Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000458/1985070 + (06:24:44, 12 December 2024)
- ML20136B770 + (06:24:44, 12 December 2024)
- ML20136B769 + (06:24:45, 12 December 2024)
- ML20136B768 + (06:24:46, 12 December 2024)
- ML20136B766 + (06:24:46, 12 December 2024)
- ML20136B765 + (06:24:48, 12 December 2024)
- ML20136B764 + (06:24:48, 12 December 2024)
- 05000289/LER-1997-001-02, :on 970117,potential Overpressurization of Piping Between Closed Reactor Building Containment Isolation Valves Occurred Due to Inadequate Design Code Guidance. Results of Review Will Be Documented.Pages 2 & 3 Corrected + (06:24:50, 12 December 2024)
- ML20136B758 + (06:24:51, 12 December 2024)
- ML20136B755 + (06:24:52, 12 December 2024)
- 05000289/LER-1997-001, Forwards Corrected Copy of LER 97-001-00 Re Condition Found During Review of GL 96-06 + (06:24:53, 12 December 2024)
- ML20136B752 + (06:24:53, 12 December 2024)
- ML20136B748 + (06:24:54, 12 December 2024)
- ML20136B744 + (06:24:55, 12 December 2024)
- ML20136B746 + (06:24:55, 12 December 2024)
- ML20136B742 + (06:24:57, 12 December 2024)
- ML20136B741 + (06:24:58, 12 December 2024)
- ML20136B738 + (06:24:59, 12 December 2024)
- ML20136B737 + (06:25:00, 12 December 2024)
- ML20136B735 + (06:25:00, 12 December 2024)
- ML20136B734 + (06:25:01, 12 December 2024)
- B16293, Annual Rept Jan-Dec 1996 + (06:25:02, 12 December 2024)
- ML20136B731 + (06:25:03, 12 December 2024)
- 05000259/LER-1979-016-03, /03L-0:on 790804,during Normal Operation,Starter Bus 1B Normal Feeder Breaker Found Discharged,Making Breaker Inoperable for Closure.Caused by Damaged Breaker Spring Charging Motor Commutator.Motor Replaced + (06:25:05, 12 December 2024)
- ML20136B726 + (06:25:07, 12 December 2024)
- ML20136B728 + (06:25:07, 12 December 2024)
- ML20136B724 + (06:25:08, 12 December 2024)
- 05000259/LER-1979-016, Forwards LER 79-016/03L-0 + (06:25:08, 12 December 2024)
- ML20136B722 + (06:25:09, 12 December 2024)
- ML20136B721 + (06:25:10, 12 December 2024)
- ML20136B717 + (06:25:11, 12 December 2024)
- ML20136B718 + (06:25:11, 12 December 2024)
- ML20136B716 + (06:25:12, 12 December 2024)
- ML20136B715 + (06:25:13, 12 December 2024)
- ML20136B712 + (06:25:13, 12 December 2024)
- ML20136B710 + (06:25:14, 12 December 2024)
- ML20136B709 + (06:25:15, 12 December 2024)
- ML20136B706 + (06:25:15, 12 December 2024)
- ML20136B705 + (06:25:17, 12 December 2024)
- ML20136B702 + (06:25:18, 12 December 2024)
- ST-HL-AE-5587, Forwards Response to Request for Addl Info Re Steam Generator Tube Voltage-Based Repair Criteria 90-day Rept + (06:25:18, 12 December 2024)
- ML20136B701 + (06:25:19, 12 December 2024)
- ML20136B698 + (06:25:20, 12 December 2024)
- JPN-97-009, Forwards ISI Summary Rept for JAFNPP Which Provides Summary of ISI Exams Conducted During 1996 Refuel Outage & Info Re Operating Status of Feedwater Nozzle Leakage Monitoring Sys & Measured Leakage for Feedwater Nozzles + (06:25:21, 12 December 2024)
- ML20136B688 + (06:25:22, 12 December 2024)
- ML20136B694 + (06:25:22, 12 December 2024)
- ML20136B686 + (06:25:23, 12 December 2024)
- ML20136B684 + (06:25:24, 12 December 2024)
- ML20136B685 + (06:25:24, 12 December 2024)
- 05000338/LER-1985-021-01, :on 851122,health Physics Supervisor Realized Clarifier Demineralizer Out of Svc When Tech Spec 3.11.1.3 Required Sys to Be in Svc.Evaluation of Methods to Increase Cesium Removal Capabilities Initiated + (06:25:26, 12 December 2024)
- ML20136B680 + (06:25:27, 12 December 2024)
- ML20136B678 + (06:25:28, 12 December 2024)