Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-97-002, on 970108,package Was Received from Syncor Intl Nuclear Pharmacy Which Exceeded DOT Regulatory Limits. Licensee Decontaminated Container & Used It for Return Shipment to Syncor Intl on 970109 + (13:42:05, 12 December 2024)
- ML20133E230 + (13:42:06, 12 December 2024)
- ML20133E228 + (13:42:07, 12 December 2024)
- ML20133E229 + (13:42:07, 12 December 2024)
- ML20133E227 + (13:42:08, 12 December 2024)
- ML20133E225 + (13:42:09, 12 December 2024)
- ML20133E226 + (13:42:09, 12 December 2024)
- RBG-21-914, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-29.Corrective Actions:Addl Samples of Welds Previously Accepted by Eight Inspectors Taken & Training Provided for Inspectors Performing Visual Weld Insps + (13:42:10, 12 December 2024)
- ML20133E223 + (13:42:11, 12 December 2024)
- U-600204, Interim Deficiency Rept 55-85-06 Re Internal Wiring & Workmanship Defects in vendor-supplied safety-related Electrical Equipment.Initially Reported on 850626.Next Rept Will Be Submitted within 90 Days + (13:42:11, 12 December 2024)
- ML20133E219 + (13:42:12, 12 December 2024)
- ML20133E218 + (13:42:13, 12 December 2024)
- 05000483/LER-1996-006, :on 961205,turbine Trip & Engineered Safety Features Actuations Occurred Due to B Steam Generator High Level.Turbine Generator Power Was Stabilized at 60 Mwe Until Feedwater Preheating Was Recovered + (13:42:15, 12 December 2024)
- ML20133E215 + (13:42:16, 12 December 2024)
- ML20133E214 + (13:42:16, 12 December 2024)
- ML20133E210 + (13:42:17, 12 December 2024)
- ML20133E211 + (13:42:17, 12 December 2024)
- ML20133E208 + (13:42:18, 12 December 2024)
- ML20133E206 + (13:42:19, 12 December 2024)
- ML20133E205 + (13:42:20, 12 December 2024)
- ML20133E201 + (13:42:20, 12 December 2024)
- ML20133E200 + (13:42:21, 12 December 2024)
- ML20133E198 + (13:42:22, 12 December 2024)
- ML20133E196 + (13:42:26, 12 December 2024)
- ML20133E195 + (13:42:26, 12 December 2024)
- ML20133E192 + (13:42:27, 12 December 2024)
- 05000374/LER-1985-022, :on 850510,while in Cold Shutdown,Intermediate Range Monitor C Spiked High,Initiating Full Scram Signal. Caused by Equipment Failure.Intermediate Range Monitor C Bypassed & Scram Reset + (13:42:30, 12 December 2024)
- ML20133E185 + (13:42:31, 12 December 2024)
- IR 05000458/1985029 + (13:42:33, 12 December 2024)
- ML20133E182 + (13:42:33, 12 December 2024)
- ML20133E178 + (13:42:35, 12 December 2024)
- ML20133E179 + (13:42:35, 12 December 2024)
- ML20133E175 + (13:42:36, 12 December 2024)
- ML20133E174 + (13:42:37, 12 December 2024)
- ML20133E172 + (13:42:37, 12 December 2024)
- ML20133E169 + (13:42:38, 12 December 2024)
- NLS8500194, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-16.Corrective Actions:Qa Instructions QAI-4,QAI-5 & QAI-10 Will Be Revised to Identify Proper Distribution & Contractor Will Rereview NDE Documentation + (13:42:38, 12 December 2024)
- ML20133E168 + (13:42:39, 12 December 2024)
- ML20133E167 + (13:42:40, 12 December 2024)
- ML20133E166 + (13:42:40, 12 December 2024)
- ML20133E164 + (13:42:41, 12 December 2024)
- IR 05000456/1985031 + (13:42:42, 12 December 2024)
- IR 05000298/1985016 + (13:42:43, 12 December 2024)
- ML20133E158 + (13:42:43, 12 December 2024)
- ML20133E157 + (13:42:45, 12 December 2024)
- ML20133E154 + (13:42:46, 12 December 2024)
- ML20133E155 + (13:42:46, 12 December 2024)
- IR 05000528/1985018 + (13:42:51, 12 December 2024)
- ML20133E149 + (13:42:52, 12 December 2024)
- 05000482/LER-1985-065, :on 850905,main Turbine Trip Caused Reactor Trip,Feedwater Isolation,Auxiliary Feedwater Actuation,Steam Generator Blowdown & Sample Isolation.Caused by Faulty Control Pump Discharge Relief Valve + (13:42:54, 12 December 2024)
- ML20133E147 + (13:42:55, 12 December 2024)