- ML20137D042 + (05:03:48, 12 December 2024)
- ML20137D039 + (05:03:49, 12 December 2024)
- ML20137D038 + (05:03:50, 12 December 2024)
- ML20137D035 + (05:03:52, 12 December 2024)
- ML20137D032 + (05:03:52, 12 December 2024)
- 05000323/LER-1985-009-01, :on 851022,generator & Reactor Trip Occurred. Caused by Technician Inadvertently Actuating Current Test Block of Main Generator Differential Relay.Technician Counseled & Instructions Installed on Panel + (05:03:55, 12 December 2024)
- ML20137D026 + (05:03:56, 12 December 2024)
- ML20137D014 + (05:03:57, 12 December 2024)
- ML20137D013 + (05:03:58, 12 December 2024)
- ML20137D006 + (05:03:59, 12 December 2024)
- ML20137D005 + (05:03:59, 12 December 2024)
- 05000316/LER-1985-041-01, :on 851211,at 81% Reactor Thermal Power,High Alarm Received on Upper Containment Normal Range Area Monitor,Train B After Instrument Failed Low.Investigation Into Cause Continuing + (05:04:01, 12 December 2024)
- NPL-97-0104, Forwards Documentation for Review to Support Restart Issues Identified on Unit 2 Startup Commitment List + (05:04:02, 12 December 2024)
- ML20137C992 + (05:04:03, 12 December 2024)
- B16327, Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station Unit 3 + (05:04:04, 12 December 2024)
- ML20137C984 + (05:04:05, 12 December 2024)
- ML20137C987 + (05:04:05, 12 December 2024)
- ML20137C983 + (05:04:07, 12 December 2024)
- 05000281/LER-1985-011-02, :on 851023,emergency Diesel Generator (EDG) Automatically Started.Caused by Inadequate Design Change Test Procedure.Control of EDG 2 Transferred to Main Control Room Panel & Diesel Shut Down + (05:04:08, 12 December 2024)
- ML20137C978 + (05:04:10, 12 December 2024)
- ML20137C975 + (05:04:10, 12 December 2024)
- ML20137C974 + (05:04:11, 12 December 2024)
- ML20137C971 + (05:04:12, 12 December 2024)
- ML20137C966 + (05:04:13, 12 December 2024)
- ML20137C967 + (05:04:13, 12 December 2024)
- NPL-97-0090, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (05:04:14, 12 December 2024)
- ML20137C960 + (05:04:15, 12 December 2024)
- ML20137C961 + (05:04:15, 12 December 2024)
- ML20137C959 + (05:04:16, 12 December 2024)
- 05000312/LER-1984-016, :on 840425,RCS Pump Seal Return Line Isolation Valve Exceeded Tech Spec Stroke Time Limit.Caused by Weaknesses in Documentation & Surveillances of Equipment. Valve Restroked.Surveillance Procedure Revised + (05:04:18, 12 December 2024)
- ML20137C954 + (05:04:19, 12 December 2024)
- ML20137C952 + (05:04:20, 12 December 2024)
- ML20137C946 + (05:04:21, 12 December 2024)
- ML20137C945 + (05:04:21, 12 December 2024)
- 05000458/LER-1985-017, :on 851025,ESF Isolation of Shutdown Cooling Section Valve Occurred.Caused by Inadvertent Grounding of Recorder Lead During Attempt to Attach to Relay Terminal. Fuse Replaced.Procedure STP-204-0602 Revised + (05:04:23, 12 December 2024)
- 05000528/LER-1985-087, :on 851209,discovered That Response Time for Loss of Power Relays Did Not Meet Acceptance Criteria.Unit Entered Mode 3 on 851128 W/O Meeting Action Statement + (05:04:25, 12 December 2024)
- ML20137C941 + (05:04:26, 12 December 2024)
- 05000318/LER-1985-012-01, :on 851212,during Mode 1,reactor Tripped on Low Steam Generator Water Due to Loss of Steam Generator Feed Pump 21.Caused by Defective High Signal Selector.Selector Replaced + (05:04:28, 12 December 2024)
- 05000220/LER-1985-025, :on 851215,reactor Power Reduction Initiated Due to Inability to Monitor Specified Core Thermal Parameters.Caused by Plant Process Computer Failure. Reactor Power Restored + (05:04:30, 12 December 2024)
- 05000483/LER-1985-053, :on 851209,discovered That Penetration 98 (P-98) Not Included in Surveillance Procedure Used to Satisfy Tech Spec 3/4.6.1.1.Caused by Personnel error.P-38 Verified Closed.Procedure Will Be Revised + (05:04:32, 12 December 2024)
- 05000458/LER-1985-018, :on 851021,RHR Sys Loop a Isolation Occurred. Caused by Technician Mistakenly Connecting Lead to Wrong Relay & Then Misinterpreting Relay Drawings.Isolation Reset. Test Jacks Added to Terminals + (05:04:34, 12 December 2024)
- ML20137C924 + (05:04:35, 12 December 2024)
- ML20137C922 + (05:04:36, 12 December 2024)
- ML20137C920 + (05:04:37, 12 December 2024)
- ST-HL-AE-1572, Forwards Response to Draft SER Item 61F Re Proportional Integral Derivitive Controller mod,NUREG-0737,II.K.3.9. Requests That NRC Consider Item closed.Marked-up FSAR Page Will Be Included in Future FSAR Amend + (05:04:38, 12 December 2024)
- 05000382/LER-1985-053, :on 851212,discovered That Portion of Core Protection Calculator Tech Spec Functional Test Not Performed for Several Intervals.Caused by Procedural Change Eliminating Requirement.Procedure Changed + (05:04:40, 12 December 2024)
- ML20137C913 + (05:04:41, 12 December 2024)
- ML20137C911 + (05:04:42, 12 December 2024)
- ML20137C908 + (05:04:43, 12 December 2024)
- ML20137C907 + (05:04:44, 12 December 2024)
- ML20137C903 + (05:04:45, 12 December 2024)
- ML20137C900 + (05:04:48, 12 December 2024)