Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000282/1996014 + (07:40:25, 12 December 2024)
- ML20135B727 + (07:40:26, 12 December 2024)
- ML20135B723 + (07:40:27, 12 December 2024)
- ML20135B721 + (07:40:27, 12 December 2024)
- ML20135B720 + (07:40:28, 12 December 2024)
- ML20135B719 + (07:40:29, 12 December 2024)
- ML20135B718 + (07:40:29, 12 December 2024)
- 05000313/LER-1996-006, :on 960527,EDGs Were Declared Inoperable Due to Excessive Water in Fuel Oil Sys.Drained,Cleaned & Inspected T-25,increased Height of Nozzles in T-25 by Six Inches & Revised Sampling Procedures + (07:40:31, 12 December 2024)
- ML20135B715 + (07:40:32, 12 December 2024)
- ML20135B714 + (07:40:33, 12 December 2024)
- IR 05000341/1996015 + (07:40:34, 12 December 2024)
- 05000368/LER-1996-004-04, :on 961030,potential Failure of Functions of Plant Protective Sys Were Determined During Loss of Power. Cause Indeterminate.Established Administrative Controls to Prevent Channel from Being Bypassed + (07:40:37, 12 December 2024)
- ML20135B711 + (07:40:38, 12 December 2024)
- ML20135B707 + (07:40:39, 12 December 2024)
- 05000414/LER-1996-005-06, :on 961028,determined That Plant May Have Operated in Standby Shutdown Sys Potentially Outside of Design Basis.Caused by Inadequate Sys Design Bases.Placed Vent Valves in Planned Maint Schedule + (07:40:42, 12 December 2024)
- ML20135B705 + (07:40:43, 12 December 2024)
- ML20135B704 + (07:40:44, 12 December 2024)
- ML20135B703 + (07:40:45, 12 December 2024)
- ML20135B702 + (07:40:45, 12 December 2024)
- ML20135B701 + (07:40:47, 12 December 2024)
- B16044, Submits Change in Schedule for Completion of GL 96-01 Actions as Commited to by Util for Plant,Unit 2 in Ltr + (07:40:48, 12 December 2024)
- ML20135B694 + (07:40:49, 12 December 2024)
- ML20135B692 + (07:40:51, 12 December 2024)
- ST-HL-AE-0055, Submits Revs to Valve Relief Requests RR-55,RR-53 Rev 1 & RR-34 Rev 1 for Unit 1 & RR-51,RR-49 Rev 1 & RR-31 Rev 1 for Unit 2 to Use Alternate Testing Frequency in Assessing Operational Readiness.W/Three Oversize Drawings + (07:40:52, 12 December 2024)
- 05000336/LER-1985-004, :on 850314,sufficient Tubes in Each Steam Generator Had Flaws Greater than 40% through-wall to Place Steam Generators in Category C.3 of Tech Spec Table 4.4-6. Sludge Lancing & Chemical Cleaning Initiated + (07:40:55, 12 December 2024)
- ML20135B689 + (07:40:56, 12 December 2024)
- ML20135B688 + (07:40:57, 12 December 2024)
- ML20135B686 + (07:40:57, 12 December 2024)
- ML20135B685 + (07:40:58, 12 December 2024)
- ML20135B682 + (07:41:00, 12 December 2024)
- ML20135B681 + (07:41:01, 12 December 2024)
- ML20135B678 + (07:41:02, 12 December 2024)
- ML20135B677 + (07:41:02, 12 December 2024)
- ML20135B676 + (07:41:03, 12 December 2024)
- IR 05000263/1996008 + (07:41:04, 12 December 2024)
- 2CAN119604, Forwards Response to RAI Dtd 960520,re ANO-2 SG Tube Sleeves + (07:41:05, 12 December 2024)
- ML20135B674 + (07:41:05, 12 December 2024)
- ML20135B671 + (07:41:06, 12 December 2024)
- 05000354/LER-1996-024-01, :on 961029,two Redundant Vacuum Breakers on a Station Svc Water Sys Loop Were Tested & Found Inoperable Due to Accumulation of Deposits on Internal Moving Parts. Both Vacuum Breakers on a Station,Repaired + (07:41:08, 12 December 2024)
- ML20135B667 + (07:41:09, 12 December 2024)
- ML20135B665 + (07:41:10, 12 December 2024)
- ML20135B664 + (07:41:11, 12 December 2024)
- ML20135B662 + (07:41:12, 12 December 2024)
- ML20135B661 + (07:41:13, 12 December 2024)
- ML20135B656 + (07:41:14, 12 December 2024)
- 05000213/LER-1985-021, :on 850805,open Fire Barrier Discovered Between Cable Spreading Area & Maint Hot Shop.Caused by Exclusion of Sheet Metal Wall Section from Fire Barrier Penetration Program.Program Reviewed & Will Be Revised + (07:41:16, 12 December 2024)
- ML20135B654 + (07:41:17, 12 December 2024)
- PY-CEI-NRR-0333, Forwards Proposed FSAR App 1B, License Commitments, Including Shift Operating Experience,Tmi Item I.G.1, Inservice Insp Program Reg Guide 1.97,per SER Commitments. Generic Conditions Not Included + (07:41:18, 12 December 2024)
- ML20135B652 + (07:41:19, 12 December 2024)
- PY-CEI-NRR-0337, Responds to NRC 850715 Request for Addl Info Re ASME Code Class 1 Pipe Break Locations.Branch Connection to Feedwater Line Outside Containment Up to Reactor Water Cleanup Line Evaluated for Pipe Whip & Jet Impingement.Break Unlikely + (07:41:19, 12 December 2024)
- ML20135B650 + (07:41:20, 12 December 2024)
- 05000255/LER-1985-012, :on 850807,determined That Quarterly Tests of Five Containment Isolation Valves Not Performed Per Tech Spec 4.5.2.d.2.Caused by Personnel Error.Administrative Controls for Surveillance Program Corrected + (07:41:22, 12 December 2024)