Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000389/1975002 + (10:55:47, 12 December 2024)
- ML20134A970 + (10:55:48, 12 December 2024)
- IR 05000416/1985036 + (10:55:50, 12 December 2024)
- ML20134A968 + (10:55:51, 12 December 2024)
- ML20134A966 + (10:55:52, 12 December 2024)
- ML20134A967 + (10:55:52, 12 December 2024)
- ML20134A965 + (10:55:53, 12 December 2024)
- IR 05000269/1985035 + (10:55:54, 12 December 2024)
- ML20134A962 + (10:55:55, 12 December 2024)
- ML20134A961 + (10:55:56, 12 December 2024)
- ML20134A959 + (10:55:57, 12 December 2024)
- ML20134A957 + (10:55:58, 12 December 2024)
- ML20134A958 + (10:55:58, 12 December 2024)
- ML20134A954 + (10:55:59, 12 December 2024)
- ML20134A953 + (10:56:00, 12 December 2024)
- ML20134A952 + (10:56:01, 12 December 2024)
- ML20134A951 + (10:56:02, 12 December 2024)
- ML20134A949 + (10:56:07, 12 December 2024)
- 05000315/LER-1985-032, :on 850710,inaccurate Procedures Re Auxiliary Bldg Continuous Release Alarm Setpoint (Tech Spec 4.3.3.10.1) Noted.Procedures Changed to Prohibit Setting Gaseous Alarm Setpoint to Uncalculated Value + (10:56:08, 12 December 2024)
- ML20134A946 + (10:56:10, 12 December 2024)
- ML20134A944 + (10:56:10, 12 December 2024)
- L-75-187, Requests Encl Portion of Insp Rept 50-389/75-01 Be Withheld from Public Disclosure.Previous Ltr Should Be Disregarded.W/O Encl + (10:56:11, 12 December 2024)
- 05000361/LER-1985-042, :on 850927,incorrect Naoh Density Value Used for Calibr of Level Transmitters Associated W/Spray Chemical Storage Tank.Caused by Errant Design Calculation.Design Calculations for safety-related Tank Reviewed + (10:56:14, 12 December 2024)
- ML20134A941 + (10:56:15, 12 December 2024)
- ML20134A940 + (10:56:16, 12 December 2024)
- IR 05000483/1985021 + (10:56:17, 12 December 2024)
- ML20134A936 + (10:56:18, 12 December 2024)
- 05000311/LER-1985-012, :on 850708,trip Occurred on lo-lo Water Level in Steam Generator 23.Caused by Lack of Coordination Between Operators & Supervisors in Control Room.Simulator Training Incorporated Into Operator Training + (10:56:23, 12 December 2024)
- ML20134A933 + (10:56:24, 12 December 2024)
- PNO-I-85-085, on 851106,fire Protection Deluge Sys in Cable Tunnel Automatically Actuated.Smoke Smelled at Scene.Sys Isolated After 10 Minutes of Operation.Visual Insp of Cable Tunnel Revealed No Apparent Damage + (10:56:25, 12 December 2024)
- IR 05000389/1975001 + (10:56:26, 12 December 2024)
- RBG-22554, Responds to WR Butler 851101 Request for Addl Info Re Emergency Procedures for Containment Venting.Info Will Be Provided by 860801 + (10:56:27, 12 December 2024)
- ML20134A929 + (10:56:27, 12 December 2024)
- ML20134A927 + (10:56:28, 12 December 2024)
- ML20134A920 + (10:56:32, 12 December 2024)
- ML20134A919 + (10:56:33, 12 December 2024)
- BSEP-97-0033, Submits Response to RAI Re Control Room Personnel Exposures Resulting from Postulated Main Steam Line Break Accident + (10:56:34, 12 December 2024)
- ML20134A918 + (10:56:34, 12 December 2024)
- ML20134A915 + (10:56:36, 12 December 2024)
- ML20134A912 + (10:56:37, 12 December 2024)
- ML20134A913 + (10:56:37, 12 December 2024)
- ML20134A911 + (10:56:38, 12 December 2024)
- ML20134A907 + (10:56:39, 12 December 2024)
- ML20134A906 + (10:56:40, 12 December 2024)
- ML20134A905 + (10:56:41, 12 December 2024)
- ML20134A904 + (10:56:41, 12 December 2024)
- ML20134A903 + (10:56:42, 12 December 2024)
- ML20134A902 + (10:56:43, 12 December 2024)
- ML20134A898 + (10:56:44, 12 December 2024)
- ML20134A894 + (10:56:45, 12 December 2024)
- ML20134A895 + (10:56:45, 12 December 2024)