr., Manager, Regulatory Affairs
P. RaySircar, Stone and Webstar Engineering Corporation
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
dol
,y
0FFICIAL RECORD COPY
RL BV 2 85-14 - 0001.0.0
09/17/85
8509270116 850920
ADOCK 05000412
G
. . = _ .
.
.
. -
..
--
-
. - -
'
.
.-
!
Duquesne Light Company
2
bcc:
Region I Docket Room (with concurrences)
!
Senior Operations Officer (w/o enc 1)
!-
DRP Section Chief
T. Rebelowski, SRI, Millstone 3
'
W. Troskoski, SRI, BV-1
B. Singh, LPM, NRR
4
RI:DRS
RI:DRS
RI:DRS
ggarty/djh
i
ins
Durr
9/)p85
9//y85
9/i'f/85
0FFICIAL RECORD COPY
RL BV 2 85.-14 - 0002.0.0
09/17/85
.
_ _ _ - _
'
.
.
hl,
'
'Af
Duquesne U@it
1,,,,,,,l:;2;;g;;;;
u.ci.., co . oci...
.... ,
Ni2a"O*l'is*2$s*"'#"*
september 6, 1985
"
United States Nuclear Regulatory Commission
Region I
631 Park Avenue
King of Prussia, PA 19406
ATTENTION:
Mr. Richard W. Starostecki
Division of Project and Resident Prograns
SUBJECT:
Beaver Valley Power Station - Unit No. 2
Docket No. 50-412
USNRC IE Inspection Report No. 50-412/85-14
REFERENCE:
NRC Inspection 50-412/85-14, dated August 6, 1985
Gentlemen:
This is in response to the Notice of Violation cited in Inspection
No. 50-412/85-14 and listed in Appendix A (Notice of Violation) attached to
your letter to Mr. J. J. Carey, dated August 6, 1985.
Notice of Violation 85-14-01:
" Ins _ufficient _ Clearance Around Welds - PSI
Related"
Violation:
10CFR50, Appendix B, Criterion V, requires that a;tivities affecting
quality shall be prescribed by documented instructions, procedures ...
and shall be accompli shed in accordance wi th t1ese instructions,
procedures, or drawings.
Specification 2BVS-920 requires that minimum loc.gitudinal clear access
equal to 4 Tn
+2"
be provided for welds which require surf ace or
volumetric inservice inspection.
Contrary to the above, during the period from June 24-28,1985, pipe
support 2RCS-PSSP007X, reactor building elevation 783' 7-1/2", and pipe
support 2RCS-PSR-036, reactor building elevation 783' 6" were found to
obstruct 6" diameter shop weld A, line 2RCS-006-107-1, and 3" diameter
weld 2RCS-109-F500, respectively, such that the required longitudinal
minimun clear access was not provided for the welds.
Response:
As cited in this violation, minimum specified longitudinal access to
the subject welds was not maintained when pipe supports 2RCS-PSSP-007X
and 2RCS-PSR-036 were installed.
FCP-208, " Control of Fabrication and
duF
' h70 71
-
-
~
.
'
United States Nuclear Regulatory Commission
Mr. Richard W. Starostecki
USNRC IE Inspection Report No. 50-412/85-14
Page 2
Installation Processes for Piping Systems," identifies access require-
ments and the need to obtain Engineering resolution when access could
not be maintained.
A review of FCP-207, " Component Support Control,"
indicated that this FCP had not identified such requirements.
To
strengthen DLC's progran, FCP-207 will be revised to include these
requirements / procedures, and necessary training of personnel will be
completed by September 30, 1985.
The FCP-207 revision, 2BVS-920
revision, and SQC Inspection Plans 7.2 and 7.3.1, which have already
been revised to change inspection attributes for minimum clear access
to welds, should prevent recurrence of any similar problem.
In addi-
tion, the preservice inspection plan will include an appropriate attri-
bute to assure that the spatial envelope is acceptable for each weld
requiring inspection prior to performing the initial PSI.
In regards to the related Unresolved Item 85-14-02, the project is
evaluating existing procedures to determine what additional measures
are required to ensure all discipline installation activities are
completed without adversely affecting the weld accessibility envelope.
The results of this evaluation will be made available to the NRC Senior
Resident Inspector upon request.
DUQUESNE LIGHT COMPANY
By
.
J. 'J.Marey
Vice President
SDH/wjs
cc:
Mr. J. M. Taylor, Director (3)
Mr. B. K. Singh, Project Manager
Mr. G. Walton, NRC Resident Inspector
INPO Records Center
NRC Document Control Desk
SUBSCRIBED AND SW0
TO B ORE ME THIS
g DAY OF
gdf .
( _,1985.
Onh $ dad $W
Notary Public
ANITA ELAINE REITER, NOTARY PUBLIC
ROBINSON TOWNSHIP, ALLEGHENY COUNTY
MY COMf.ilSS!ON EXP!RES OCTOBER 20,1986
s
,
-
,
, , . - - - - -
--
- - - - -
--.,e
.
, - - - . . .-- . ,
- - . - - - , , - .,
. _ _
'
United States Nuclear Regulatory Cominission
Mr. Richard W. Starostecki
USNRC IE Inspection Report No. 50-412/85-14
Page 3
COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF ALLEGHENY
)
// [ f , before me, a
On this
/
day of
_
,
,
Notary Public in and for said Commonwealth and County, personally appeared
,
J.
J. Carey, who being duly sworn, deposed and said that (1) he is Vice
President of Duquesne Light, (2) he is duly authorized to execute and file
the foregoing Submittal on behalf of said Company, and (3) tne statenents set
forth in the Submittal are true and correct to the best of his knowledge.
YxW
l
L
f
"
_.. Notary Public
'
ANITA ELAINE REITER, NOTARY PUBLIO
ROBINSON TOWNSHIP, ALLEGHENY COUNTY
MY COMMISSION EX :RES COTOBER 20,1985
4
. , . - _ _ _ , .
. . . . . , _ .
.
_
.. _ _ _ - _ , . - - _ __
_ _ _ .
_ _ _ _ ,
-.m,
m
-, _ ,
-
-.