Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000710/2009004 + (07:54:24, 12 December 2024)
- ML20135A481 + (07:54:25, 12 December 2024)
- ML20135A480 + (07:54:25, 12 December 2024)
- ML20135A479 + (07:54:26, 12 December 2024)
- ML20135A477 + (07:54:27, 12 December 2024)
- ML20135A478 + (07:54:27, 12 December 2024)
- ML20135A473 + (07:54:32, 12 December 2024)
- NG-96-2514, Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Core Spray Sparger Insp Results,Provided + (07:54:32, 12 December 2024)
- ML20135A470 + (07:54:33, 12 December 2024)
- ML20135A468 + (07:54:34, 12 December 2024)
- IR 05000810/2009003 + (07:54:35, 12 December 2024)
- 05000302/LER-1996-018-01, Forwards Suppl LER 96-018-01 Identifying Changes Resulting from Comprehensive Review of Flow Diagrams,Procedure,Design Basis Documents & Licensing Basis Info Required to Be Performed IAW Original LER + (07:54:38, 12 December 2024)
- ML20135A463 + (07:54:39, 12 December 2024)
- ML20135A462 + (07:54:40, 12 December 2024)
- ML20135A461 + (07:54:41, 12 December 2024)
- ML20135A458 + (07:54:42, 12 December 2024)
- ML20135A457 + (07:54:43, 12 December 2024)
- BVY-96-152, Responds to RAI Re Request for Exemption for 10CFR50,App R, Section Iii.G + (07:54:44, 12 December 2024)
- ML20135A454 + (07:54:44, 12 December 2024)
- ML20135A453 + (07:54:45, 12 December 2024)
- ML20135A451 + (07:54:46, 12 December 2024)
- ML20135A452 + (07:54:46, 12 December 2024)
- ML20135A450 + (07:54:47, 12 December 2024)
- ML20135A449 + (07:54:48, 12 December 2024)
- BVY-96-151, Informs That Installation of Improved Fire Protection Sys Will Be Completed by 961231 Instead of 961130 + (07:54:49, 12 December 2024)
- ML20135A447 + (07:54:50, 12 December 2024)
- IR 05000440/1985057 + (07:54:51, 12 December 2024)
- ML20135A445 + (07:54:51, 12 December 2024)
- IR 05000282/1996013 + (07:54:52, 12 December 2024)
- ML20135A443 + (07:54:53, 12 December 2024)
- IR 05000423/1985034 + (07:54:56, 12 December 2024)
- ML20135A441 + (07:54:57, 12 December 2024)
- ML20135A439 + (07:55:01, 12 December 2024)
- IR 05000458/1985041 + (07:55:04, 12 December 2024)
- ML20135A436 + (07:55:04, 12 December 2024)
- ML20135A434 + (07:55:05, 12 December 2024)
- ML20135A431 + (07:55:06, 12 December 2024)
- ML20135A432 + (07:55:06, 12 December 2024)
- ML20135A429 + (07:55:07, 12 December 2024)
- ML20135A426 + (07:55:08, 12 December 2024)
- ML20135A427 + (07:55:08, 12 December 2024)
- ML20135A425 + (07:55:09, 12 December 2024)
- ML20135A420 + (07:55:10, 12 December 2024)
- ML20135A419 + (07:55:10, 12 December 2024)
- 05000317/LER-1985-008, :on 850806,main Turbine Tripped on High Moisture Separator Reheater Level.Caused by High Level Dump Manual Isolation Valve Being Left in Shut Position After Maint Performed.Work Forms Modified + (07:55:12, 12 December 2024)
- ML20135A416 + (07:55:13, 12 December 2024)
- ML20135A415 + (07:55:14, 12 December 2024)
- ML20135A413 + (07:55:15, 12 December 2024)
- 05000271/LER-1996-006, :on 960214,potentially Inoperable RHR Svc Water Valves Noted.Caused by mfg-fabrication Deficiency.Priority Work Orders Written to Inspect & Torque Bolts on Valves.W/ + (07:55:16, 12 December 2024)
- SNRC-1203, Responds to NRC Transmitting Clarifications of & Insp Rept 50-322/85-04 Re post-accident Sampling.Scheduled Completion Date for Several Items Not Met Due to Recent Startup Test Program Activity + (07:55:17, 12 December 2024)
- 05000331/LER-1996-006, :on 961026,non-conservative APRM 15% Scram Setpoint Occurred Due to Inadequate Procedures.Oss Immediately Halted Core Alterations & Verified That All CR Were Fully Inserted + (07:55:19, 12 December 2024)