Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134L575 + (08:48:47, 12 December 2024)
- PNO-I-85-062, on 850829,at 100% Power,Reactor Tripped & Safety Injection Occurred.Caused by Broken Pipe Fitting on Instrument Air Compressor Tank in Turbine Bldg.Pressurizer Pressure Restored to Normal + (08:48:47, 12 December 2024)
- ML20134L573 + (08:48:48, 12 December 2024)
- ML20134L570 + (08:48:49, 12 December 2024)
- B11666, Forwards Preliminary Summaries of Public Safety risk- Oriented Analyses of Listed Projects Being Evaluated in Integrated Safety Assessment Program + (08:48:50, 12 December 2024)
- ML20134L569 + (08:48:50, 12 December 2024)
- ML20134L567 + (08:48:52, 12 December 2024)
- ML20134L566 + (08:48:52, 12 December 2024)
- ML20134L565 + (08:48:53, 12 December 2024)
- 05000296/LER-1985-019-02, :on 850725,during Surveillance Testing on Reactor Bldg Ventilation Exhaust Radiation Monitors, Inadvertent Secondary Containment Isolation Occurred.Caused by Improper Volt Meter Hookup Techniques + (08:48:55, 12 December 2024)
- ML20134L562 + (08:48:56, 12 December 2024)
- ML20134L561 + (08:48:57, 12 December 2024)
- ML20134L560 + (08:48:58, 12 December 2024)
- ML20134L559 + (08:48:58, 12 December 2024)
- ML20134L558 + (08:48:59, 12 December 2024)
- ML20134L555 + (08:49:00, 12 December 2024)
- ML20134L557 + (08:49:00, 12 December 2024)
- ML20134L554 + (08:49:01, 12 December 2024)
- ML20134L553 + (08:49:02, 12 December 2024)
- ML20134L551 + (08:49:03, 12 December 2024)
- ML20134L547 + (08:49:04, 12 December 2024)
- ML20134L549 + (08:49:04, 12 December 2024)
- CLI-96-11, Order (CLI-96-11).* Denies Petition for Review Re Es Mcdaniel Challenge to Staff Rejection of Claim Concerning Written Exam to Become RO at Vogtle Electric Generating Plant.W/Certificate of Svc.Served on 961113 + (08:49:05, 12 December 2024)
- ML20134L541 + (08:49:06, 12 December 2024)
- ML20134L540 + (08:49:07, 12 December 2024)
- ML20134L539 + (08:49:07, 12 December 2024)
- ML20134L537 + (08:49:08, 12 December 2024)
- ML20134L536 + (08:49:08, 12 December 2024)
- ML20134L534 + (08:49:09, 12 December 2024)
- ML20134L529 + (08:49:10, 12 December 2024)
- ML20134L528 + (08:49:10, 12 December 2024)
- ML20134L525 + (08:49:11, 12 December 2024)
- 05000287/LER-1985-001-04, :on 850723,reactor Tripped Due to High RCS Pressure.Caused by Erroneous Signal from Failed Integrated Control Sys Module.Module Replaced + (08:49:13, 12 December 2024)
- 05000382/LER-1996-001, :on 951107,TS 3.0.3 Entered Due to SIT Levels Reading High.Caused by Poor Work Practices.Cr Staff Immediately Lowered SIT Levels Until within Specified Range for Compliance W/Tss + (08:49:15, 12 December 2024)
- ML20134L515 + (08:49:17, 12 December 2024)
- ML20134L514 + (08:49:17, 12 December 2024)
- ML20134L511 + (08:49:19, 12 December 2024)
- 3F1196-01, Forwards Rev 23 to Crystal River Unit 3,FSAR Which Satisfies Requirements of 10CFR50.71(e)(4) & Includes Matl Which Describes Organization,Mods or Changes to CR-3 That Have Been Implemented as of End of Refuel 10 + (08:49:20, 12 December 2024)
- PY-CEI-NRR-2140, Monthly Operating Rept for Jan 1997 for Perry Unit 1 + (08:49:22, 12 December 2024)
- ML20134L505 + (08:49:23, 12 December 2024)
- PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry + (08:49:23, 12 December 2024)
- DD-96-13, Informs That Time Provided by NRC Regulation for Commission to Act to Review Directors Decision DD-96-13 Has Expired. Decision Became Final Agency Action on 961101.W/Certificate of Svc.Served on 961115 + (08:49:24, 12 December 2024)
- ML20134L501 + (08:49:28, 12 December 2024)
- ML20134L496 + (08:49:29, 12 December 2024)
- ML20134L494 + (08:49:30, 12 December 2024)
- ML20134L492 + (08:49:31, 12 December 2024)
- ML20134L490 + (08:49:31, 12 December 2024)
- ML20134L489 + (08:49:32, 12 December 2024)
- 05000412/LER-1996-005-01, :on 961011,motor Control Ctr Auxiliary Control Relays Failed Due to Thermal Aging.Replaced 203 Active J12 Relays + (08:49:35, 12 December 2024)
- DD-96-15, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-15 Expired.Decision Final Agency Action on 961112.W/certificate of Service.Served on 961115 + (08:49:37, 12 December 2024)
- ML20134L482 + (08:49:37, 12 December 2024)
- ML20134L479 + (08:49:40, 12 December 2024)